| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC 2 3 AMIT VIJAY APT CHSL KASTURBA CROSS ROAD NEAR BHANU PARK KANDIVALI WEST MUMBAI 400 067 | MUMBAI | MUMBAI | MAHARASHTRA | 400067 | ₹21.4 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹26.6 LRejected-Finance | ₹26.6 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹26.6 LRejected-Finance MUMBAI MAHARASHTRA 400072 INDIA UDYAM MH 18 0002379 27AAECC7778G1Z9 R M MSME STATUS AS VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹26.6 L | L3 | Rejected-Finance Being L3 |
| 4 | L4₹31.5 LRejected-Finance | ₹31.5 L | L4 | Rejected-Finance Being L4 |
| 5 | L5₹31.7 LRejected-Finance 3 NEW TRIMURTY CO OP HOUSING SOCIETY INGOLE NAGAR WARDHA ROAD NAGPUR 440005 MAHARASTRA | NAGPUR | NAGPUR | MAHARASHTRA | 440005 | ₹31.7 L | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | Epicons Consultants Pvt Ltd L8 | BECQUEREL INDUSTRIES PVT. LTD. L5 | Femstruct Consulting Engineers LLP L2 | Bureau Veritas (India) Pvt. Ltd L6 | Capstone Consultants Private Limited L3 | B.J.MEHTA ARCHITECTURAL & STRUCTURAL CONSULTANTS PVT. LTD. L1 | Cortex Construction Solutions Pvt Ltd L4 | DG Design and Construction L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Conducting ultra sonic pulse velocities tests, at all locations prepared after chipping the plaster, on columns, beams and portal frames to assess the integrity of concrete as per BIS/ASTM specifications etc. complete. | 1,000 | Each | 100 ₹1 L | 450 ₹4.5 L | 400 ₹4 L | 420 ₹4.2 L | 250 ₹2.5 L | 250 ₹2.5 L | 300 ₹3 L | 150 ₹1.5 L |
| 2.00 | Conducting rebound hammer test as per BIS/ASTM standards etc. complete. | 1,000 | Each | 75 ₹75,000 | 325 ₹3.3 L | 300 ₹3 L | 350 ₹3.5 L | 200 ₹2 L | 200 ₹2 L | 120 ₹1.2 L | 150 ₹1.5 L |
| 3.00 | Conducting half-cell potential meter test at all locations to assess the risk of corrosion including exposing the reinforcement for carrying out the test. The test shall be conducted as per BIS/ASTM specifications. The quoted rate shall include charges for filling back areas chipped for exposing the reinforcement with polymer modified mortar. 5 potential observations taken at one location will form a unit for measurement purposes. | 500 | Each | 400 ₹2 L | 450 ₹2.3 L | 500 ₹2.5 L | 350 ₹1.8 L | 200 ₹1 L | 300 ₹1.5 L | 300 ₹1.5 L | 100 ₹50,000 |
| 4.00 | Extraction and testing of concrete drill dust samples from the structure. Three drill dust samples from depths 0-15mm, 15-30mm and 30-45mm shall be collected from each location. The samples shall be tested for chlorides, sulphates, PH and alkalinity. | 300 | Each | 5,400 ₹16.2 L | 225 ₹67,500 | 800 ₹2.4 L | 1,750 ₹5.3 L | 900 ₹2.7 L | 500 ₹1.5 L | 600 ₹1.8 L | 100 ₹30,000 |
| 5.00 | Conducting test: Preparing the surface of RCC structural member such as beams, columns, slabs, water tank walls & slab etc by chipping the plastered surface/finishing/cladding to expose the concrete, cutting etc as per S-516(Part 5/Sec 3):2021 and conducting carbonation test at various depth as directed by EIC. | 300 | Each | 250 ₹75,000 | 1,500 ₹4.5 L | 300 ₹90,000 | 500 ₹1.5 L | 200 ₹60,000 | 300 ₹90,000 | 500 ₹1.5 L | 150 ₹45,000 |
| 6.00 | Extraction of concrete (75mm dia) cores from locations specified and testing for crushing strength, water absorption & unit weight. The quoted rate shall include charges for filling back the core holes with polymer modified mortar and finishing etc. complete | 200 | Each | 3,000 ₹6 L | 2,500 ₹5 L | 3,000 ₹6 L | 5,000 ₹10 L | 2,400 ₹4.8 L | 3,500 ₹7 L | 3,000 ₹6 L | 1,800 ₹3.6 L |
| 7.00 | Conducting profometer scan at specified location of the structure for reinforcement steel location, size and cover measurement, etc. complete. | 500 | Each | 400 ₹2 L | 550 ₹2.8 L | 500 ₹2.5 L | 250 ₹1.3 L | 250 ₹1.3 L | 650 ₹3.3 L | 400 ₹2 L | 100 ₹50,000 |
| 8.00 | Preparation and submission of two copies of draft report as specified followed by five copies of final report along with a soft copy of the same on diskette covering Non Destructive test observations, analysis, interpretation and conclusions of NDT observations, drawing out measures for durability make up, estimation of repair quantities, rate, rate analysis for major repair items.
Note: 1. The rates quoted for item No. 1 to 7 shall include preparation of test area, making good the areas with polymer modified mortar, disposing off debris and necessary scaffolding arrangements for testing. | 1 | Job | 4,80,000 ₹4.8 L | 1,50,000 ₹1.5 L | 1,95,000 ₹1.9 L | 50,000 ₹50,000 | 50,000 ₹50,000 | 1,10,000 ₹1.1 L | 2,00,000 ₹2 L | 15,00,000 ₹15 L |
| 9.00 | Conducting distress mapping Analysis for each floor in buildings where NDT are to be carried out. Distress symptoms will be marked on floor plan as per notation used or as directed by Project Engineer and preparing data sheets mentioning exact location of each crack, height, and width of crack and Preparation and submission of two copies of draft report as specified followed by five copies of final report along with a soft copy of the same on diskette covering distress mapping Analysis observations and conclusions along with photos etc., Complete as directed by Engineer-in-Charge. Note: Condition Survey of the area under consideration shall be carried out, which includes a) Visual Inspection: Grouping of structural members should be done during visual inspection based on environmental exposure conditions e.g. external and internal members. Also, identification of Corrosion prone locations as per Visual Inspection. Follow the notations and typical worksheet for recording distress during visual inspection and damage classes based on visual inspection as per CPWD handbook on repair. The condition survey report shall comprise the output of visual inspection and NDT results. Major sections to be covered in the report shall be: (i) Identification of the cause of the distress. (ii) Systematic documentation of all observations during visual inspection, including distress maps. (iii) Systematic documentation of all test results obtained from NDTs. (iv) Determination of concrete properties based on NDTs (v) Requirement of propping of structural members to relieve part/full load acting on the member. (vi) Requirement of immediate evacuation and safety measures to prevent any immediate major mishap. (vii) Recommendations on repair/retrofit strategy with due consideration to available space and accessibility for ongoing activities. (viii) Requirements on safety measures to be adopted during execution of repair/retrofit jobs. (ix) Limitations/assumptions used. (x) Any other recommendation. | 1 | Job | 2,40,000 ₹2.4 L | 1,00,000 ₹1 L | 1,30,000 ₹1.3 L | 2,70,000 ₹2.7 L | 4,30,000 ₹4.3 L | 1,15,200 ₹1.2 L | 5,50,000 ₹5.5 L | 5,00,000 ₹5 L |
| 10.00 | Providing and fixing double tubular scaffolding system using H- frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding
IMPORTANT NOTE : Police verification Certificate issued by Special Branch of Police is required for Contractor, Engineers, Supervisors and all the labour to work inside BARC and the same shall be arranged by the Contractor. | 5,000 | SqM | 150 ₹7.5 L | 125 ₹6.3 L | 40 ₹2 L | 27 ₹1.4 L | 140 ₹7 L | 10 ₹50,000 | 140 ₹7 L | 100 ₹5 L |
Tender Value
₹53.7 L
EMD Value
₹1.3 L
Closing Date
12 Dec 2025, 3:00 pmClosed
Chief Engineer, CED
CED, BARC, Trombay, Mumbai
Health Assessment of Hill side buildings under the jurisdiction of Project Engineer(V) and other buildings at North site, BARC, Trombay, Mumbai.
2025_BARC_885617_1
BARC/CED/ET/53/2025-2026 Dated 11/11/2025
Open Tender
Civil Works
365 days
BARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.3 L
CED, BARC, Trombay, Mumbai
21 May 2026
17 Nov 2025
17 Dec 2025
17 Nov 2025
12 Dec 2025
2 Dec 2025
17 Nov 2025 - 21 Nov 2025
25 Nov 2025
Conducting ultra sonic pulse velocities tests, at all locations prepared after chipping the plaster, on columns, beams and portal frames to assess the integrity of concrete as per BIS/ASTM specifications etc. complete.
Conducting rebound hammer test as per BIS/ASTM standards etc. complete.
Extraction and testing of concrete drill dust samples from the structure. Three drill dust samples from depths 0-15mm, 15-30mm and 30-45mm shall be collected from each location. The samples shall be tested for chlorides, sulphates, PH and alkalinity.
Conducting test: Preparing the surface of RCC structural member such as beams, columns, slabs, water tank walls & slab etc by chipping the plastered surface/finishing/cladding to expose the concrete, cutting etc as per S-516(Part 5/Sec 3):2021 and conducting carbonation test at various depth as directed by EIC.
Conducting profometer scan at specified location of the structure for reinforcement steel location, size and cover measurement, etc. complete.
Preparation and submission of two copies of draft report as specified followed by five copies of final report along with a soft copy of the same on diskette covering Non Destructive test observations, analysis, interpretation and conclusions of NDT observations, drawing out measures for durability make up, estimation of repair quantities, rate, rate analysis for major repair items. Note: 1. The rates quoted for item No. 1 to 10 shall include preparation of test area, making good the areas with polymer modified mortar, disposing off debris and necessary scaffolding arrangements for testing.
Conducting distress mapping Analysis for each floor in buildings where NDT are to be carried out. Distress symptoms will be marked on floor plan as per notation used or as directed by Project Engineer and preparing data sheets mentioning exact location of each crack, height, and width of crack and Preparation and submission of two copies of draft report as specified followed by five copies of final report along with a soft copy of the same on diskette covering distress mapping Analysis observations and conclusions along with photos etc., Complete as directed by Engineer-in-Charge. Note: Condition Survey of the area under consideration shall be carried out, which includes a) Visual Inspection: Grouping of structural members should be done during visual inspection based on environmental exposure conditions e.g. external and internal members. Also, identification of Corrosion prone locations as per Visual Inspection. Follow the notations and typical worksheet for recording distress during visual inspection and damage classes based on visual inspection as per CPWD handbook on repair. The condition survey report shall comprise the output of visual inspection and NDT results. Major sections to be covered in the report shall be: (i) Identification of the cause of the distress. (ii) Systematic documentation of all observations during visual inspection, including distress maps. (iii) Systematic documentation of all test results obtained from NDTs. (iv) Determination of concrete properties based on NDTs (v) Requirement of propping of structural members to relieve part/full load acting on the member. (vi) Requirement of immediate evacuation and safety measures to prevent any immediate major mishap. (vii) Recommendations on repair/retrofit strategy with due consideration to available space and accessibility for ongoing activities. (viii) Requirements on safety measures to be adopted during execution of repair/retrofit jobs. (ix) Limitations/assumptions used. (x) Any other recommendation.
Providing and fixing double tubular scaffolding system using H- frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding IMPORTANT NOTE : Police verification Certificate issued by Special Branch of Police is required for Contractor, Engineers, Supervisors and all the labour to work inside BARC and the same shall be arranged by the Contractor.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.99 MB
Tendernotice_2.pdf
PDF • 1.58 MB
TechnicalbidET53.xls
Tender Documents • 0.08 MB
ProformaOfSchedulesET53.pdf
Tender Documents • 1.13 MB
ScheduleAET53.pdf
Tender Documents • 0.34 MB
BOQ_931121.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid