| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹9.1 L+₹4,473.82 (0.50%)Rejected-Finance | L2 | Rejected-Finance Highest Rate |
| Sl No | Description | Qty | Unit | A LENIN L2 | K RAJARAJAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Kitchen Shed at PUE School in Keelakurichi Panchayat. | |||||
| 2.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. | 27.22 | Cu.m | 270 ₹7,349.4 | 263 ₹7,158.86 Lowest |
| 3.00 | Collection and supply of Sand filling with M sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete. | 4.64 | Cu.m | 2,415 ₹11,205.6 | 2,411 ₹11,187.04 Lowest |
| 4.00 | Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 4.52 | Cu.m | 6,365 ₹28,769.8 | 6,361 ₹28,751.72 Lowest |
| 5.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ Hard granite blue stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete as directed by departmental officer etc., complete. | 14.37 | Cu.m | 10,260 ₹1,47,436.2 | 10,258 ₹1,47,407.46 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete (Below basement) | 4.05 | Cu.m | 6,410 ₹25,960.5 | 6,406 ₹25,944.3 Lowest |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete Above basement) | 17.2 | Cu.m | 6,510 ₹1,11,972 | 6,499 ₹1,11,782.8 Lowest |
| 8.00Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | |||||
| 9.00 | Below GL | 26.62 | Sq.m | 550 ₹14,641 | 547.5 ₹14,574.45 Lowest |
| 10.00 | Above GL | 80.06 | Sq.m | 1,100 ₹88,066 | 1,095 ₹87,665.7 Lowest |
Tender Value
₹9.3 L
EMD Value
₹9,270
Closing Date
16 Oct 2025, 3:00 pmClosed
Block development officer(B.P)
Block development office madukkurThanjavur
Construction of Kitchen Shed Building at PUE School in Keelakurichi Panchayat. Under STATE AND CENTRAL FINANCE 2025-26
2025_RDTN_612719_1
RC.No.2497/2025/A5 Date.08.10.2025
Open Tender
Civil Works - Buildings
Item Wise
60 days
Block development office madukkurThanjavur
As per Tender bid document.
8 documents required · 8 mandatory
₹0
₹9,270
Yes
Block development office madukkurThanjavur
13 Nov 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
16 Oct 2025
10 Oct 2025
10 Oct 2025
Amount
Construction of Kitchen Shed at PUE School in Keelakurichi Panchayat.
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
Collection and supply of Sand filling with M sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ Hard granite blue stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete as directed by departmental officer etc., complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete (Below basement)
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete Above basement)
Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Below GL
Above GL
Suppling, fabricating and placing in position of MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering surfaces of RCC items such as slabs,beams,sunshades with cement mortar 1:3 -10mm thick including packing, providing cement mortar beading for sunshades staircase ,steps, lands slabs etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with CM 1:5,12mm thick including cost and conveyance of all materials to site and all labour charges etc.,complete
Brick jelly lime concrete using 20mm brick jelly with of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying ,and finishing etc complete
Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification
Providing granolithic flooring with CC 1:2:4 mix 25 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Supplying of steel doors, ventilators and windows including cost of steel plates, angles , labour charges etc complete
steel door ( 0.90 x 2.10 m )
steel window ( 0.90 x 1.20 m )
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete
Provision for Electrification
Light & Fan Point SD 18
Plug Point SD 38
Ceiling Fan SD 110
Electrification -4'40W Tube SD 88
Provision for Plinth Protection
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complete
Brick work in CM 1:5, using country bricks, including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc compete.
Providing Granolithic flooring with CC 1:2:4, using 10-12 mm chips, 25 mm tk, including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc compete.
Plastering in CM 1:5, 12 mm tk, including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc compete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A LENIN (BID ID -1489827)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .