| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC M M I G B 96 RAMGANGA VIHAR PHASE 2 MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | ₹8.2 L | L1 | Accepted-AOC accepted |
| 2 | L2₹8.7 LRejected-AOC | ₹8.7 L | L2 | Rejected-AOC rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical ALL TECHNICAL DOCUMENT NOT COMPLETE |
| Sl No | Description | Qty | Unit | MAHENDRA SINGH L1 | ashraf contractor L2 |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Dismantling damaged Brick work or Masonry in Lime or Cement i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete. | 16.59 | M³ | 390 ₹6,470.10 | 400 ₹6,636 |
| 1.02 | Dismantling damaged C.C. work i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete. | 41.25 | M³ | 295 ₹12,168.75 | 300 ₹12,375 |
| 1.03 | Earth work in excavation in foundation in dry soil i/c. lift upto 1.50M and lead upto 30M i/c. cost of all material, labour, T&P etc. completion. | 171.76 | M³ | 132 ₹22,672.32 | 140 ₹24,046.40 |
| 1.04 | C.C(1:3:6) work including cost of all material, labour, T&P etc. complete. | 23.21 | M³ | 4,500 ₹1.0 L | 4,800 ₹1.1 L |
| 1.05 | M-105 & above brick work in 1:4 C.M. with course sand including cost of all material, labour, T&P etc. complete. | 53.87 | M³ | 5,100 ₹2.7 L | 5,304 ₹2.9 L |
| 1.06 | Providing and laying M-105 & above brick work with 1:4 cement mortar using cement and Coarse sand but excluding cost of bricks inclduing cost of all materials, labour, T&P, collection, cleaning & stacking of bricks etc. | 3.32 | M³ | 2,499 ₹8,296.68 | 2,600 ₹8,632 |
| 1.07 | Struck deep cement pointing in 1:2 C:M including cost of all material, labour, T&P etc. complete. | 157.29 | M² | 158 ₹24,851.82 | 160 ₹25,166.40 |
| 1.08 | M-105 & above brick flooring in 1:3 C:M with 150mm thick CC bed (1:2:4) including cost of all material, labour, T&P etc. complete. | 165 | M² | 2,052 ₹3.4 L | 2,120 ₹3.5 L |
| 1.09 | Earth work in filling for strengthening of bank with lift up to 1.5 M and lead up to 1.00 Km distance power transport including ramming , dressing and manual compaction etc. complete. | 178.28 | M³ | 162 ₹28,881.36 | 270 ₹48,135.60 |
Tender Value
₹8.7 L
EMD Value
₹18,000
Closing Date
13 Nov 2025, 4:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT 28 Repair of pitching and flooring work at Km 7.600 of Roshanpur Dy. In distt. Moradabad for the Year 2025-26
2025_UPIDC_1086669_57
04/EEAID/2025-26
Open Tender
Civil Works
60 days
MORADABAD
AS PER NIT
2 documents required · 2 mandatory
₹266
₹18,000
17 Jan 2026
8 Nov 2025
13 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling damaged Brick work or Masonry in Lime or Cement i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete.
Dismantling damaged C.C. work i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete.
Earth work in excavation in foundation in dry soil i/c. lift upto 1.50M and lead upto 30M i/c. cost of all material, labour, T&P etc. completion.
C.C(1:3:6) work including cost of all material, labour, T&P etc. complete.
M-105 & above brick work in 1:4 C.M. with course sand including cost of all material, labour, T&P etc. complete.
Providing and laying M-105 & above brick work with 1:4 cement mortar using cement and Coarse sand but excluding cost of bricks inclduing cost of all materials, labour, T&P, collection, cleaning & stacking of bricks etc.
Struck deep cement pointing in 1:2 C:M including cost of all material, labour, T&P etc. complete.
M-105 & above brick flooring in 1:3 C:M with 150mm thick CC bed (1:2:4) including cost of all material, labour, T&P etc. complete.
Earth work in filling for strengthening of bank with lift up to 1.5 M and lead up to 1.00 Km distance power transport including ramming , dressing and manual compaction etc. complete.
ashraf contractor (BID ID -5663641)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1999310.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid