Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance VILLAGE SATOJ TEHSIL SUNAM DISTT SANGRUR | SANGRUR | PUNJAB | 148001 | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 CrAdmitted-Finance SHIV BARI ROAD NEAR KASUMAL HOTEL BIKANER 334003 RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | 334003 | ₹2.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical JAISALMER RAJASTHAN 345001 INDIA UDYAM RJ 18 0001538 | JAISALMER | RAJASTHAN | 345001 | - | - | Rejected-Technical Not enlisted in appropriate class |
| Sl No | Description | Qty | Unit | M/s Rohit Construction Co. L2 | M/S SIDHU CONSTRUCTION COMPANY L1 | M/S BIKANER CHEMICAL LABORATORIES L3 |
|---|---|---|---|---|---|---|
| 1.00NOTE:- Schedule ‘A’ (Part- I) under Ser No.1.01 to 1.07. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.The estimated rate is left blank since the same is not prepriced by MES | ||||||
| 1.01 | Construction of Toilet Block Building having WC (06 Nos), WHB (06 Nos), Bath Room (04 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings.(BLOCK NO 01) | 1 | EACH BLOCK | 33,75,000 ₹33.8 L | 27,10,000 ₹27.1 L | 29,50,000 ₹29.5 L |
| 1.02 | Construction of Toilet Block Building having WC (04 Nos), WHB (05 Nos), Bath Room (03 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonery, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 02) | 1 | EACH BLOCK | 13,60,000 ₹13.6 L | 11,80,000 ₹11.8 L | 14,00,000 ₹14 L |
| 1.03 | Construction of Toilet Block Building having WC (04 Nos), WHB (02 Nos), Bath Room (03 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 03) | 1 | EACH BLOCK | 17,00,000 ₹17 L | 13,07,000 ₹13.1 L | 18,00,000 ₹18 L |
| 1.04 | Construction of Toilet Block Building having WC (09 Nos), WHB (05 Nos), Bath Room (06 Nos), Urinal (03 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 04) | 1 | EACH BLOCK | 26,70,000 ₹26.7 L | 25,00,000 ₹25 L | 28,00,000 ₹28 L |
| 1.05 | Construction of Toilet Block Building having WC (09 Nos), WHB (05 Nos), Bath Room (06 Nos), Urinal (03 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 05) | 1 | EACH BLOCK | 26,80,000 ₹26.8 L | 25,00,000 ₹25 L | 28,00,000 ₹28 L |
| 1.06 | Construction of Toilet Block Building having WC (04 Nos), WHB (04 Nos), Bath Room (04 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings (BLOCK NO 06) | 1 | EACH BLOCK | 14,00,000 ₹14 L | 11,50,000 ₹11.5 L | 13,00,000 ₹13 L |
| 1.07 | Construction of Toilet Block Building having WC (02 Nos), WHB (02 Nos), Urinal (01 No), Bath (01 No) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 07) | 1 | EACH BLOCK | 5,50,000 ₹5.5 L | 5,00,000 ₹5 L | 5,00,000 ₹5 L |
| 1.08NOTE:- Schedule ‘A’ Part- II to X. Ser No. 2.00 to 10.00 are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | ||||||
| 2.00 | Lump sum price worked out by the Contractor for Internal electrification as listed in Sch 'A' Part- II | 1 | Lumpsum | 7,81,133.62 ₹7.8 L | 7,95,599.06 ₹8.0 L | 8,10,064.49 ₹8.1 L |
Updated dates
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
14 May 2026, 6:00 pmClosed
CWE (AF) Jaisalmer
HQ CWE (AF) Jaislmer
PROVISION OF ADDITIONAL TOILET BLOCKS FOR LIVING IN BILLETS AT AF STN JAISALMER
2025_MES_739032_4
80363
Open Tender
Civil Works
270 days
GE (AF) Jaisalmer
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE (AF) Jaisalmer
₹2.1 L
3 Jun 2026
16 Apr 2026
15 May 2026
16 Apr 2026
14 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Construction of Toilet Block Building having WC (06 Nos), WHB (06 Nos), Bath Room (04 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings.(BLOCK NO 01) | - | EACH BLOCK | - | - | |
Construction of Toilet Block Building having WC (04 Nos), WHB (05 Nos), Bath Room (03 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonery, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 02) | - | EACH BLOCK | - | - | |
欀ሀᄀࠀ潃獮牴捵楴湯漠潔汩瑥䈠潬正䈠極摬湩慨楶杮圠⁃〨‴潎⥳䡗⁂〨′潎⥳慂桴 | - | EACH BLOCK | - | - | |
Construction of Toilet Block Building having WC (09 Nos), WHB (05 Nos), Bath Room (06 Nos), Urinal (03 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 04) | - | EACH BLOCK | - | - | |
Construction of Toilet Block Building having WC (09 Nos), WHB (05 Nos), Bath Room (06 Nos), Urinal (03 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (BLOCK NO 05) | - | EACH BLOCK | - | - | |
Construction of Toilet Block Building having WC (04 Nos), WHB (04 Nos), Bath Room (04 Nos), Urinal (02 Nos) with RCC framed structure, PCC Block Masonary, RCC roof slab etc. complete all as specified and as shown on drawings (BLOCK NO 06) | - | EACH BLOCK | - | - | |
丠獯Ⱙ唠楲慮〨′潎⥳眠瑩䍒⁃牦浡摥猠牴捵畴敲䍐⁃求捯慍潳慮祲䍒⁃潲景猠慬瑥挠浯汰瑥污獡猠数楣楦摥愠摮愠桳睯湯搠慲楷杮⠠䱂䍏⁋低〠⤳-kâêԈ䌀湯瑳畲瑣潩景吠楯敬⁴求捯畂汩楤杮栠癡湩䍗⠠㈰丠獯Ⱙ圠䉈⠠㈰丠獯Ⱙ†牕湩污⠠丠⥯慂桴⠠丠⥯眠瑩䍒⁃牦浡摥猠牴捵畴敲䍐⁃求捯慍潳慮祲䍒⁃潲景猠慬瑥挠浯汰瑥污獡猠数楣楦摥愠摮愠桳睯湯搠慲楷杮†䈨佌䭃丠⁏㜰)ሀⴀᄀ攀ሀ�ᄀᘀ | - | EACH BLOCK | - | - | |
Lump sum price worked out by the Contractor for Internal electrification as listed in Sch 'A' Part- II | - | Lumpsum | - | - | |
Lump sum price worked out by the Contractor for Internal Water Supply as listed inSch `A’ Part- III | - | Lumpsum | - | - | |
Lump sum price worked out by the Contractor for Road/Path/ Harstanding as listed in Sch 'A' Part -IV | - | Lumpsum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tender.pdf
Tender Documents • 1.80 MB
BOQ_851932.xls
BOQ • 0.55 MB
Drgall.pdf
Additional Documents • 23.68 MB
Download all tender documents and submit your bid