| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹3.4 L+₹10,896 (3.32%)Rejected-AOC | L2 | Rejected-AOC REJECT |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
28 Aug 2024, 3:00 pmClosed
EXECUTIVE OFFICER,ANNAVASAL TOWN PANCHAYAT
EXECUTIVE OFFICER,ANNAVASAL TOWN PANCHAYAT
Construction Of RCC Slab Culvert 2 Nos With storm water Drain at Ward No 09 Nallammal Chathiram Road in Annavasal Town Panchayat.
2024_DTP_476171_3
10/a1/2024
Open Tender
Civil Works
Works
30 days
EXECUTIVE OFFICER, ANNAVASAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
21 Sept 2024
23 Aug 2024
28 Aug 2024
23 Aug 2024
28 Aug 2024
23 Aug 2024
Amount
Earthwork excavation in all soils and sub soils except hard rock not requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Centering for PCC work including cost of material all labour charges etc. compeleted as per standard speifications
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Centering for sides and sofilts for RCC slabs and beams lintels and other flat surfaces below 3m height including strutting arrangements as per standard specification and removing the same after the specified period and including cost of all other inciden
Supplying fabrication and placing in position of mild steel or ribbed for steel for all RCC works including cost of steel, binding wire and labour charges for cutting, bending etc. complete as per standard specification.
Reinforced Cement concrete 1:1 1/2:3 (one cement, One one and half sand, three aggregate) using machine crushed 20mm size ISS guage HBG metal for foundation including cost of all materials to site and all labour charges for mixing, laying, ramming, curing, concrete etc. co
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
A THANGARAJU (BID ID -1122371)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_565486.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .