| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L Quoted ₹16.6 L | L1 | Accepted-AOC Admitted |
| 2 | L2₹16.7 L+₹7,485.27 (0.45%)Rejected-AOC | ₹16.7 L+₹7,485.27 (0.45%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SARAVANAN T L2 | Senthil Kumaran Contractor L1 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Litres capacity OHT (12.00m Staging Height ) at Sellampatti H/o.Vilangamudi | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete | 38.88 | Cum | 225 ₹8,748.45 | 224 ₹8,709.57 Lowest |
| 3.00 | second depth | 6.78 | Cum | 225 ₹1,524.6 | 224 ₹1,517.82 Lowest |
| 4.00 | Sand filling for foundation with clear sand including cost of sand, watering, ramming and consolidation etc., complete | 1.94 | Cum | 1,494 ₹2,892.38 | 1,487 ₹2,878.83 Lowest |
| 5.00 | Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBGS for leveling course for foundation including the cost of mixing concrete, ramming curing etc. complete | 2.9 | Cum | 4,790 ₹13,910.16 | 4,769 ₹13,849.18 Lowest |
| 6.00RCC 1:1:5.3 (one cement, one and half sand and three aggregates) using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing the concrete,vibrating, finishing, curing etc., complete. | |||||
| 7.00 | A. 1.5m to 4.5m below GL | 6.75 | Cum | 8,534 ₹57,630.1 | 8,498 ₹57,386.99 Lowest |
| 8.00 | B. 0m to 1.50m below GL | 1.75 | Cum | 8,416 ₹14,719.58 | 8,380 ₹14,656.62 Lowest |
| 9.00 | C. 0 m to 4.5 m from GL | 2.83 | Cum | 8,536 ₹24,148.34 | 8,499 ₹24,043.67 Lowest |
| 10.00 | D. 4.51m to 7.32m from GL | 2.22 | Cum | 8,773 ₹19,511.15 | 8,735 ₹19,426.64 Lowest |
Tender Value
₹16.8 L
EMD Value
₹17,000
Closing Date
21 Dec 2023, 4:00 pmClosed
Block Development Officer VP
Kaveripattinam BDO Office
Kgi Dt Kptm Block JJM MVS(State Savings Fund) 2023-24 30000 ltr OHT(12.00m Staging Height) at sellampatti, vilangamudi pts Pckg No - 2023-2024-KPTM-44
2023_RDTN_399744_1
6843_2023_R13_DT_08_12_2023
Open Tender
Civil Works
Item Rate
180 days
Kaveripattinam BDO Office
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,000
Kaveripattinam BDO Office
26 Dec 2025
14 Dec 2023
21 Dec 2023
14 Dec 2023
21 Dec 2023
14 Dec 2023
18 Dec 2023
Amount
Construction of 30000 Litres capacity OHT (12.00m Staging Height ) at Sellampatti H/o.Vilangamudi
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
second depth
Sand filling for foundation with clear sand including cost of sand, watering, ramming and consolidation etc., complete
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBGS for leveling course for foundation including the cost of mixing concrete, ramming curing etc. complete
RCC 1:1:5.3 (one cement, one and half sand and three aggregates) using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing the concrete,vibrating, finishing, curing etc., complete.
A. 1.5m to 4.5m below GL
B. 0m to 1.50m below GL
C. 0 m to 4.5 m from GL
D. 4.51m to 7.32m from GL
E. 7.33m to 10.98m from GL
F.10.98 m to 14.64 m above GL
G.14.64 m 18.30m above GL
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets of suitable size of BG 10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm center to center and supported by casuarina props of 10cm 13cm dia spaced at 75cm center to center complying with standard specifications etc., completd and as directed by TWAD Board officers.
A. PLANE SURFACE BGL
c. GL to 3.30m ht.
d. 5.31m to 6.30m
e.From 8.30m to 9.30m above G.L
f.From 11.30 m to 12.30m
B. CURVED SURFACE
C. SQUARE COLUMN
Square column Below G.L.
Ground level to 3.30 m
Square column 3.31 to 4.30m
Square column 4.31 to 5.30m
Cement paint (New wall )Two Coats with approved cement Paint over one prime coat of Cement primer over Plastered surface including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Supplying fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.
Fabrication, supply, delivery and fixing of outside MS ladder of 45 cm wide made out of 50x 50 x 6 mm MS angle for sides and steps in 16mm dia MS rod at 30cm centre to centre welded, Jointed etc., providing with suitable side supports, clamps and locking
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., complete as directed by the TWAD officer.
Providing pvc Ventilation arrangement 2 nos mosquito proof nylon net with 65 mm GI pipe and spls as directed by the Departmental officers 1 m 65 mm Gi pipe, 4 nos 65 mm Gi elbow , 4nos cutting and 8 nos threading and 2 nos 65 mm GI tee
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by Departmental officers
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by Departmental officers
Supplying And Fixing Of GI/PVC /HDPE Pipes And Specials including All Charges Etc… Complete
65mm Ø GI pipes for over flow & 1xl
65mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for scour pipe 1xl
65mm Ø GI pipe for delivery 1x1 pipe
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 90degree Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65x50mm Ø GI Reducer
75mmx 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm Ø GM Gate valve
50mm Ø GM gate valve
50mm Ø GI coupler
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Provision for Soak pit as per sub estimate
Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
Provision for Chlorinator as per sub estimate
90mm dia PVC pipe
63mm dia PVC pipe
32mm dia PVC pipe
63 x20mm PVC saddle
90 x63mm PVC reducer coupler
63mm x 50mm PVC reducer coupler
PVC gate valve 90mm dia
PVC gate valve 63mm dia
32mm PVC Elbow
32mm PVC End cap
90mm PVC End cap
Cost of brackets for PVC pipes
Labour charges for fixing the PVC pipes and specials including all charges
Provision for Pumping pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
90mm PVC 6KSC Pipe
90mm PVC 6KSC Pipe including laying and jointing,
90mmPVC Ball Valve
Provision for distribution pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
63mm 4KSCPVC Pipe
63mm 4KSCPVC Pipe including laying and jointing,
63mm PVC Elbow
63mm PVC Tee
63mm PVC End Cap
63mmPVC Ball Valve
Providing Lettering Nameboard Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SARAVANAN T
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .