| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | -35.59% | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 L+₹26,635.75 (6.97%)Admitted-Finance NA | PALWAL | HARYANA | 121004 | -31.10% | ₹4.1 L+₹26,635.75 (6.97%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 L+₹74,746.20 (19.6%)Admitted-Finance | -22.99% | ₹4.6 L+₹74,746.20 (19.6%) | L3 | Admitted-Finance |
| 4 | L4₹4.9 L+₹1.1 L (29.4%)Admitted-Finance | -16.66% | ₹4.9 L+₹1.1 L (29.4%) | L4 | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹11,864
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer Irrigation Division Kathua
Irrigation Division Kathua
Improvement of B.P canal in between Rd 0-3400m and khuls fed by BP canal by way of Pitching grouting Walling section Crate works. L 129M
2026_IFC_318584_4
eNIT No. 08 of 07/2026-27
Open Tender
Civil Works
Percentage
30 days
Kathua
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer
₹11,864
14 Sept 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 38.9 | Cum | 187.3 | ₹7,285.97 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 54.81 | Cum | 5,733.6 | ₹3,14,258.62 |
| 3 | Dumping stone excluding cost of stones
in Horizontal on level | 23.49 | Cum | 237.9 | ₹5,588.27 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases upto five level including curing but excluding the cost of Centring , shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) . | 2.16 | Cum | 9,821.85 | ₹21,215.2 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 259.2 | Kg | 123.2 | ₹31,933.44 |
| 6 | Centering and shuttering including strutting and removal of form for foundations, footings, bases of columns etc. for mass concrete | 332.64 | Sqm | 286.35 | ₹95,251.46 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 7.2 | Sqm | 718.2 | ₹5,171.04 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls | 13.2 | M | 262.2 | ₹3,461.04 |
| 9 | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 coarse sand) . | 213.6 | Sqm | 283.8 | ₹60,619.68 |
| 10 | Supply of Stone boulder (nallah) nominal size 225 mm
(Stack measurements reduced by 15%) | 23.49 | Cum | 700 | ₹16,443 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_1050787.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .