Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC VILLAGE SANGRAMPURA JEENPUAR SAWAI MADHOPUR 322001 | SAWAI MADHOPUR | SAWAI MADHOPUR | RAJASTHAN | 322001 | ₹12.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.6 LRejected-Finance HOUSE NO 3 ANANDA NAGAR SIXMILE KAMRUP ASSAM 781022 UDYAM AS 03 0004106 | KAMRUP METRO | ASSAM | 781022 | ₹12.6 L | L2 | Rejected-Finance Not L1 |
| 3 | L3₹12.9 LRejected-Finance VPO NEAR ARYA SAMAJ KHERA RASOOLPUR KOTA | ₹12.9 L | L3 | Rejected-Finance Not L1 |
Tender Value
₹14.5 L
EMD Value
₹29,000
Closing Date
23 Feb 2026, 12:00 pmClosed
Estate Officer
Agriculture Unversity, Kota
Construction of farm approach grawel road at KVK Sawai Madhopur(Under RKVY-27)
2026_AUK_538437_1
EO/NIT9/2025-26/531-1
Open Tender
Civil Works - Roads
60 days
Sawai Madhopur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Estate Officer
₹29,000
Yes
11 Mar 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Farm Approach gravel road
Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MANUAL MEANS In area of Light Jungle
Loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by vibratory roller 8-10 tonne to achieve minimum dry density as given in table 300-2 for embankment construction as per MoRTH specification : Clause No. 305.
Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift
Providing, laying and spreading of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. By Mix in Place Method Grading-III
Providing and Laying cement concrete 1:4:8 in sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per Table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trail length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonne vibratory roller, finishing and curing as per MoRTH specification : Clause No. 601, 112.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_959632.xls
BOQ • 0.26 MB
Nit09.pdf
Tender Documents • 2.45 MB
Download all tender documents and submit your bid