| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-Finance | L1 | Accepted-Finance Responsive | |
| 2 | L2₹12.0 L+₹1.0 L (9.33%)Accepted-Finance GOVT CONTRACTOR HADDO SRI VIJAYA PURAM 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | L2 | Accepted-Finance Responsive | |
| 3 | L3₹12.7 L+₹1.7 L (15.5%)Accepted-Finance | L3 | Accepted-Finance Responsive | |
| 4 | L4₹14.4 L+₹3.5 L (31.7%)Accepted-Finance | L4 | Accepted-Finance Responsive | |
| 5 | L5₹17.3 L+₹6.4 L (58.3%)Accepted-Finance MARTHOMA CHURCH COMPLEX GOAL GHAR PORT BLAIR PIN 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L5 | Accepted-Finance Responsive |
Tender Value
₹17.0 L
EMD Value
₹34,012
Closing Date
9 Oct 2024, 3:00 pmClosed
Executive Engineer,CD-I,A.P.W.D,. Port Blair
Executive Engineer,CD-I,A.P.W.D,. Port Blair
Construction of Barbed wire fencing with RCC Post around GPS School Bharatpur Campus at Shaheed Dweep under CD-I, A.P.W.D, Port Blair.
2024_APWD_15640_1
07/NIT/DB/CD-I/PB/24-25
Open Tender
Civil Works - Buildings
Works
60 days
Shaheed Dweep
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹34,012
17 Oct 2024
23 Sept 2024
9 Oct 2024
23 Sept 2024
9 Oct 2024
23 Sept 2024
23 Sept 2024 - 3 Oct 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).
1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work.
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire
Placing and erecting the R.C.C posts in position including the cost of carriage, lifting, plumbing, side supports etc. all complete as per the direction of EIC.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
M PERUMAL (BID ID -47068)
Shri Pankaj Roy (BID ID -47041)
NIAMAT ALI (BID ID -47034)
C.M.ROY CONSTRUCTION (BID ID -47064)
A Palani (BID ID -47037)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .