| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.1 LAccepted-AOC | ₹77.1 L Quoted ₹65.3 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
Tender Value
₹90.7 L
EMD Value
₹1.8 L
Closing Date
7 Dec 2024, 12:00 pmClosed
CGM OnM UAR
1st Floor, Bijulee Bhawan, Paltan-Bazar, Guwahati-01
Construction of new B (plus) 3 tower on pile foundation in place of river eroded tower at Loc. No. 200 of 132KV Gohpur-Nalkata D/C line near Shingora River
2024_AEGCL_39431_1
AEGCL/MD/CGM(UAR)/GOH-NLK/BID
Open Tender
Electrical Works
Works
180 days
Doluhat, near Shingora, River, Nowboisha
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹1.8 L
29 Mar 2025
30 Sept 2024
9 Dec 2024
30 Sept 2024
7 Dec 2024
14 Oct 2024
30 Sept 2024 - 14 Oct 2024
Amount
Tower superstructures
Galvanised Lattice steel tower super structure including hangers, gussets, strain plates B+3= 1 Nos.
Stub sets
Partially galvanised stub angle with cleat
Stub setting template
Stub setting template
Nuts and bolts
Galvanized Nuts and Bolts
Power Conductor
ACSR Panther Conductor
Insulators
90KN Porcelain Insulators
Power Conductor Accessories
Double tension hardware fittings suitable for ACSR panther conductor
Vibration Damper suitable for ACSR panther conductor
OPGW 24 fibre (overhead cable)
OPGW Downlead clamps
OPGW Vibration Damper c/w preform armour rods
OPGW optical splice kit including junction box
OPGW tension double dead end set without splice location (Tension tower arrangement)
OPGW suspension assembly with twisted link c/w preform armour rods & lower bond clamp
Tower Accessories
Supply of Danger plate
Supply of Phase plate
Supply of Number plate
Supply of Anti Climbing Device
Description of Work / Item(s)
Amount
Tower superstructures
Galvanised Lattice steel tower super structure including hangers, gussets, strain plates B+3= 1 Nos.
Stub sets
Partially galvanised stub angle with cleat
Stub setting template
Stub setting template
Nuts and bolts
Galvanized Nuts and Bolts
Power Conductor
ACSR Panther Conductor
Insulators
90KN Porcelain Insulators
Power Conductor Accessories
Double tension hardware fittings suitable for ACSR panther conductor
Vibration Damper suitable for ACSR panther conductor
OPGW 24 fibre (overhead cable)
OPGW Downlead clamps
OPGW Vibration Damper c/w preform armour rods
OPGW optical splice kit including junction box
OPGW tension double dead end set without splice location (Tension tower arrangement)
OPGW suspension assembly with twisted link c/w preform armour rods & lower bond clamp
Tower Accessories
Supply of Danger plate
Supply of Phase plate
Supply of Number plate
Supply of Anti Climbing Device
Description of Work / Item(s)
Amount
Survey
Detail & Check survey as per specification
Stub settting
Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling
Erection of Superstructure
Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site
Weilding of all nuts & bolts upto the bottom cross arm level including all charges of transportation, materials etc.
Stringing
Stringing of power conductors including transportation from stores and distribution of conductors and accessories to sites and laying, stringing, tensioning , clamping, jointing, jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned elsewhere per route Km of line
Stringing of OPGW including transportation and distribution of ground wire and accessories to sites and laying, stringing, tensioning , clamping, jointing, jumpering and hoisting of insulators complete including all fittings and accessories not specifically mentioned elsewhere per route Km of line
Grounding and other works
Grounding of towers with 3 metre long 25mm dia GI pipe including cost of all materials, such as GI pipes, GI bolts & nuts and washers, salt, cock etc as per specification
Painting of the towers with bituminuous paints of approved quality up to a 3 meters from ground level including the cost of paints
Erection of Danger plates
Erection of Phase plates
Erection of Number plates
Erection of anti-climbing device
Arrangement of ERS, erection & dismantling of ERS towers and all necessary associated works involving ERS required for completion of the work
Description of Work / Item(s)
Amount
Construction of Pile Foundation
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Providing ,driving with hydralic piling rigs with power unit and installing driven cast-in-situ reinforced cement concrete piles of grade M25 including the cost of reinforcement steel, cost of boring with temporary guide casting bentonite solution (length of the pile for payment shall be measured from the Ground level). All necessary labour materials plants, tools and tackles etc. complete as necessary for proper execution of the job. The pile top should be chipped off to remove laitance concrete above cut off level 1m from the top of the pile (no additional payment shall be done for this) The unit rate should include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced cement concrete, supply & providing MS liner of 6 mm thick in piles up to 10 metre depth from ground level. Each leg will require 1 nos RCC bored pile of 1200 mm diameter i.e. 4 nos of pile each tower foundation. (Payment will be made as per actual length of the piles as per site condition necessary and approved drawing.) (A) 1200 mm dia piles 4 Nos. of pile
Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam including reinforcement steel form work all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete.
Conducting Pile Integrity test on piles using electronic control unit, hand held hammer, accelerometer, computer with required software to assess as-installed pile characteristics including mobilisation of necessary manpower, equipments, materials etc. required for successful completion of the job.
Description of Work / Item(s)
Amount
Opening and lowering of OPGW along with accessories from the portion of the line to be dismantled and transportation to the AEGCL store
Opening and lowering of the power conductor from the portion of the line to be dismantled and transportation to the AEGCL store
Dismantling of tower without damaging the members, transportation of tower materials and accessories to AEGCL store and proper stacking
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .