| 1 | L1₹1.1 CrAdmitted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.8 L (4.27%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.2 Cr+₹4.8 L (4.27%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹4.9 L (4.32%)Admitted-Finance KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | ₹1.2 Cr+₹4.9 L (4.32%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹8.4 L (7.49%)Admitted-Finance 2 947 NELLAI NAGAR DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | 636701 | ₹1.2 Cr+₹8.4 L (7.49%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹9.9 L (8.80%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.2 Cr+₹9.9 L (8.80%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K DHINAKARAN L5 | M s Kumaresan and co L2 | C.GOVINDAN L3 | ASAITHAMBI.M L7 | C.PERIYASAMY L1 | MSS CONTRACTORS L6 | MANICKAVASAGAM L4 | M/s.Vetriconstructions L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer | 53 | Loc | 1,000 ₹53,000 Lowest | 1,000 ₹53,000 Lowest | 1,000 ₹53,000 Lowest | 1,500 ₹79,500 | 1,000 ₹53,000 Lowest | 1,000 ₹53,000 Lowest | 1,000 ₹53,000 Lowest | 1,000 ₹53,000 Lowest |
| 2.00 | Clearing light jungle including all cost of labour ,lead, lift etc., complete. | 53,000 | M2 | 0.1 ₹5,300 Lowest | 0.5 ₹26,500 | 1 ₹53,000 | 1 ₹53,000 | 2 ₹1,06,000 | 0.5 ₹26,500 | 1 ₹53,000 | 2 ₹1,06,000 |
| 3.00 | Supplying and filling of gravel for formation of approach road in main road to water logging area at tower locations, including cost of all lead, lift, etc., complete and as directed by the department Engineer at site. | 810 | M3 | 100 ₹81,000 | 10 ₹8,100 Lowest | 10 ₹8,100 Lowest | 100 ₹81,000 | 100 ₹81,000 | 50 ₹40,500 | 10 ₹8,100 Lowest | 200 ₹1,62,000 |
| 4.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders. | 1,855 | M3 | 300 ₹5,56,500 | 120 ₹2,22,600 | 150 ₹2,78,250 | 250 ₹4,63,750 | 100 ₹1,85,500 | 150 ₹2,78,250 | 50 ₹92,750 Lowest | 60 ₹1,11,300 |
| 5.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils Soft disintegrated rock not requirng blasting | 742 | M3 | 300 ₹2,22,600 | 200 ₹1,48,400 | 300 ₹2,22,600 | 350 ₹2,59,700 | 100 ₹74,200 | 150 ₹1,11,300 | 100 ₹74,200 | 60 ₹44,520 Lowest |
| 6.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils In Medium rock and dense medium rock not requiring blasting | 742 | M3 | 300 ₹2,22,600 | 400 ₹2,96,800 | 300 ₹2,22,600 | 400 ₹2,96,800 | 100 ₹74,200 Lowest | 200 ₹1,48,400 | 100 ₹74,200 Lowest | 120 ₹89,040 |
| 7.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils Hard rock requiring weding and chessling control blasting for foundation | 186 | M3 | 300 ₹55,800 | 600 ₹1,11,600 | 1 ₹186 Lowest | 1,000 ₹1,86,000 | 100 ₹18,600 | 250 ₹46,500 | 450 ₹83,700 | 600 ₹1,11,600 |
| 8.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils Hard rock requiring control blasting for foundation | 186 | M3 | 300 ₹55,800 | 700 ₹1,30,200 | 1 ₹186 Lowest | 800 ₹1,48,800 | 250 ₹46,500 | 250 ₹46,500 | 700 ₹1,30,200 | 400 ₹74,400 |
| 9.00 | Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. GCR type | 27 | Nos | 10,000 ₹2,70,000 | 12,000 ₹3,24,000 | 10,000 ₹2,70,000 | 10,000 ₹2,70,000 | 4,000 ₹1,08,000 | 8,000 ₹2,16,000 | 10,000 ₹2,70,000 | 3,000 ₹81,000 Lowest |
| 10.00 | Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. HCR type | 14 | Nos | 10,000 ₹1,40,000 | 15,000 ₹2,10,000 | 10,000 ₹1,40,000 | 20,000 ₹2,80,000 | 8,000 ₹1,12,000 Lowest | 10,000 ₹1,40,000 | 10,000 ₹1,40,000 | 10,000 ₹1,40,000 |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
19 Oct 2020, 2:30 pmClosed
CE/TP-I/CHN
A10,Thiru Vi Ka Indl Estate, Guindy, Chennai 32
Earth work excavation, stub setting ,concreting ,transporting and erection of tower ,stringing of 3 Nos Panther conductor and 1 No GI earth wire by making link line between Chennampatty 110 KV to existing Upgraded Kolathur 110/33 KV SS Reach II
2020_EB_181743_1
TP1-038/2020-21
Open Tender
Civil Works
Works
120 days
salem
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
Yes
7 Dec 2020
30 Sept 2020
20 Oct 2020
30 Sept 2020
19 Oct 2020
30 Sept 2020
Amount
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Clearing light jungle including all cost of labour ,lead, lift etc., complete.
Supplying and filling of gravel for formation of approach road in main road to water logging area at tower locations, including cost of all lead, lift, etc., complete and as directed by the department Engineer at site.
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils Soft disintegrated rock not requirng blasting
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils In Medium rock and dense medium rock not requiring blasting
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils Hard rock requiring weding and chessling control blasting for foundation
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils Hard rock requiring control blasting for foundation
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. GCR type
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. HCR type
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. KCR type
P.C.C 1:3:6 concrete using 20mm HBG metal for tower foundation with out form work but including cost of cement all materials labour, lead, lift etc., complete.as directed by the Engineer at site .
P.C.C 1:2:4, concrete using 12 to 20mm HBG metal for tower foundation and chimney with form work but including cost of cement all materials labour, lead, lift etc., complete.as directed by the Engineer at site.
Back filling of pits by the excavated earth including cost of all materials, labour charge, lead, lift, etc., complete.
Removal of surplus earth around the area including cost of allmaterials, labour charge, lead, lift, etc., complete.
Providing muffing and copping with P.C.C 1:2:4, concrete using 12 to 20mm HBG metal for with form work but including cost of cement all materials labour, lead, lift etc., complete.as directed by the Engineer at site.
Providing pipe type earthing including cost of 40 mm GI earth pipe B class of length 3 m,earth strip, cutting of earth work to the required length and connecting to the earth pipe and stub including cost of all materials, lead, lift etc., complete.
Providing special type earthing in Railway crossing tower with 2 Nos 50mm dia GI "C" class pipe as per standard specification, approved drawing and as directed by the Engineer incharge including lowering the earth wire from earth peak to the ground and connecting to the earth pipe, connecting the tower legs and earth pipes by 7/3.55 mm GI earth wire with suitable clamps and providing 2 Nos 150mm dia. bore for a depth of 3.6m for each tower location and placing of GI pipes 50mm dia C class 3m long into the bore, filling with Charcoal and salt in the annular space, providing 2 Nos RCC rings 60cm dia, 50mm tk for each earth pipe and anti climbing arrangements using GI barbed wire and evice including cost of all materials ,lead,lift etc., complete.
Providing shoring and shuttering with CW scantling and planks including cost of all materials,labour lead lift etc complete.As directed by the Engineer at site.
De watering charges during excavation and concreting with Diesel engine/ Electrical pump including all charges for fuel, engine oil etc complete. As directed by the Engineer at site. Already sanction Estimate of Molasi 110 Kv line.
Providing plastering C:M 1 : 3, using 12 mm thick including cost of all materials labour lead, lift, etc., complete in all respect
Fabrication, galvanising, supplying of tower parts as per the department approved drawing/ design transporting of tower parts to site including sorting out of tower members including transportation charges etc., complete. The raw material standard should be as per IS 2062 and for galvanising as per IS 2633 and 6745 (lates code). The governing standards for towers should be as per the specified IS codes directed by the Departmental Engineer at site.
Fabrication, galvanising, supplying of bolts and nuts of various sizes as per the department approved drawing/ design transporting of bolts and nuts to site including all taxes and duties, freight charges, etc., complete The raw material standard should be as per IS 2062 and for galvanising as per IS 2633 and 6745 (lates code). The governing standards for towers should be as per the specified IS codes directed by the Departmental Engineer at site.
Transporting & erection of tower parts including sorting out of tower parts at store and site, tightening, punching of bolts and nuts transport charges to each and every location, final checking, cost of T&Ps labour, lead, lift etc, complete., The defects pointed out during final checking for handing over and commissioning the line must be attended by the contractor without any extra cost to the board
Hoisting of 7units of suspension insulators including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Hoisting of 8units of tension insulators including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Providing well supported trussels up to 5m height for road crossing including cost of all materials labour lead and lift etc complete.As directed by the Engineer at site.
Providing Temporary guy's in tension 3 Nos stay including burrying, etc., complete and as directed by the Dept. Engineer.
Cleaning the tower legs and Painting tower leg using best quality anti corrosive paint-black color-1m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. complete.
Arranging and availing railway shutdown on HT/LT, dismantling and restringing of HT/LT lines to the original position after stringing operation including all labour charges , T&Ps, etc., complete.
Providing tack welding of all the bolts & nuts ( at least 3 places in erected towers from GL to X-arm bottom level including painting of welded portion with two coats of best quality of cold galvanised paing having at least 90% zinc content and approved by the engineer at site including cost of paint of all other materials lead and lift etc complete.
Transporting, paying out and rough sagging of of 3 nos Panther conductor with fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete in railways LC condition as special case
Transporting, paying out and rough sagging of 1 no. GI earth wire (7/3.55mm) with fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete.
Supply and fixing in position of the Number plate as directed by the Engineer in charge of the work.
Supply and fixing in position of the Danger boards as directed by the Engineer in charge of the work.
Supply and fixing in position of the phase plate as directed by the Engineer in charge of the work.
Cutting and felling of small size Various type of trees
Cutting and felling of big size Various type of trees
Fabrication, supply and fixing in position of the Name Board made of steel sheet 18 Gauge (1.25mm)thick and Letter painting over the board as directed by the Engineer in charge of the work.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M s Kumaresan and co
C.GOVINDAN
MANICKAVASAGAM
K DHINAKARAN
MSS CONTRACTORS
ASAITHAMBI.M
M/s.Vetriconstructions
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_217917.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .