| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 3₹18.5 LAccepted-Finance | ₹18.5 L | 3 | Accepted-Finance L3 |
| 2 | 1₹16.2 LRejected-Finance | ₹16.2 L | 1 | Rejected-Finance L1 |
| 3 | 2₹16.7 LRejected-Finance | ₹16.7 L | 2 | Rejected-Finance L2 |
| 4 | 4₹18.9 LRejected-Finance | ₹18.9 L | 4 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | J DASS L1 | P Sampath L3 | SUSEELA L2 | Selvarajan Civil Work Contractor L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 16.02 | Cum | 263.78 ₹4,225.76 | 263.78 ₹4,225.76 | 235 ₹3,764.70 | 263.78 ₹4,225.76 |
| 2.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., | 102.8 | Cum | 4,700 ₹4.8 L | 5,344.82 ₹5.5 L | 4,870 ₹5.0 L | 5,450 ₹5.6 L |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 86.78 | Cum | 2,000 ₹1.7 L | 2,475 ₹2.1 L | 2,200 ₹1.9 L | 2,475.67 ₹2.1 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surfaces for Sidewalls Concreting including all cost & conveyance of all materials & labour charges ,etc complete complying with standard specifications | 320.4 | SQM | 160 ₹51,264 | 182 ₹58,312.80 | 160 ₹51,264 | 182.5 ₹58,473 |
| 5.00 | Cement Concrete in 1:2:4 mix using 20 mm IS HBG metal including all cost & conveyance of all materials & labour charges ,etc complete | 105.13 | Cum | 5,850 ₹6.2 L | 6,635 ₹7.0 L | 6,000 ₹6.3 L | 6,800 ₹7.1 L |
| 6.00 | Providing Bitumen pad including all cost and conveyance of materials and labour charges etc complete | 12.92 | sqm | 475 ₹6,137 | 475 ₹6,137 | 450 ₹5,814 | 479 ₹6,188.68 |
| 7.00 | Providing Power trowell including all cost and conveyance of materials and labour charges etc complete | 867.75 | sqm | 45.85 ₹39,786.34 | 45.85 ₹39,786.34 | 40 ₹34,710 | 45.85 ₹39,786.34 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18% | 1 | GST Amount | 2,47,165.85 ₹2.5 L | 2,82,640.94 ₹2.8 L | 2,55,219.25 ₹2.6 L | 2,87,758.15 ₹2.9 L |
Tender Value
₹18.8 L
EMD Value
₹19,000
Closing Date
10 Feb 2026, 3:00 pmClosed
the block develoment officer bp tkm
the block develoment officer bp tkm
Providing of CC Road to Aadhiahavidar Colony at Vilagam Panchayat in Thirukazhukundram Panchayat Union
2026_RDTN_650356_1
3960/2025/a2
Open Tender
Civil Works - Others
Providing of CC Road to Aadhiahavidar Colony at V
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
Yes
19 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Supplying and erecting centering shuttering including necessary supports for plane surfaces for Sidewalls Concreting including all cost & conveyance of all materials & labour charges ,etc complete complying with standard specifications
Cement Concrete in 1:2:4 mix using 20 mm IS HBG metal including all cost & conveyance of all materials & labour charges ,etc complete
Providing Bitumen pad including all cost and conveyance of materials and labour charges etc complete
Providing Power trowell including all cost and conveyance of materials and labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_779771.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_779771.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid