| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LQualified 3RD FLOOR ROOM NO 14 DALHOUSIE KOLKATA 700001 WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹5 L+₹5,000 (1.01%)Not Evaluated 201 202 2ND FLOOR KAATYAYNI BUSINESS CENTRE OFF MAHAKALI CAVES ROAD M I D C ANDHERI EAST MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | L2 | Not Evaluated | |
| 3 | L3₹5.3 L+₹34,950 (7.06%)Not Evaluated C 703 MULBERRY MEADOWS GODREJ HILL KHADAKPADA THANE MAHARASHTRA 421301 | THANE | MAHARASHTRA | 421301 | L3 | Not Evaluated | |
| 4 | L4₹5.8 L+₹80,000 (16.2%)Not Evaluated 128 H 2 125 KIDWAI NAGAR KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | L4 | Not Evaluated | |
| 5 | L5₹6.4 L+₹1.4 L (28.7%)Not Evaluated 211 212 AGGARWAL TOWERH 6 NETAJI SUBHASH PLACE DISTT CENTRE PITAMPURA DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | L5 | Not Evaluated Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
5 Sept 2025, 2:00 pmClosed
Insulating Oil For Transformer As Per POWERGRID TS (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6579199 Dated : 25-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Regional Director
NRBPSU NRB Purchase & Stores Unit
6th Floor
South Wing
Vikram Sarabhai Bhavan (VSB
Anushaktinagar
Mumbai - 400 094 (Ref. no. DPS/NRBPSU/03/N2/1616) (A K Jha) Splitting
8232361
GEM/2025/B/6579199
Single Packet Bid
Insulating Oil For Transformer As Per POWERGRID TS (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
15 days
Pillai 401502, BARC TARAPUR COMPLEX, PO GHIVALI, BOISAR WEST DISTRICT PALGHAR MAHARSHTRA PIN
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
25 Aug 2025
25 Aug 2025
5 Sept 2025
Insulating Oil For Transformer As Per POWERGRID TS (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6579199 Dated : 25-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Regional Director
NRBPSU NRB Purchase & Stores Unit
Vikram Sarabhai Bhavan (VSB
Mumbai - 400 094 (Ref. no. DPS/NRBPSU/03/N2/1616) (A K Jha) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8232361.pdf
GEM_BID
powergrid_spec_2020-12-14-11-45-39_ee4acf506ffdb0420ff7af68c08b9433.pdf
SPECIFICATION
Hind_2bdcd0bb-9ebe-4d13-8b2f1755501888173_apon2.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .