Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical GUDVELA | Accepted-Technical as per DTCN |
| 2 | Accepted-Technical AGALPUR BLOCK IN THE DISTRICT OF BALANGIR | Accepted-Technical as per DTCN |
| 3 | Accepted-Technical | Accepted-Technical as per DTCN |
| 4 | Accepted-Technical WARD NO 19 BALANGIR MUNICIPALITY P O P S DIST BALANGIR PIN 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | Accepted-Technical as per DTCN |
| 5 | Accepted-Technical | Accepted-Technical as per DTCN |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
7 Jul 2026, 5:00 pmClosed
CCE R and B CIRCLE BALANGIR
O/O CCE R and B CIRCLE BALANGIR
building work
2026_EICCL_129583_2
CCE(R and B)BGR-21-2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
balangir
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.5 L
Yes
9 Oct 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
23 Jun 2026 - 7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in ordinry soil within 50m lead and 1.5m lift including rough dressing and breaking clods to maximum 5cm. To 7cm. And laying in layers not exceeding 0.3m in depth and as per specification complete. | 219.19 | Cum | 206.06 | ₹45,166.29 |
| 2 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 331.39 | Cum | 594.86 | ₹1,97,130.66 |
| 3 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 44.27 | Cum | 5,530.32 | ₹2,44,827.27 |
| 4 | R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge.
Column Base
Footing | 61.81 | Cum | 6,191.54 | ₹3,82,699.09 |
| 5 | Grade Beam
Plinth Beam | 18.81 | Cum | 7,061.89 | ₹1,32,834.15 |
| 6 | Columns
Up to plinth | 3.09 | Cum | 15,454.45 | ₹47,754.25 |
| 7 | Ground floor | 9.74 | Cum | 15,454.45 | ₹1,50,526.34 |
| 8 | First Floor | 8.86 | Cum | 17,503.86 | ₹1,55,084.2 |
| 9 | Terrace | 3.22 | Cum | 19,957.03 | ₹64,261.64 |
| 10 | Beams in Super structure
Ground floor | 14.73 | Cum | 15,454.45 | ₹2,27,644.05 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_592131.xls
BOQ • 0.49 MB
DTCN2.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .