| 1.00Part A (Civil Portion) | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 899.71 | cum | 127 ₹1.1 L | 145 ₹1.3 L | 131.65 ₹1.2 L |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 646.26 | cum | 531 ₹3.4 L | 610 ₹3.9 L | 552.18 ₹3.6 L |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8(1Cement:4coarse sand(zone-Ill)derived from natural sources :8graded stone aggregate 40 mm nominal size derived from natural sources) | 149.96 | cum | 2,815 ₹4.2 L | 3,234 ₹4.8 L | 2,928.44 ₹4.4 L |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-Ill) : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 722.61 | cum | 4,088 ₹29.5 L | 4,696 ₹33.9 L | 4,252.39 ₹30.7 L |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu-ral sources : 3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 102.67 | cum | 4,719 ₹4.8 L | 5,421 ₹5.6 L | 4,908.38 ₹5.0 L |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 57,809.12 | kg | 59 ₹34.1 L | 68 ₹39.3 L | 61.51 ₹35.6 L |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 8,213.76 | kg | 59 ₹4.8 L | 68 ₹5.6 L | 61.51 ₹5.1 L |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 711.17 | Sqm | 165 ₹1.2 L | 190 ₹1.4 L | 171.75 ₹1.2 L |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,817.68 | Sqm | 343 ₹6.2 L | 394 ₹7.2 L | 356.49 ₹6.5 L |
Tender Value
₹3.0 Cr
EMD Value
₹3.8 L
Closing Date
18 Feb 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), LINGARAJ AREA
SO (CIVIL), OFFICE OF THE GM, LINGARAJ AREA TALCHER, ANGUL_759102, ODISHA, INDIA
Construction of ramp with approach for weigh bridges at different location at Lingaraj OCP, Lingaraj Area.
2026_MCL_352226_1
MCL/GM(LA)/e-Tender/ SO(C)/25-26/95 dt.02.02.2026
Open Tender
Civil Works - Roads
160 days
Lingaraj OCP
Please refer Tender documents.
5 documents required · 5 mandatory
₹3.8 L
25 Mar 2026
3 Feb 2026
20 Feb 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
3 Feb 2026 - 11 Feb 2026
Part A (Civil Portion)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8(1Cement:4coarse sand(zone-Ill)derived from natural sources :8graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-Ill) : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu-ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
PART-B (APPROCH ROAD)
Embankment Construction with Material Obtained from Borrow Pits (Constructionof embankment with approved material having CBR>7 obtained from borrow pits with all liftsand leads, transporting tosite, spreading, grading to required slopeand compacting tomeet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying inpositioncement concreteof specified grade excluding the cost of centeringand shuttering - All work up to plinth level :1:3:6(1Cement :3coarsesand(zone-III)derived from natural sources : 6 graded stoneaggregate 20mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Filler joint Providing & fixing 20 mm thick compressible fibre board in expansion jointcompleteas per drawing & Technical Specification.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.37 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_365019.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid