Loading…
Loading…
Tender Value
₹25,000
EMD Value
₹2,500
Closing Date
20 Jun 2026, 10:00 am6d left
SP BIJNOR
SP OFFICE BIJNOR
THANA KOTWALI DEHAT ME AWASIYE BHABANO KE PANI NIKASI HETU NALI TAK NALI MRAMMAT WORK
2026_UPPOL_1159392_1
BH-55/2026 THANA KOTWALI DEHAT ME AWASIYE BHABANO KE PANI NIKASI HETU NALI TAK NALI MRAMMAT WORK
Open Tender
Repair and Maintenance Works
30 days
SP OFFICE BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SP BIJNOR
₹2,500
13 Jun 2026
13 Jun 2026
22 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead, watering upto required O.M.C. compacted to 95% proctor density including roayalty, the cost of water, roller charges, its loading, unloading, carriage and all labour and T&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge. Rates include Rs. 6 per cum royalty which shall be deducted from contractor bill. S.No. 251 | 3.57 | Cum | 200 | ₹714 |
| 2 | Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 8:4:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. S.No. 281 | 0.89 | Qtl. | 6,820 | ₹6,069.8 |
| 3 | M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.No. 307 | 1.93 | Sqm | 5,310 | ₹10,248.3 |
| 4 | Cement concrete with 2 cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of work. S.No. 279a | 0.37 | Sqm | 7,100 | ₹2,627 |
| 5 | 12 mm thick plaster with 1 part of cement and 3 part ofcoarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. S.No. 583 | 8.4 | Sqm | 215 | ₹1,806 |
| 6 | Add GST 18% | 1 | Job | 3,863.71 | ₹3,863.71 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_2172843.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid