| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC 41 SARVODAYA INDUSTRIAL ESTATE OFF MAHAKALI CAVES ROAD NEAR PAPER BOX MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹4.7 Cr | L1 | Accepted-AOC Successful Bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not meeting Experience criteria. |
Tender Value
₹4.6 Cr
EMD Value
₹9.1 L
Closing Date
26 Jun 2023, 6:00 pmClosed
Asstt.Gen.Manager (E-E)
Room No.202/15, Airports Authority of India, ATS Complex, Sutar Pakhadi Road, Andheri (East), Mumbai - 400 099.
Precision Air-conditioning works for the installation of New Automation System and ASMGCS at ATS Complex and Sky Tower, Mumbai - Phase-I and II
2023_AAI_156153_1
MUM/ATS/ENGG-E/eNIT-01/2023-24
Open Tender
Electrical Works
Works
180 days
Electrical Engineering Wing, ATS Complex, Mumbai
Qualifying Criteria as per PQ performa
6 documents required · 6 mandatory
₹1,180
₹9.1 L
11 Aug 2023
3 Jun 2023
27 Jun 2023
3 Jun 2023
26 Jun 2023
3 Jun 2023
3 Jun 2023 - 23 Jun 2023
Amount
SH-A :Supply of PAC Units
Operational & Control Features - Supply Air Set points & Operational Capabilities: 20 Deg.C +/- 2 Deg.C, 40% to 70% RH - Return Air Set points & Operational Capabilities: 22 Deg.C to 38 Deg C, 20% to 60% RH - P / PI / PID - All three Control logics for temperature control - Relative / Compensated / Predictive method for humidity control - Temperature & Humidity graphs for the system (Avg. value of all the connected units) & for each single unit - Record of Peak & Low temperature/humidity of the current day - Display shows SET / ACTUAL / SET+ACTUAL Values - Records total run hours for all main components - Team Mode operation for synchronising all machines in room without any external controller - Sequencing & Stand-by rotation - Cascading, Lead-Lag functions - Min. 16 days record of controlled parameters - Unit memory shall hold min. 200 recent alarms with date and time for each alarm - Status report of last 400 event logs - 3 types of access; User, Service & Advanced to protect all settings - Auto restart after a power failure - Graphical display of status of operation of all major components like Compressor, Fan, Heater & Humidifier on screen in an idle mode
15.0 TR Total cooling capacity with minimum airflow of 16000 CMH, at minimum 20 Pa ESP, Return Air as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location ATS Complex First Floor- DPDS Server Room(1W+1S), Second Floor- ACC Room(2W+2S), Third Floor- APP SIM Room(2W+2S))
12.5 TR Total cooling capacity with minimum airflow of 11500 CMH, at minimum 20 Pa ESP, Return Air to be considerd as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location ATS Complex Third Floor- OCC Room(1W+1S))
9.5 TR Total cooling capacity with minimum airflow of 8000 CMH, at minimum 20 Pa ESP, Return Air to be considerd as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location ATC Complex Second Floor- HFRT Room(1W+1S), SKY Tower Third Floor- ITWP Server Room(1W+1S))
5.5 TR Total cooling capacity with minimum airflow of 5750 CMH, at minimum 20 Pa ESP, Return Air to be considerd as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location SKY Tower Fourth Floor- ASMGCS Server Room(1W+1S))
Supply, of following capacity Wall Mounted, Front discharge Air Cooled type Precision Air Condtioners -3.0 TR Nominal Cooling capacity @ minimum 2800 CMH. The Indoor unit shall comprise of variable Scroll Compressor, fan section complete with EC fan, Evaporator, Copper Cooling coil, Microprocessor controllers, Thermal Expansion valves, G4 Filter, Internal power and control wiring, HP/LP Cutouts, Power & Control Contactors and other electrical accessories. The Outdoor Condenser unit shall comprise of Condenser fan & motor, Condenser cooling coil (Copper coil with Aluminium fins), Isolator Switch. The protection level of the outdoor unit will be IP54. Items included the following :- Indoor unit with Metalic Body with Anti Corrosive Coating, Feature for PAC units controller for synchronising the multiple no. of units to work as single system for above units, Load sharing mode feature, Cascading Effect, Sequencing of above units.
Wall mounted high sensible cooling unit - 3TR Supply Air Set points & Operational Capabilities:- 20 Deg.C +/- 2 Deg.C, 40% to 70% RH (For Location - First Floor ATS - UPS Room 1 (2W+2S), UPS Room 2 (2W+2S), First Floor ATS Battery Bank Room 1 (1W+1S), Battery Bank 2 (1W+1S)
SH-B : Installation, Testing & Commissioning of PAC System
Installation, testing, and commissioning of following capacity Floor Mounted, Bottom discharge and top return type Air Cooled type Precision Air Condtioners including supply & fixing suitable adjutable GI/MS stands with rubber pad for each outdoor unit to dimension as specified / recommendation of OEM (for Indoor and Outdoor units) including wiring, connection & interconnection making suitable for operation complete as required.
15.0 TR Total cooling capacity with minimum airflow of 16000 CMH, at minimum 20 Pa ESP, Return Air as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location ATS Complex First Floor- DPDS Server Room(1W+1S), Second Floor- ACC Room(2W+2S), Third Floor- APP SIM Room(2W+2S))
12.5 TR Total cooling capacity with minimum airflow of 11500 CMH, at minimum 20 Pa ESP, Return Air to be considerd as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location ATS Complex Third Floor- OCC Room(1W+1S))
9.5 TR Total cooling capacity with minimum airflow of 8000 CMH, at minimum 20 Pa ESP, Return Air to be considerd as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location ATC Complex Second Floor- HFRT Room(1W+1S), SKY Tower Third Floor- ITWP Server Room(1W+1S))
5.5 TR Total cooling capacity with minimum airflow of 5750 CMH, at minimum 20 Pa ESP, Return Air to be considerd as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (For Location SKY Tower Fourth Floor- ASMGCS Server Room(1W+1S))
Supply, installation, testing of 18 SWG hard drawn copper refrigerant piping of sizes as per OEM standard with insulation for precision units with proper "U" traps in piping for required length. All refrigerant piping along within conditioned space shall be provided with 9mm Class '0' Nitril Rubber insulation while rest pipework shall be provided with Nitrile Rubber Insulation & Anticorrosive coating and supports, between indoor and outdoor units. Each running meter of one circuit includes one meter of copper pipe (inlet & outlet), necessary supports, fittings, insulation, Thermogaurd coating etc. and should connect the indoor to the outdoor as per locations. (Including extension kit if required)
Supply and fixing Perforated GI trays (With maximum 50% perforation) with necessary support and covertop for Refrigerant Pipes of of following Size in (mm)
Width 300 x Height 75 x thickness 1.2
Width 150 x Height 50 x thickness 1.2
Supply & Installation of following size GI Class "B" Drain Pipe with 9 mm thickness Nitrile rubber insulation with including all accessories complete as required.
50mm diameter
32mm diameter
25mm diameter
Supply & Installation of 25mm dia GI B class pipe for humidifier connection with including all accessories complete as required.
Charging of Refrigerant Gas R-410a with Oil
Supply & charging of Refrigerant Gas (R-410A) for the compressor for the 100 % rating and equivalent copper pipe length between Indoor & Outdoor Unit along with required oil for commisioning.
Supply & Installation of Motorized Damper with Actuator (of sufficient torque) & necessary control cablings for ON/OFF operation by interfacing with indoor unit operation and to be installed on indoor machines on Return Air path.
Supply and laying of 3 C x 2.5 Sqmm Cu. Flexible cable (Indoor to outdoor unit) on existing cable tray or surface as directed by EIC.
Supply and laying of Size 4C x 16Sqmm. armoured Copper cable from Incoming Isolator Panel to Indoor Unit on existing cable tray or surface as directed by EIC.
Sequencing & logic control necessary timers and logic control for automatic start-stop of the unit.with necessary timers and logic control for automatic start-stop of the unit.Logic should include orderly restart after power failure.
WALL MOUNTED UNITS
Installation , testing, and commissioning of following capacity Wall Mounted, Front discharge type Air Cooled type Precision Air Condtioners -3.0 TR Nominal Cooling capacity @ minimum 2800 CMH including supply & fixing suitable GI/MS stands for outdoor units and required plate for indoor unit including wiring, connection & interconnection making suitable for operation complete as required.
Wall mounted high sensible cooling unit - 3TR (For Location - First Floor ATS - UPS Room 1 (2W+2S), UPS Room 2 (2W+2S), First Floor ATS Battery Bank Room 1 (1W+1S), Battery Bank Room 2 (1W+1S)
Supply & fixing of suitable size (as per OEM recommendation) Copper piping for Interconnecting between indoor & outdoor unit with suitable with Nitrile Rubber insullation. HOT gas line with insulation
Supply & fixing of suitable size (as per OEM recommendation) Copper piping for Interconnecting between indoor & outdoor unit with suitable Nitrile Rubber insullation. Liquid gas line Insulation
Supply and laying of following size copper conductor cable for Interconnection between indoor & outdoor unit in existing cable tray or surface complete as required. 5C X 2.5Sq.mm
Supply and laying following size copper conductor control cable for Interconnecting between indoor & outdoor unit in existing cable tray or surface complete as required. 1.5 sqmm x 4C Copper cable
Supplying and fixing Condensate drain piping 25 mm UPVC with 9mm nitrile rubber Insulation
Supply and fixing Perforated GI trays with necessary support and covertop for Refrigerant Pipes of of following Size in (mm) Width 100x Height 50x thickness 1.2 in mm
Supply & charging of Refrigerant Gas (R407C) and oil required for the compressor for the 100 % rating and equivalent copper pipe length between Indoor & Outdoor Unit.
SH-C: Supply and Fixing of G.I. duct i/c insulation and New Diffusers/ Grills.
Supply, installation, balancing and commissioning of fabricated at site GSS sheet metal rectangular/round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required.
Thickness 0.63 mm sheet (24 Gauge)
Thickness 0.8 mm sheet (22 Gauge)
Supplying & fixing of powder coated extruded aluminium Air Grills with louvers but without volume control dampers complete as required.
Supplying and fixing of following thickness duly laminated aluminum foil of mat finish closed cell Nitrile rubber (Class “O”) insulation on existing duct after applying suitable adhesive for Nitrile rubber. The joints shall be sealed with 50 mm wide and 3 mm thick self adhesive nitrile rubber tape insulation complete as per specifications and as required.
Thickness- 19 mm
SH-D : Annual Comprehensive Maintenance Contract of PAC
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 18 Nos. and wall monted SRC i.e. 12 Nos. or Total Nos. of installed units under above work after completion of defect liability period of one year. The scope of work during CMC Period shall be as per technical specifications. For First Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 18 Nos. and wall monted SRC i.e. 12 Nos. or Total Nos. of installed units under above work after completion of defect liability period of one year. The scope of work during CMC Period shall be as per technical specifications. For Second Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 18 Nos. and wall monted SRC i.e. 12 Nos. or Total Nos. of installed units under above work after completion of defect liability period of one year. The scope of work during CMC Period shall be as per technical specifications. For Third Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 18 Nos. and wall monted SRC i.e. 12 Nos. or Total Nos. of installed units under above work after completion of defect liability period of one year. The scope of work during CMC Period shall be as per technical specifications. For Fourth Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 18 Nos. and wall monted SRC i.e. 12 Nos. or Total Nos. of installed units under above work after completion of defect liability period of one year. The scope of work during CMC Period shall be as per technical specifications. For FifthYear
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .