Construction of Sewage Treatment Plant of 6.00 MLD based on SBR ( Sequential Batch Reactor) Technology
2026_HRY_546556_1
2026CF06BEAC A56D 4458 A46F 0AFD25534FCC2264003
Open Tender
Civil Works
Works
540 days
Panchkula
2 documents required · 2 mandatory
₹15,000
₹38 L
Yes
21/09/2026
6 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Construction, erection, testing and commissioning of MPS and following components including 6 years Defect Liability cum Maintenance period and 3 months trial run period – as per detail attached:
i) RCC Receiving chamber, Coarse Screen chamber, Rectangular Collecting tank in two compartments, Panel Room of 35 sqm suitable for 6.00 MLD average flow with peak factor of 2.50 landscaping of the campus (ii)Providing and installing of 5 No. Submersible sewage Pumping sets of i.e 1 No. of 6250 LPM ( 375 m3/hr) 2 No. of 4200 LPM (250 m3/hr) and 2 No. of 2100 LPM ( 125 m3/hr) with 20.00 mtr Head each suitable LT Panel equipped with all safety devices automatic capacitor bank and submersible cable from LT Panel to pump sets complete in all respects. (iii)1 No. Chain electric hoist with electric trolley of 3 tone, 10 m lift. (iv)DI K-9 pipe of suitable dia of MPS including welding and screwing of flanges, ISI marked DI fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respects.
(v) 3 No. CI gear operated sluice gates with SS spindle (SS 410) and seats (SS 304) ( 2 No. screens and 1 No. for partition of collecting tank) as per design. (vi)supply and installation of 2 Nos. mechanical coarse screen of minimum length 6 mtr for 6.00 MLD average flow with peak factor of 2.50.: (vii) The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewer to newly constructed structures is included in this scope of work. (viii) All the pumping machinery, Panel board, level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internal facility. | 1 | Complete Job | 1.25 | ₹1.25 |
| 2 | i) Design, Construction, Erection Testing and Commissioning of 6.00 MLD Capacity Sewage Treatment Plant based on Sequential Batch Reactor of rectangular shape (SBR) Technology complete in all respects. (ii) Landscaping, Annexe Building and Utility Building, Sludge Room, Centrifuge Building, HT/ LT Panel Room, PLC Room, Centrifuge Houses, Laboratory, Office, MCC, Pantry, Chlorination Building, Blower Room and Toilet Blocks ( Approximate area 450.00 Sqm) etc and all other contingent. (iii) Electrical, Mechanical, Electromagnetic Flow measurement device on inlet and outlet, Real Time Water supply monitoring with data collection system (Online Analyzer). (iv) Laboratory equipments as per requirement. (v) 2 No. High Mast of 9 mtr GI Octagonal Pole of 4 mm thickness Providing and Fixing solar light, 75 watt with dark and motion sensor, (vi) Providing and installing 6 No. CCTV Cameras ( 4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of Engineer in charge. (vii)Providing and installing 2 No. centrifuges (1W plus 1S) both mechanical including centrifuge feed pump, all fittings, instrumentations, Electric Panel board, etc. as per design complete in all respect including Packing dry sludge in 20 kg bag and supply the same in market Kisan Seva Kendra or as desired by the Engineer in charge within lead as posited as clause 4.4.5. (viii) Construction of Boundary wall constructed over RCC Columns (ix) Construction of cement concrete pathway 250 m x 3 m wide. (x) Construction of 2 No. Staff Quarter of 61 Sqm area each. (xi) Site clearance as desired by the Engineer in charge. Including 6 years Defect Liability cum Maintenance period and 3 months trial run period | 1 | Complete Job | 1.25 | ₹1.25 |
| 3 | Supplying and Installation of Odour Control System : Biotrickling Filter plus Activated Carbon Polishing stage complete in all respects as per satisfaction of the Engineer in charge including Covering of MPS, Sludge Tanks, Ducting thereof to the Odour plant and all other works contingent thereto. Including 6 years Defect Liability cum Maintenance period and 3 months trial run period | 1 | Complete Job | 1.25 | ₹1.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_626198.xls
BOQ • 0.35 MB
C1DateSTP.pdf
PDF • 0.22 MB
TechnicalCorrigendumSTP.pdf
PDF • 11.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .