OFFICE OF THE CHIEF ENGINEER WW THROUGH EE EnM HP I DELHI JAL BOARD GOVT OF NCT OF DELHI HAIDERPUR WATER WORKS DELHI 110085
Renovation of HT static capacitor banks for motors at South pump house at CWPH HP I
2022_DJB_227301_12
NIT 7
Open Tender
Miscellaneous Works
Works
60 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹18,200
31 Aug 2022
4 Aug 2022
11 Aug 2022
4 Aug 2022
11 Aug 2022
4 Aug 2022
Dismantling of defective HT capacitor/fuses from the existing structures including dismantling of terminations and existing hardware etc. as required at site.
Supply of capacitor unit rated at 200 kVAr,3.3 KV,3 phase, 50 Hz system for 500 HP/575HP/450HP motors, as per sample of existing capacitor bank installed at site complete with terminal cover, cable end entry, mounting structure and hardware etc. Unit would include all accessories required for proper fitting
Supply of 100A, 3.3 kV HRC fuse complete with mounting links and hardware etc. as required at site- make - ESWARI-ANAND/Standard
Painting of the panel including treatment with chemical solutions for removal of rust etc. rubbing for clearing rusted particles, applying a coat of primer and there-after spray painting with matching paint shade to ensure uniformity.
Installation of capacitor bank along with fuses (For 4 nos. bank only), post insulators with hardware on the mounting structure and termination of existing cables and lugs, complete with earthing etc. as required at site
Testing & commissioning of capacitor bank per required parameters including following: i. Continuity and earth test. ii. Meggering of all equipment for phase to phase and phase to earth. iii. Checking of tightness of all nut and bolts. iv. Maintaining of power factor 0.98 and above during guarantee period.
Premier Engineering Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .