| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.7 LAccepted-AOC | ₹12.7 L Quoted ₹10.7 L | L-1 | Accepted-AOC ACCEPTED BEING L1 BIDDER AND ACCEPTABLE RATE. |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT OPENED FOR TECHNICAL EVALUATION SINCE NOT BEING L1 BIDDER. HENCE REJECTED. |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT OPENED FOR TECHNICAL EVALUATION SINCE NOT BEING L1 BIDDER. HENCE REJECTED. |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT OPENED FOR TECHNICAL EVALUATION SINCE NOT BEING L1 BIDDER. HENCE REJECTED. |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT OPENED FOR TECHNICAL EVALUATION SINCE NOT BEING L1 BIDDER. HENCE REJECTED. |
Tender Value
₹25.5 L
EMD Value
₹32,000
Closing Date
17 Dec 2022, 5:00 pmClosed
STAFF OFFICER (CIVIL), HASDEO AREA, SECL
OFFICE OF THE STAFF OFFICER (CIVIL), HASDEO AREA, GM OFFICE, SOUTH JHAGRAKHAND COLLIERY, DISTT.- MANENDRAGARH-CHIRMIRI-BHARATPUR (C.G.) - 497 448. NAME AND MOBILE NUMBER OF CONTACT PERSON SHRI R.A. VERMA, 7587390121 (Phone), 7771243056 (Landline)
Repair and Maintenance of damaged boundary wall of Kurja Mine under Kurja Sub Area.
2022_SECL_263970_1
GM/HSD/C/e-Tender/22-23/43 Date 01.12.2022
Open Tender
Civil Works - Others
Item Rate
120 days
KURJA SUB AREA OF HASDEO AREA DISTT.-ANUPPUR(M.P.)
Please refer Tender Documents.
3 documents required · 3 mandatory
₹32,000
8 Apr 2023
2 Dec 2022
19 Dec 2022
3 Dec 2022
17 Dec 2022
3 Dec 2022
3 Dec 2022 - 9 Dec 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Brick work with fly ash bricks of size (230 mm x 110 mm x 75 mm) in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade : New work (three or more coats)
Colour washing such as green, blue & buff an even shades. Old work (One or more coats) with a base coat of white washing with lime.
Total impact of GST for the purpose of CTC
AMBE CONSTRUCTION
UTPAL BHATTACHARYA
VIJAY CHANDRA TRIPATHI
ANOOP KUMAR SINGH
M/s SHREE ENGINEERING
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_273028.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .