Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-AOC 5021 1 CAT III MODERN HOUSING COMPLEX MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | 1 | Accepted-AOC Lowest | |
| 2 | 2₹12.9 L+₹51,090 (4.13%)Rejected-Finance A 95 SANJAY NAGAR BHARATPUR RAJ 321001 | BHARATPUR | BHARATPUR | RAJASTHAN | 321001 | 2 | Rejected-Finance Other Than Lowest | |
| 3 | 3₹12.9 L+₹56,095 (4.54%)Rejected-Finance H NO 1101 D GOLDEN SAND APARTMENTS DHAKOLI ZIRAKPUR 140603 | S A S NAGAR | PUNJAB | 140603 | 3 | Rejected-Finance Other Than Lowest | |
| 4 | 4₹13.2 L+₹84,850 (6.86%)Rejected-Finance H NO 982 SECTOR 16 STREET NO 17 SARASWATI VIHAR DERABASSI DISTT SAS NAGAR PB 140507 | S A S NAGAR | PUNJAB | 140507 | 4 | Rejected-Finance Other Than Lowest | |
| 5 | 5₹14.3 L+₹2.0 L (15.8%)Rejected-Finance FLAT NO 4 C GH 39 MANSA DEVI COMPLEX SECTOR 05 PANCHKULA 134 109 HRY | PANCHKULA | PANCHKULA | HARYANA | 134109 | 5 | Rejected-Finance Other Than Lowest |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
26 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGE (I) Highground
AGE (I) Highground Air Force station Highground Chandigarh
PERIODICAL SERVICES TO BUILDINGS INCLUDING REPAIRS TO FINS FACIA AND CHAJJAH AT AIR FORCE STATION HIGHGROUND UNDER AGE (I) HIGHGROUND CHANDIGARH
2022_MES_553807_1
AGE(I)/HG CHD/T-06/2022-23
Open Tender
Civil Works
Item Rate
180 days
Chandigarh
As per tender Documents
8 documents required · 8 mandatory
₹500
AGE (I) Highground
₹30,000
Yes
26 Dec 2022
23 Sept 2022
28 Oct 2022
23 Sept 2022
26 Oct 2022
7 Oct 2022
60 days
Amount
Material and Labour for 10 mm thick rendering in CM 1:3 on concrete surface (edges of chajjas, roof, roof projections and similar work over 10 mm thick dubbing out average on irregular face of walls) in two layers, finished the surface even and smooth without using extra cement, including taking down loose/damaged concrete from the surface and applying two coats of surface finish as per existing finish specifications, complete all as specified and directed. Note:- Double scaffolding and necessary shuttering shall be deemed to be included in the quoted rates against this item.
Material and Labour for rendering (in patch work of square or rectangular shape area not exceeding 3 sqm) 15mm thick on fair faces of brick work or concrete surface in cement mortar 1:4 finished the surface even and smooth (without using extra cement) incl taking down (broken/weak) plastered surfaces complete all as specified and directed.
Material and labour for Plain Cement Concrete (1:2:4) type B-0 using 12.5 mm graded crushed stone aggregates asin roof, kerbs, mud stops rounded or chamferred on edges as in chajjas, including demolition of damaged coving of PCC/mortar on Chajjas also removing the rubbish off the premises of MOD land complete all as specified and directed.
Material and Labour for extra over rendering or plastering for work in isolated widths or in widths not forming part of general plastering such as in bands, sunk panels, cornices, skirtings, drip moulds and similar work exc 15 cm but n exc 30 cm in width or girth; including cutting to edges, all mitres and stopped ends, etc complete all as specified and directed.
Material and labour for preparation of old decorated wall surfaces by brooming down or steel wire brushing and using sand paper scraping down smoke shoot moulds mass and efflorescent salts and trading oil and greasy spots etc i.e leveling/edging the disturbed places/edges using necessary filling of Birla/JK wall care putty to obtain smooth regular/even finish and applying one coat of Ist quality Oil Bound Distemper, complete all as specified and directed.
Material and labour for preparation of old decorated wall surfaces by brooming down or steel wire brushing and using sand paper scraping down smoke shoot moulds mass and efflorescent salts and trading oil and greasy spots etc i.e leveling/edging the disturbed places/edges using necessary filling of Birla/JK wall care putty to obtain smooth regular/even finish on effected portion of wall and two coats of oil bound distemper over a coat of alkali-resistant primer, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of wall, cornices etc by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying two coats of white lime wash on wall, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of wall, cornices etc by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying one coats of white lime wash on wall, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of ceiling by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying one coats of white lime wash on ceiling, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying two coats of colour wash on wall, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying one coat of colour wash on wall, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying one coat of Cement Base Paint on wall, complete all as specified and directed.
Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying two coats of Cement Base Paint on wall, complete all as specified and directed.
Material and labour for preparation of old wooden surfaces over 10cm width or girth not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and directed.
Material and labour for preparation of old steel surfaces over 10cm width or girth not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and directed.
Material and labour for preparation of old decorated plastered / Brick surfaces of by rubbing down and scrapping down with steel wire brushes and applying one coat of exterior grade acrylic emulsion alkali proof ( Ist quality) on wall complete all as specified and as directed.
Material and labour for complete removal of existing treatment on wall of concrete / Brick surfaces including preparation of surfaces by applying exterior wall care putty to achieve smooth surfaces of wall and applying two coats of exterior grade acrylic emulsion alkali proof over and including a coat of primer on wall complete all as specified and as directed.
Taking down cement plaster on brick or stone walls or concrete surfaces, etc, any description including raking out joints, hacking for key, scrubbing down with water, etc and removal of rubbish outside MoD land, complete all as specified and directed.
Material and labour for rendering 15mm thick in cement mortar (1:4), using water proofing compound as per manufacturer's instructions, on brick/concrete surfaces of walls, finished even and fair without using extra cement, complete all as specified and directed. Note :- 1. The quoted rate shall deem to include the cost of scaffolding as the work is required to be executed upto two storey height. 2. Supply only liquid water proofing compound will be measured and paid for separately.
Material and labour for rendering 15mm thick in cement mortar (1:6),using water proofing compound as per manufacturer's instructions on brick/concrete surfaces of walls, finished even and smooth without using extra cement, complete all as specified and directed. Note:- Supply only liquid water proofing compound will be measured and paid for separately
Material and labour for rendering 10mm thick in cement mortar (1:3), on ceiling, using water proofing compound as per manufacturer's instructions on brick/concrete surfaces of walls, finished even and smooth without using extra cement, complete all as specified and directed. Note:- Supply only liquid water proofing compound will be measured and paid for separately
Material and labour for preparation of newly plastered ceilling surfaces and applying three coats of white wash on ceiling complete all as specified and as directed.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of cement based paint over and including a coat of primer on wall, complete all as specified and directed.
Material and labour for preparation of newly plastered surface of wall and applying two coats of 1st quality oil bound distemper (oil emulsion) over and including a coat of alkali resistance primer on walls, complete all as specified and directed.
Demolition of brick masonry work built in cement mortar including all quoins, arches, pillars, staging etc and removal of rubbish outside MOD land, complete all as specified and directed.
Material and labour for brickwork by using subclass 'B' old size bricks, straight or curved on plan exc 6m mean radius, built in cement mortar (1:4), complete all as specified and directed.
Draining out water, cleaning and removing accumulated sludge/ dirt scales from tank bottom, side and from mouths of circulating pipes of service tank of capacity exceeding 500 litre and n.exc 1000 litres, located on roof of building and disinfecting the tank using bleaching powder to make the tank bacteria free, writing by stencil date of cleaning of tank with white synthetic enamel paint on black ground “Cleaned on (date)”, height of words 100 mm, complete all as specified and directed
Draining out water, cleaning and removing accumulated sludge/ dirt scales from tank bottom, side and from mouths of circulating pipes of service tank of capacity exceeding 250 litre and n.exc 500 litres, located on roof of building and disinfecting the tank using bleaching powder to make the tank bacteria free, writing by stencil date of cleaning of tank with white synthetic enamel paint on black ground “Cleaned on (date)”, height of words 100 mm, complete all as specified and directed
Supply and fixing in repairs PTMT ball valves, suitable for 20 mm bore iron pipe, (weight not less than 210 grams), ISI marked, high pressure, with high density plastic ball, with epoxy coated aluminium rod, complete all as specified and directed.
Supply and Fix in repairs PVC tank lid 450 mm dia made of powder coated 2 mm thick mild steel sheet with 8 mm dia bolt and nuts Flat Iron strips to be provided to keep the the tank Lid tight as a protection as per sample with AGE (I) Highgound suitable for 500/1000 Litres capacity complete all as specified and directed.
Material and Labour Writing of letters or figures by paint (Block,Roman,Italic or Indian n.exc 30 cm in height on plastered/concrete painted surface complete all as specified and directed.
Material and labour for writing of stops, commas, short lines, dashes, hyphens, brackets etc on plastered/concrete painted surface complete all as specified and directed.
Supply only liquid water proofing compound to mix with cement mortar etc complete all as specified and directed.
Note: The total amount shall subject to adjustment of credit of Rs 5050.00 for old Materials as per Schedule of Credit
M/S V K Construction Co
SAMYAL ASSOCIATES
jmv engineers
Babu Ram Sud and Sons
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .