Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.9 LAccepted-Finance | ₹64.9 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹72.0 L+₹7.1 L (10.9%)Rejected-Finance | ₹72.0 L+₹7.1 L (10.9%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹74.0 L+₹9.1 L (14.0%)Rejected-Finance 124 A NSC BOSE ROAD KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹74.0 L+₹9.1 L (14.0%) | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹87.7 L+₹22.8 L (35.1%)Rejected-Finance NEAR SHAHPURA POLICE STATION 18 INDUS EMPIRE BHOPAL M P 462039 | BHOPAL | BHOPAL | MADHYA PRADESH | 462039 | ₹87.7 L+₹22.8 L (35.1%) | L4 | Rejected-Finance 4th Lowest |
| 5 | L5₹1.2 Cr+₹50.6 L (78.0%)Rejected-Finance PLOT NO 3 FIRST FLOOR SARHAUL OPP HIPA SECTOR 18 GURUGRAM 122001 HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹1.2 Cr+₹50.6 L (78.0%) | L5 | Rejected-Finance 5th Lowest |
| Sl No | Description | Qty | Unit | C. E. Testing Company Pvt Ltd L3 | UNIVERSAL SURVEY AND ENGINEERING CONCERN L2 | Xplorer Consultancy services pvt ltd L5 | CDC CONSULTING DESIGN ENGG. CENTRE PVT. LTD. L1 | A AND A CONSULTING ENGINEER L4 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Consultancy Services for Preparation of Detailed Project Report for Construction of 4/6-Lane new bridge 1. At downstream side of the damaged Tilpara barrage over river Mayurakshi 2. Over river Brahmani at chainage 398.45km on NH-60 (new NH-14 3. Over river Gambhira at chainage 418.918km on NH-60 (new NH-14) under National Highway Division-XII, P.W.(Roads) Directorate in the district of Birbhum in the State of West Bengal during the year 2025-26.(2nd Call) | 1 | No | 73,99,000 ₹73,99,000 | 71,99,999 ₹71,99,999 | 1,15,50,000 ₹1,15,50,000 | 64,90,000 ₹64,90,000 Lowest | 87,65,432 ₹87,65,432 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
5 May 2026, 2:30 pmClosed
EXECUTIVE ENGINEER
NH DIVISION NO. XII TILPARA SURI BIRBHUM
Consultancy Services for Preparation of Detailed Project Report for Construction of 4 6 Lane new bridge 1 At downstream side of the damaged Tilpara barrage over river Mayurakshi 2 Over river Brahmani at chainage 398 45km on NH60 new NH 14
2026_WBPWD_1017347_1
NIQ No 11 of 2025 26 of EE NH Division No XII PW Roads Directorate
Open Tender
CIVIL WORKS
Percentage
300 days
SURI
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
26 May 2026
2 Mar 2026
7 May 2026
2 Mar 2026
5 May 2026
2 Mar 2026
Consultancy Services for Preparation of Detailed Project Report for Construction of 4/6-Lane new bridge 1. At downstream side of the damaged Tilpara barrage over river Mayurakshi 2. Over river Brahmani at chainage 398.45km on NH-60 (new NH-14 3. Over river Gambhira at chainage 418.918km on NH-60 (new NH-14) under National Highway Division-XII, P.W.(Roads) Directorate in the district of Birbhum in the State of West Bengal during the year 2025-26.(2nd Call)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2499724.xls
BOQ • 0.25 MB
4thCorrigendum.pdf
PDF • 0.40 MB
3rdcorrigendum.pdf
PDF • 0.29 MB
2ndcorrigendum11.pdf
PDF • 0.32 MB
Corrigendum11.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .