Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.9 LAccepted-AOC LAKSHMI NAGAR ACHHALDA AURAIYA | ETAWAH | UTTAR PRADESH | 206120 | ₹76.9 L Quoted ₹65.2 L | L1 | Accepted-AOC AoC |
| 2 | L2₹65.3 LRejected-Finance MAHUADABAR PACHAT MISHROLIYA DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹65.3 L | L2 | Rejected-Finance Rejected |
Tender Value
₹69.2 L
EMD Value
₹1.4 L
Closing Date
18 May 2026, 12:00 pmClosed
SE RED Gorakhpur Circle
SE RED Gorakhpur Circle, Daudpur, Canal Road, (Durga Mandir Compound), Post-Shivpuri, Gorakhpur
Under District Gorakhpur, Construction of CC road in various lanes from Prime Minister Road to Nausad in village Pipri of block Piprauli., Lot No 16
2026_REDUP_1145688_16
07/SE RED Gorakhpur/Gorakhpur/26-27 Dt 02/04/2026
Open Tender
Civil Works
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹1.4 L
SE RED Gorakhpur Circle
7 Jun 2026
6 May 2026
19 May 2026
6 May 2026
18 May 2026
6 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2 with a lead upto 8000 m as per Technical Specification Clause 301.5 Sr. No.3.4 MORD 301.5 | 3,150 | Cum | 224.2 | ₹7,06,230 | |
GSB Grade-1
Construction of granular sub-base by providing well graded material in widening portion and compacted thickness 12.50cm spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density. This work includes cost of all materials, labour, and hire charges of road roller, machinery, T&P etc complete. Complete work as per Technical Speicification Clause 401 and as per direction of E/I. | 283.5 | Cum | 3,787.65 | ₹10,73,798.78 | |
WBM G-3 - Providing and laying in width 3.75m and compacted thickness 7.50cm spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing olling with smooth wheel roller 80 100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity. This work includes cost of all materials, labour, and hire charges of road roller, machinery, T&P etc complete. Complete work as per Technical Speicification Clause 405 (3) and as per direction of E/I. | 196.88 | Cum | 5,071.1 | ₹9,98,398.17 | |
Construction of un-reinforced, dowel jointed, at expansion and construction joint only, plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2M 30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finshed in continous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing of concrete slab for 14- days, using curing compound (where specified) and water finishing to lines and grades as per drawing and Technical Specification Clause 1501 | 393.75 | Cum | 9,278.08 | ₹36,53,244 | |
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2 with a lead upto 8000 m as per Technical Specification Clause 301.5 Sr. No.3.4 MORD 301.5 | 441 | Cum | 214.7 | ₹94,682.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.63 MB
Tendernotice_2.pdf
PDF • 6.32 MB
BOQ_2141952.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid