| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 L+₹12,000 (3.35%)Rejected-Finance | ₹3.7 L+₹12,000 (3.35%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VK CONSTRUCTION L2 | Kedar Traders L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation/ cutting in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 metre lead as per directed by Engineer- in -charge. | 125 | CUM | 110 ₹13,750 Lowest | 110 ₹13,750 Lowest |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 6 | CUM | 6,350.6 ₹38,103.6 | 6,150.6 ₹36,903.6 Lowest |
| 3.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 12 | CUM | 6,420.1 ₹77,041.2 Lowest | 6,420.1 ₹77,041.2 Lowest |
| 4.00 | Brick work M-105 in 1:4 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 24 | CUM | 5,350 ₹1,28,400 | 5,100 ₹1,22,400 Lowest |
| 5.00 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete. | 25 | RMT | 363 ₹9,075 Lowest | 363 ₹9,075 Lowest |
| 6.00 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete. | 25 | RMT | 463 ₹11,575 Lowest | 463 ₹11,575 Lowest |
| 7.00 | Centering and shuttering for C.C work i/c cost of all material, T&P etc complete. | 34 | SQM | 455 ₹15,470 Lowest | 455 ₹15,470 Lowest |
| 8.00 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge. | 215 | KG | 72 ₹15,480 Lowest | 72 ₹15,480 Lowest |
| 9.00 | Earthwork in Filling upto 1.50 M & lead beyond 600 M but within 1 Km distance & including Back filling, Watering, Ramming of excavated earth etc. also including all labour and T&P etc. complete. | 240 | CUM | 255 ₹61,200 | 235 ₹56,400 Lowest |
Tender Value
₹4.4 L
EMD Value
₹44,000
Closing Date
28 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
Office of EE MGCCD6, MEERUT
02/EE/2026-27(LOT-4)
2026_UPIDC_1151862_4
02/EE/2026-27
Open Tender
Civil Works
Item Rate
45 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹44,000
Yes
16 Jul 2026
23 May 2026
28 May 2026
23 May 2026
28 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation/ cutting in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 metre lead as per directed by Engineer- in -charge. | - | CUM | - | - |
| 2 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | - | CUM | - | - |
| 3 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | - | CUM | - | - |
| 4 | Brick work M-105 in 1:4 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | - | CUM | - | - |
| 5 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete. | - | RMT | - | - |
| 6 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete. | - | RMT | - | - |
| 7 | Centering and shuttering for C.C work i/c cost of all material, T&P etc complete. | - | SQM | - | - |
| 8 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge. | - | KG | - | - |
| 9 | Earthwork in Filling upto 1.50 M & lead beyond 600 M but within 1 Km distance & including Back filling, Watering, Ramming of excavated earth etc. also including all labour and T&P etc. complete. | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TDLot04.pdf
Tender Documents • 2.21 MB
BOQ_2158765.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .