Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 37 Nos. Isolation stopping in G-IIIB Seam P-1 Panel of Bagdewa UG Mine.
2026_SECL_366509_1
SECL/GM/KB/SO(M)/eNIT/26-27/31 dt 03.10.26
Open Tender
Civil Works - Buildings
Item Rate
240 days
Korba
As per NIT
5 documents required · 5 mandatory
₹77,400
3 Oct 2026
3 Oct 2026
22 Oct 2026
3 Oct 2026
21 Oct 2026
5 Oct 2026
3 Oct 2026 - 14 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Groove cutting in roof/ floor for Stopping & Manhole by using chisel & hammer in Hard Stone and removal of excavated cuttings up to a distance of 30m. | 18.5 | Cubic Meter | 6,981.72 | ₹1,29,161.82 |
| 2 | Groove cutting in roof/ floor for Stopping & Manhole by using chisel & hammer in Coal and removal of excavated cuttings up to a distance of 30m | 51.8 | Cubic Meter | 2,480.95 | ₹1,28,513.21 |
| 3 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 177.6 | Cubic Meter | 775.18 | ₹1,37,671.97 |
| 4 | Loading of materials (Cement) into tub on surface within a lead of 50m. | 83.05 | Metric Tonne | 230.48 | ₹19,141.36 |
| 5 | Loading of materials (Sand) into tub on surface within a lead of 50m. | 93.69 | Cubic Meter | 397.81 | ₹37,270.82 |
| 6 | Loading of materials (Stone chips) into tub on surface within a lead of 50m. | 157.3 | Cubic Meter | 397.81 | ₹62,575.51 |
| 7 | Loading of materials (Steel) into tub on surface within a lead of 50m. | 11.95 | Metric Tonne | 230.48 | ₹2,754.24 |
| 8 | Unloading of materials (Cement) at destination in U/G. | 83.05 | Metric Tonne | 209.17 | ₹17,371.57 |
| 9 | Unloading of materials (Sand) at destination in U/G. | 93.69 | Cubic Meter | 361.04 | ₹33,825.84 |
| 10 | Unloading of materials (Stone chips) at destination in U/G. | 157.3 | Cubic Meter | 361.04 | ₹56,791.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 0.85 MB
BOQ_379446.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .