Construction of Drain/Nala from Rajkunwar Singh Ji House to New Civil Line Main Road.
2026_DLB_570794_3
Nirman 34/2026-27
Open Tender
Civil Works
60 days
Baran
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Aayukt Nagar Parishad Baran
₹19,680
Yes
24 Jun 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 162 | Cum. | 229.5 | ₹37,179 | BI01010001010000000000000515BI0100001136 |
| 2 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material | 27 | Cum. | 1,360 | ₹36,720 | BI01010001010000000000000515BI0100001137 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 18 | Cum. | 5,000 | ₹90,000 | BI01010001010000000000000515BI0100001138 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 72 | Cum. | 6,340 | ₹4,56,480 | BI01010001010000000000000515BI0100001139 |
| 5 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Hot rolled deformed bars | 2,260.8 | Kg. | 83.3 | ₹1,88,324.64 | BI01010001010000000000000515BI0100001140 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 600 | Sqm. | 236.5 | ₹1,41,900 | BI01010001010000000000000515BI0100001141 |
| 7 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth 5 KM. | 129.6 | Cum. | 254.76 | ₹33,016.9 | BI01010001010000000000000515BI0100001142 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
TechnicalRequirment.pdf
Tender Documents • 0.20 MB
BOQ_1015691.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid