Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC | ₹22.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.8 LRejected-AOC | ₹22.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K V CONSTRUCTIONS L2 | Arunai Infra L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Footings - First Depth Upto 2.00M | 179.9 | cum | 208.6 ₹37,527.14 | 205.1 ₹36,897.49 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Plinth Beam | 9.88 | cum | 105.48 ₹1,042.14 | 101.98 ₹1,007.56 Lowest |
| 3.00 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. | 14.65 | cum | 5,107.7 ₹74,827.81 | 5,104.2 ₹74,776.53 Lowest |
| 4.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | 94.33 | sqm | 467.5 ₹44,099.28 | 464 ₹43,769.12 Lowest |
| 5.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc. | 158.33 | sqm | 632 ₹1,00,064.56 | 628.5 ₹99,510.41 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 58.09 | M3 | 8,111.1 ₹4,71,173.8 | 8,107.6 ₹4,70,970.48 Lowest |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 4,938 | MT | 92.88 ₹4,58,641.44 | 89.38 ₹4,41,358.44 Lowest |
| 8.00 | Brick work in CM 1:5 (one cement & Five sand) using II class ground moulded bricks of size 9"X43/8"X 23/4" standard specification including finishing, curing, etc., complete complying with standard specification (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost)- Upto Basement | 61.93 | cum | 7,133.86 ₹4,41,799.95 | 7,130.36 ₹4,41,583.19 Lowest |
| 9.00 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 513.5 | KG | 108.35 ₹55,637.73 | 104.85 ₹53,840.48 Lowest |
| 10.00 | Plastering with cement mortar 1:5 (One cement and five sand) 12mm thick in all floors including cost and conveyance of all materials to site etc,complete as per standard specifications | 583.2 | sqm | 271.15 ₹1,58,134.68 | 267.65 ₹1,56,093.48 Lowest |
Tender Value
₹22.8 L
EMD Value
₹22,800
Closing Date
10 Feb 2026, 3:00 pmClosed
Commissioner
Tiruvannamalai City Municipal Corporation
Construction of Compound wall at Arunthariyar burial ground near Avalurpet Railway gate in Thiruvannamalai Municipal Corporation
2026_MAWS_650349_1
0481/2026/E1
Open Tender
Civil Works
Works
120 days
Tiruvannamalai City Municipal Corporation
Refer Tender Notice
2 documents required · 2 mandatory
₹0
₹22,800
26 Aug 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Footings - First Depth Upto 2.00M | 179.9 | cum | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Plinth Beam | 9.88 | cum | - | - |
| 3 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. | 14.65 | cum | - | - |
| 4 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | 94.33 | sqm | - | - |
| 5 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc. | 158.33 | sqm | - | - |
| 6 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 58.09 | M3 | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 4,938 | MT | - | - |
| 8 | Brick work in CM 1:5 (one cement & Five sand) using II class ground moulded bricks of size 9"X43/8"X 23/4" standard specification including finishing, curing, etc., complete complying with standard specification (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost)- Upto Basement | 61.93 | cum | - | - |
| 9 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 513.5 | KG | - | - |
| 10 | Plastering with cement mortar 1:5 (One cement and five sand) 12mm thick in all floors including cost and conveyance of all materials to site etc,complete as per standard specifications | 583.2 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_779759.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].