Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.6 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED DUE TO LOWEST RATE AND FULFILLING THE TECHNICAL CRITERIA AS PER NIT. | |
| 2 | L2₹49.8 L+₹12.9 L (34.8%)Rejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | L2 | Rejected-Finance REJECTED DUE TO HIGHER RATE AS PER TENDER COMMITTEE. | |
| 3 | Rejected-Technical | - | Rejected-Technical TECHNICALLY REJECTED. |
Tender Value
₹83.0 L
EMD Value
₹1.0 L
Closing Date
6 Apr 2023, 5:00 pmClosed
Staff Officer (Civil), SECL, JK Area
Office of The Staff Officer (Civil), Jamuna Kotma Area, District Anuppur, Madhya Pradesh, 484444 Contact No. 9425531831, Email Address - civil.jamunakotma(at)gmail.com.
Fencing by Random Rubble Masonry Around Quarry of Kotma Open Cast Mine under KGSA of Jamuna Kotma Area
2023_SECL_276095_1
SECL/JK/SO(C)/ETED/22-23/100 Dated 20/03/2023
Open Tender
Civil Works - Others
Item Rate
90 days
Kotma West Open Cast, KGSA, Jamuna Kotma Area
PLEASE REFER TENDER DOCUMENTS.
5 documents required · 5 mandatory
₹1.0 L
8 Feb 2024
21 Mar 2023
8 Apr 2023
21 Mar 2023
6 Apr 2023
22 Mar 2023
21 Mar 2023 - 30 Mar 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil.
Random rubble masonry with hard stone in foundation and plinth including levelling up at plinth level with : Mud Mortar.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 ( 1 Cement: 5 coarse sand : 10 graded stone aggregate 40 mm nominal size).
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand): Raised and cut pointing.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild Steel and Medium Tensile Steel Bars.
Total Impact of GST for The Purpose of CTC
ABADH KISHOR SHARMA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .