Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance Accept |
| 2 | L2₹1.5 L+₹3,485.30 (2.33%)Rejected-Finance | ₹1.5 L+₹3,485.30 (2.33%) | L2 | Rejected-Finance Reject |
| 3 | L3₹1.6 L+₹5,846.10 (3.91%)Rejected-Finance | ₹1.6 L+₹5,846.10 (3.91%) | L3 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | mayil engineering L1 | SRS ENGINEERING CONSTRUCTION L2 | Sri Constructions L3 |
|---|---|---|---|---|---|---|
| 1.00Name of Work: Extension of Pipeline Work and Providing Public Stand at Sri Vaari Garden (CSI Colony) H/O Kondayampalayam Panchayat . SS Kulam union in Coimbatore District under Village Panchayat General Fund 2026-2027-Package No. TN 01-SSKM-02 | ||||||
| 2.00 | Supply of 90 MM pvc pipe KSC 6 including all labour charges etc | 252 | metre | 142 ₹35,784 | 135 ₹34,020 Lowest | 150 ₹37,800 |
| 3.00 | Supply of 63 MM pvc pipe KSC 6 including all labour charges etc | 252 | metre | 73.5 ₹18,522 Lowest | 120 ₹30,240 | 75 ₹18,900 |
| 4.00 | Supply of 80 MM GM GATEVALVE including all labour charges etc | 1 | nos | 5,877 ₹5,877 | 3,500 ₹3,500 Lowest | 6,000 ₹6,000 |
| 5.00 | Supply of 50 MM GM GATEVALVE including all labour charges etc | 1 | nos | 2,370 ₹2,370 Lowest | 3,000 ₹3,000 | 2,400 ₹2,400 |
| 6.00 | Earthwork Excavation for Pipe Laying Work Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B Including all Labour Charges to Complete. | 158.76 | cum | 329.6 ₹52,327.3 | 260 ₹41,277.6 Lowest | 340 ₹53,978.4 |
| 7.00 | Lowering PVC Rigid Pipes and Specials to Trench and laying to proper grade and alignment , joining with PVC Specials with Solvent including all Charges to Complete.( 90 mm Pvc Pipes) | 252 | metre | 23.5 ₹5,922 Lowest | 35 ₹8,820 | 25 ₹6,300 |
| 8.00 | Lowering PVC Rigid Pipes and Specials to Trench and laying to proper grade and alignment , joining with PVC Specials with Solvent including all Charges to Complete.( 63 mm Pvc Pipes) | 252 | metre | 23.5 ₹5,922 Lowest | 35 ₹8,820 | 25 ₹6,300 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 22,810 ₹22,810 Lowest | 23,342 ₹23,342 | 23,702 ₹23,702 |
Tender Value
₹1.6 L
EMD Value
₹1,600
Closing Date
17 Sept 2026, 3:00 pmClosed
The Special Officer Kondayampalayam Panchayat
The Special Officer Kondayampalayam Panchayat
Extension of Pipeline Work and Providing Public Stand at Sri Vaari Garden (CSI Colony) H/O Kondayampalayam Panchayat
2026_RDTN_701307_1
01/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
180 days
Kondayampalayam
Extension of Pipeline Work and Providing Public Stand at Sri Vaari Garden (CSI Colony) H/O Kondayampalayam Panchayat
4 documents required · 4 mandatory
₹0
₹1,600
18 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Extension of Pipeline Work and Providing Public Stand at Sri Vaari Garden (CSI Colony) H/O Kondayampalayam Panchayat . SS Kulam union in Coimbatore District under Village Panchayat General Fund 2026-2027-Package No. TN 01-SSKM-02 | - | - | - | - |
| 2 | Supply of 90 MM pvc pipe KSC 6 including all labour charges etc | 252 | metre | - | - |
| 3 | Supply of 63 MM pvc pipe KSC 6 including all labour charges etc | 252 | metre | - | - |
| 4 | Supply of 80 MM GM GATEVALVE including all labour charges etc | 1 | nos | - | - |
| 5 | Supply of 50 MM GM GATEVALVE including all labour charges etc | 1 | nos | - | - |
| 6 | Earthwork Excavation for Pipe Laying Work Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B Including all Labour Charges to Complete. | 158.76 | cum | - | - |
| 7 | Lowering PVC Rigid Pipes and Specials to Trench and laying to proper grade and alignment , joining with PVC Specials with Solvent including all Charges to Complete.( 90 mm Pvc Pipes) | 252 | metre | - | - |
| 8 | Lowering PVC Rigid Pipes and Specials to Trench and laying to proper grade and alignment , joining with PVC Specials with Solvent including all Charges to Complete.( 63 mm Pvc Pipes) | 252 | metre | - | - |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
pricebid.pdf
Tender Documents • 0.91 MB
tech.pdf
Tender Documents • 1.04 MB
BOQ_842941.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .