Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
7 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
CCE R and B CIRCLE BALANGIR
O/O CCE R and B CIRCLE BALANGIR
building work
2026_EICCL_129583_2
CCE(R and B)BGR-21-2025-26
National Competitive Bid
Civil Works - Buildings
270 days
balangir
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.5 L
Yes
23 Jun 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
23 Jun 2026 - 7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in ordinry soil within 50m lead and 1.5m lift including rough dressing and breaking clods to maximum 5cm. To 7cm. And laying in layers not exceeding 0.3m in depth and as per specification complete. | 219.19 | Cum | 206.06 | ₹45,166.29 | BI01010001010000000000000515BI0100001113 |
| 2 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 331.39 | Cum | 594.86 | ₹1,97,130.66 | BI01010001010000000000000515BI0100001114 |
| 3 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 44.27 | Cum | 5,530.32 | ₹2,44,827.27 | BI01010001010000000000000515BI0100001115 |
| 4 | R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge.
Column Base
Footing | 61.81 | Cum | 6,191.54 | ₹3,82,699.09 | BI01010001010000000000000515BI0100001116 |
| 5 | Grade Beam
Plinth Beam | 18.81 | Cum | 7,061.89 | ₹1,32,834.15 | BI01010001010000000000000515BI0100001117 |
| 6 | Columns
Up to plinth | 3.09 | Cum | 15,454.45 | ₹47,754.25 | BI01010001010000000000000515BI0100001118 |
| 7 | Ground floor | 9.74 | Cum | 15,454.45 | ₹1,50,526.34 | BI01010001010000000000000515BI0100001119 |
| 8 | First Floor | 8.86 | Cum | 17,503.86 | ₹1,55,084.2 | BI01010001010000000000000515BI0100001120 |
| 9 | Terrace | 3.22 | Cum | 19,957.03 | ₹64,261.64 | BI01010001010000000000000515BI0100001121 |
| 10 | Beams in Super structure
Ground floor | 14.73 | Cum | 15,454.45 | ₹2,27,644.05 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_592131.xls
BOQ • 0.49 MB
DTCN2.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid