Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.2 L+₹14,494.46 (4.76%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.3 L+₹29,578.53 (9.71%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.7 L+₹62,252.49 (20.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.0 L+₹98,365.82 (32.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹9,900
Closing Date
24 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Kupwara
Executive Engineer RnB Division Sulkote Kupwara
Construction of Kasam link road at Zirhama
2026_PWDJK_324807_24
NIT No. 48 of 2026-27 of RnB Division Kupwara
Open Tender
Civil Works
Item Rate
12 days
Zirhama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Kupwara
₹9,900
28 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking at site 63 mm to 45 mm crushed / quarry and spreading stone chipping rolling with PRR all complete job. | 19.8 | cum | 1,204.15 | ₹23,842.17 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 39.6 | cum | 7,788.4 | ₹3,08,420.64 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 792 | kg | 123 | ₹97,416 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, etc | 24.99 | sqm | 286.35 | ₹7,155.89 |
| 5 | Carriage of materials by mechanical transport from source upto site of work including loading, unloading and stacking a) Aggrgrates for an lead of 20km | 35.24 | cum | 409.94 | ₹14,447.93 |
| 6 | b)Sand for lead of 45 km | 17.82 | cum | 685.94 | ₹12,223.45 |
| 7 | c) Carriage of Grade 2nd for lead of 100km | 19.8 | cum | 1,405.64 | ₹27,831.67 |
stage.html
html • 0.03 MB
finance_1096065.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_1096065.xls
BOQ • 0.42 MB
corrigendum_48_50.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .