| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC | ₹3.5 L | 1 | Accepted-AOC accept |
| 2 | 2₹3.5 LRejected-AOC NO 1 2370 MOTHER TERESA STR SIVANTHI ADHITHTAN NAGAR REDHILLS CHENNAI 600052 | THIRUVALLUR | TAMIL NADU | 600052 | ₹3.5 L | 2 | Rejected-AOC reject |
| 3 | 3₹3.6 LRejected-AOC | ₹3.6 L | 3 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | hariharan L1 | MARSTRONZ INFRA L3 | AMPS ELECTRIC L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle including all cost of labour lead lift etc complete | 1,185 | m² | 6 ₹7,110 | 7 ₹8,295 | 6 ₹7,110 |
| 2.00 | Dismantling of existing damaged barbed wire fencing and the same devolution of central store including cost of all labour charges and transporting etc., complete. | 235 | kgs | 95 ₹22,325 | 98 ₹23,030 | 95 ₹22,325 |
| 3.00 | Supplying and laying of chain link fencing of 2" x 2" of 10 Gauge galvanised iron including cost of all materials,labour, lead, lift etc complete as directed by the engineer at site. | 413 | m² | 330 ₹1.4 L | 340 ₹1.4 L | 330 ₹1.4 L |
| 4.00 | Dismantling and clearing away existing brick/ stone masonry in cement mortor under 3m | 5 | m3 | 421 ₹2,105 | 433 ₹2,165 | 475 ₹2,375 |
| 5.00 | Earth work excavation in all type of soils including sectioning and levelling with an initial lead of 10m and lift of 2m - In Hard Gravely Soil | 15 | m3 | 118 ₹1,770 | 123 ₹1,845 | 120 ₹1,800 |
| 6.00 | PCC 1:3:6, using 40mm HBG machine crushed metal for foundation padding concrete including cost of cement and all materials, curing, lead, lift etc.,complete. | 1 | m3 | 6,030 ₹6,030 | 6,160 ₹6,160 | 6,000 ₹6,000 |
| 7.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for GI angle post fixing with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. | 4 | m3 | 8,066 ₹32,264 | 8,230 ₹32,920 | 8,000 ₹32,000 |
| 8.00 | Supplying, fabrication, galvanising and fixing of GI angles for fence post including cost of all materials lead and lift etc., complete | 800 | kgs | 108 ₹86,400 | 115 ₹92,000 | 110 ₹88,000 |
| 9.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹26,486.46 | 9 ₹27,615.15 | 9 ₹26,631 |
| 10.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹26,486.46 | 9 ₹27,615.15 | 9 ₹26,631 |
Updated dates
Tender Value
₹3.0 L
EMD Value
₹3,500
Closing Date
13 Nov 2025, 2:00 pmClosed
SE/CEDC/SOUTH/CBE
O/O. SE/CEDC/S/CBE
Replacement of existing damaged barbed wire and providing chain link fencing arrangements in the North and South side of the Kaduvettipalayam 110 11 KV SS and Providing chainlink fencing arrangements at Eastern side of Neelambur 110 11 KV SS
2025_EB_612014_1
SE/CEDC/SOUTH/CBE/No.06/25-26
Open Tender
Civil Works - Buildings
90 days
KADUVETTIPALAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
18 Dec 2025
7 Oct 2025
14 Nov 2025
7 Oct 2025
13 Nov 2025
7 Oct 2025
Amount
Clearing scrub jungle including all cost of labour lead lift etc complete
Dismantling of existing damaged barbed wire fencing and the same devolution of central store including cost of all labour charges and transporting etc., complete.
Supplying and laying of chain link fencing of 2" x 2" of 10 Gauge galvanised iron including cost of all materials,labour, lead, lift etc complete as directed by the engineer at site.
Dismantling and clearing away existing brick/ stone masonry in cement mortor under 3m
Earth work excavation in all type of soils including sectioning and levelling with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
PCC 1:3:6, using 40mm HBG machine crushed metal for foundation padding concrete including cost of cement and all materials, curing, lead, lift etc.,complete.
PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for GI angle post fixing with formwork including cost of cement all materials,labour,lead lift, curing etc., complete.
Supplying, fabrication, galvanising and fixing of GI angles for fence post including cost of all materials lead and lift etc., complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
AMPS ELECTRIC (BID ID -1505329)
MARSTRONZ INFRA (BID ID -1507937)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_731307.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid