Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | -20.00% | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L1₹3.1 LAdmitted-Finance | -20.00% | ₹3.1 L | L1 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,860
Closing Date
17 Jul 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti Panaji Goa
Reconstruction of roadside dranaige from Tony Carvalho house to John Vaz house at Muddo Vado Carona in V.P. Aldona in Aldona Z.P. Constituency.
2026_ZP_30221_1
NGZP/03/2026-27/46/276/L14
Open Tender
Civil Works
Percentage
150 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹7,860
23 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
17 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 12 | M3 | 1,122 | ₹13,464 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 2.7 | M3 | 2,211 | ₹5,969.7 |
| 3Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | All works upto plinth level | 23.4 | cu.m | 6,810 | ₹1,59,354 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 4.01 | Foundations, Footings, Bases for columns | 60 | sq.m | 407 | ₹24,420 |
| 5Supplying and fixing of Precast RCC slabs(factory made,the factory should be ISO certified and registered under Dirctorate of Industries, Govt. of India) at site in concrete Grade of M-25 with 20 mm nominal size Granitic or basaltic aggregate, consolidated by means of mechanical platform, vibration etc. with lifting hooks of M.s. 10mm bars and PVC cups including cost of reincforcement, Certificate from manufacturer shall be produced indicating grade of concret and minimum content of steel in the product along with 5 year free replacement warranty in case of breakage complete and as directed by Engineer -in -charge. | |||||
| 5.01 | Size 900 x 400 x 100 mm with steel reinforcement not less than 5.0 kgs per unit -12 T capacity | 130 | Nos. | 1,460 | ₹1,89,800 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_30634.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].