Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
16 Jan 2020, 4:00 pmClosed
Ex. Engineer CDK JK Sports Council
Office of the Xen CDK JK Sports Council Adm block
Construction of Synthetic (Acrylic surface) Lawn Tennis Court at SKMSAC Gindun Rajbagh Srinagar
2020_SPORT_89842_2
Fresh NIT NO 79 of 2019-20
Open Tender
Civil Works
Item Rate
45 days
SKMSAK Gindun Rajbagh Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Ex. Engineer CDK JK Sports Council
₹38,000
11 Feb 2020
6 Jan 2020
17 Jan 2020
6 Jan 2020
16 Jan 2020
7 Jan 2020
Amount
Construction Sub Base & Base : Supply & stacking of graded stone aggregate,stone screening and binding material at site incl. laying of water bound macaddam with specified stone aggregate, stone screening and binding material incl. screening, sorting, spreading to template and consolidation with PRR of 8-10 Tonne capacity etc. complete with all carriage. Base course with stone aggregate 63-45mm incl. stone screening 13.2mm
Providing and laying wet mix macadam on prepared sub grade/sub base with crushed quarry stone aggregate of specified grading as per IRC/MOST specification including mixing crushed material with predetermined quantity of water in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80/100KN capacity speed of which should not exceed 5KM/Hour for each layer, rolling should continue till 98% density is achieved to approved grade and X-section the mixing is to be prepared in approved mech, mixing plant of suitable capacity including laying of cold emulsion with pressure sprayer at the rate 0.75 kgs/sqm complete, including cost of all materials, all leads lifts octroi charge taxes etc.
Providing and applying tack coat using hot straight run bitumen of grade 80/ 100Including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc. and finally booming the surface as per specifications.On W.M.M.@ 0.75 Kg/sqm
Providing and laying 50mm thick premix bituminous macadam base course with stone aggregate of quality size and grading as specified in MORTH and straight run bitumen of grade 80/100 @3% by weight of total mix @ 60kg/cum including hot mixing of stone aggregate and bitumen in hot mix ,plant transportation and laying mixed material with paver finisher to the required level and grade incl. rolling with road roller of 8-10 tonne capacity to achieve the require compaction and density (including cost & carriage of tar & allied materials involved complete.)
Providing and laying 25mm thick Semidence bituminous concrete using material aggregate satisfying the gradation set out in specification with 5% binder content (by weight of total mix) bitumen of grade 80/100 @2.88Kgs/sqm with the aid of hot mix plant and paver finisher including rolling with 8-10 tonne capacity to achieve the require compaction and density (including cost & carriage of tar & allied materials involved complete.)
Curbing Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of surplus excavated soil to be leveled and neatly dressed within 100mts lead.or as directed by site incharge.
P/L stone soling duly hand packed incl ramming with heavy hand rammer all carriage upto site of work
Providing and laying in Position Cement Concrete of specified grade excl. the cost of centering, shuttering in 1:4:8 with (1 cement : 4 course sand : 8 graded stone agg. 40mm nominal size crushed aggregate) incl. all carriage upto site of work.
P/L in position specified grade of cement concrete in 1:1.5:3 (1 cement : 1.5 Course Sand: 3 graded stone agg. ) 20mm nominal size aggregates excl. the cost of centering shuttering finishing , in beams, lintels, slab etc upto floor v-level incl. all leads, lifts and carriages complete.
Centring and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns
Acrylic Surface Base 8 LAYER ACRYLIC FLOORING SYSTEM (IATF Classified): Providing and laying 8 layer acrylic flooring system as per specifications mentioned below: a) P/applying 2 layers of resurfacer b) P/laying 4 layers of cushion c) P/applying 3 layers of color coating of acrylic rubber paint as per specifications d) All game lines marking to be done as per international standards Of ISO 9001 & 2015 certified make.
Elevees Infrastructure Private Limited
RAYZON GLOBAL LLP
will corporation
M/S ESS AAR INFRASTRUCTURE
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .