Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21.2 L
EMD Value
₹25,000
Closing Date
15 Jan 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
VARIOUS SITE NEW CONNECTION RELEASED AND SHIFTING WORK IN DEPOSIT HEAD AT RUNNING UNDER EDSD I IV AND CHARTHAWAL MZN
2025_PVVNL_991742_1
56/2024-25/EDC-I/MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EDD II MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I MZN
₹25,000
25 Jan 2025
9 Jan 2025
15 Jan 2025
9 Jan 2025
15 Jan 2025
9 Jan 2025
Amount
The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
25 KVA Distribution Transformer
63 KVA Distribution Transformer
100 KVA Distribution Transformer
250 KVA Distribution Transformer
PCC Pole 8.5/9.0 Meter
STP Pole 11 Meter
STP Pole 13 Meter
ACSR Weasel Conductor
ACSR Dog Conductor
ACSR Rabbit Conductor
LT PVC Cable 3.5x70/150/240/400 mm
11 KV XLPE Cable 3x70 Sqmm
11 KV XLPE Cable 3x120 Sqmm
11 KV XLPE Cable 3x185 Sqmm
11 KV XLPE Cable 3x300 Sqmm
LT ABC 1x16+1x25 Sqmm
LT ABC 3x50+1x35+1x16 Sqmm
LT ABC 3x95+1x70+1x16 Sqmm
LT ABC 3x120+1x95+1x16 Sqmm
1Ph Distribution Box
3Ph Distribution Box
11 KV FUSE SET
11 KV TPMO
11 KV CT/PT Combiend Unit Required as per Size
11 KV PILFER RESISTANT Meter Cubical Required as per Size
11 KV Outdoor Jointing Kit Required as per Size
11 KV Indoor Jointing Kit Required as per Size
33 KV METERING CUBICAL UNIT Required as per Size
33 KV CT/PT METERING POLE MOUNTED UNIT Required as per Size
33 KV Outdoor Jointing Kit Required as per Size
33 KV Indoor Jointing Kit Required as per Size
LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the established electric poles installed as per RESPO norms.
Complete work of Laying/Installing ACSR DOG CONDUCTOR on the established electric poles installed as per RESPO norms.
Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the established electric poles installed as per RESPO norms.
Complete work of 11 KV XLPE CABLE 3x70 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of 11 KV XLPE CABLE 3x120 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of 11 KV XLPE CABLE 3x185 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of 11 KV XLPE CABLE 3x300 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of LT ABC 1x16+1x25 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of LT ABC 3x50+1x35+1x16 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of LT ABC 3x120+1x95+1x16 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of Preparing the trench at the site and installing the cable as per RESPO norms.
Complete Work of Installing underground cable at the site as per RESPO norms.
Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Single Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning 25 KVA Distribution Transformer on established Double pole as per RESPO standards.
Complete work of Installing and Commissioning 63 KVA Distribution Transformer on established Double pole as per RESPO standards.
Complete work of Installing and Commissioning 100 KVA Distribution Transformer on established Double pole as per RESPO standards.
Complete work of Installing and Commissioning 250 KVA Distribution Transformer on established Plinth as per RESPO standards.
25 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards.
63 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards.
100 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards.
Complete work of Making New plinth for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Making New Fencing for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning 33 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards.
Complete work of Installing and Commissioning 33 KV METERING CUBICAL UNIT as per RESPO standards.
Complete work of Installing and Commissioning 33 KV Outdoor Jointing Kit as per RESPO standards.
Complete work of Installing and Commissioning 33 KV Indoor Jointing Kit as per RESPO standards.
Complete work of Installing and Commissioning 11 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards.
Complete work of Installing and Commissioning 11 KV PILFER RESISTANT Meter Cubical as per RESPO standards.
Complete work of Installing and Commissioning LT 3P Distribution Box as per RESPO standards.
Complete work of Installing and Commissioning LT 1P Distribution Box as per RESPO standards.
Complete work of Installing and Commissioning 11 KV Outdoor Jointing Kit as per RESPO standards.
Complete work of Installing and Commissioning 11 KV Indoor Jointing Kit as per RESPO standards.
Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards.
Complete work of Installing and Commissioning 11 KV TPMO as per RESPO standards.
Complete work of installation of Stay Set Complete with Concreting on established Double pole & Single Pole of Line As per the RESPO standards.
Complete work of Pipe Earthing (upto Water Level) of established Distribution Transformer / CT/PT UNIT & Meter CUBICLE as per RESPO standards.
Complete work of Chemical Earthing of established Distribution Transformer / CT/PT UNIT & Meter CUBICLE as per RESPO standards.
Complete work of straightening slanted electric pole as per RESPO standards.
Complete work of Pole concreting on established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Earthing completing by establishing earthing road of Stablished Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of guarding on the established Pole of the Line as per RESPO standards. by GI wire and MS angle as per size
Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
Complete work of Pulling / Resaging the Span wires by shifting the Line / Electric pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Road Restoration Charges for Footpath Side as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of cutting and pruning the branches of trees standing between the Line installed and shifting place/route.
Supply of NUT & BOLT as per RESPO standards
Supply of DEAD & CLAMP as per RESPO standards
Supply of LT CLAMP as per RESPO standards
Supply of SUSPENSION CLAMP as per RESPO standards
Supply of PIERCING CLAMP as per RESPO standards
Supply of TOP CLAMP as per RESPO standards
Supply of DP CLAMP as per RESPO standards
Supply of LT SHAKLE INSULATOR as per RESPO standards
Supply of X-ARM HOLDING CLAMP as per RESPO standards
Supply of F-CLAMP as per RESPO standards
Supply of STONE PAD 300x300x75 MM as per RESPO standards
Supply of PG CLAMP as per RESPO standards
Supply of J-HOOK as per RESPO standards
Supply of HDPE PIPE as per RESPO standards
Supply of GI PIPE 6"DIA as per RESPO standards
SUNDRIES ITEMS
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
25 KVA Distribution Transformer OLD & USED / DAMAGE
63 KVA Distribution Transformer OLD & USED / DAMAGE
100 KVA Distribution Transformer OLD & USED / DAMAGE
STP OLD & USED / DAMAGE
LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) OLD & USED / DAMAGE
M/S Vikas Enterprises (BID ID -4853813)
M/S Rachna Enterprises (BID ID -4853907)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .