| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 CrAccepted-AOC | ₹26.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹26.4 CrRejected-Finance | ₹26.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹28.8 CrRejected-Finance UTTAR PRADESH UP | ₹28.8 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹29.0 CrRejected-Finance | ₹29.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹30.6 CrRejected-Finance | ₹30.6 Cr | L5 | Rejected-Finance L5 |
Tender Value
₹35.4 Cr
EMD Value
₹50 L
Closing Date
19 Dec 2023, 12:00 pmClosed
SE, JNP.GZP CIRCLE PWD JAUNPUR
SE, JNP.GZP CIRCLE PWD JAUNPUR
W/S of Baksha Tejibazar Lohinda ODR road in district jaunpur
2023_CEUVZ_867074_1
4961/SETENDER/JNP.GZPCIRCLE/23 date 10-11-2023
Open Tender
Civil Works
365 days
jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹50 L
SE, JNP.GZP CIRCLE PWD JAUNPUR
5 Mar 2024
4 Dec 2023
19 Dec 2023
4 Dec 2023
19 Dec 2023
4 Dec 2023
4 Dec 2023
Amount
Construction of Embankment with Material obtained from Right of way:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(including all material , T& P, Labour cess etc. but excluding G.S.T.)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.(including all material , T& P, Labour cess etc. but excluding G.S.T.)
Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(including all material , T& P, Labour cess etc. but excluding G.S.T.)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(ncluding all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T.)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(including all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T.)
Providing, laying, spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50 Emulsion in uniform single layer on sub base/ subgrade and compacting with the road roller to achieve the desire density. (including all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T.)
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.(ncluding all material ,Royalty, T& P, Labour cess, bitumen emulsion etc. but excluding G.S.T.)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(ncluding all material ,Royalty, T& P, Labour cess, bitumen etc. but excluding G.S.T.)
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom(inncluding all material ,Royalty, T& P, Labour cess, bitumen etc. but excluding G.S.T)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.(including all material ,Royalty, T& P, Labour cess, bitumen etc. but excluding G.S.T)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (including all material ,Royalty, T& P, Labour cess, bitumen etc. but excluding G.S.T)
Construction of sub-grade and earthen shoulders with approved material obtained from right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2(including all material , T& P, Labour cess etc. but excluding G.S.T.)
Earthwork in excavation of foundation of structures as per drawing and technical specification, including seting out, constructionof shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work(including all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T.)
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation.(including all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T)
RCC Grade M20 using batching plant transit mixer & manual placing.(including all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T)
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications.(ncluding all material ,Royalty, T& P, Labour cess etc. but excluding G.S.T.)
J.P.ENTERPRISES
UMA ASSOCIATES INFRATECH DEVELOPERS PVT LTD
ganga sagar singh
M/S M V D INFRA DEVELOPERS PRIVATE LIMITED
SHYAMA CONSTRUCTION
R N Contractor and Supplier
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf