| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹19.2 L−₹79,468.94 (3.98%)Accepted-Finance | H4 | Accepted-Finance QUOTED LOWEST RATE | |
| 2 | H1₹20.0 LRejected-Finance 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | H1 | Rejected-Finance H1 | |
| 3 | H2₹19.9 L−₹639.16 (0.03%)Rejected-Finance 1103 ARUNAACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | DELHI | 110001 | H2 | Rejected-Finance H2 | |
| 4 | H3₹19.8 L−₹11,302.31 (0.57%)Rejected-Finance 109 IIND FLOOR MADANGIR VILLAGE NEW DELHI 110 062 | SOUTH | DELHI | 110062 | H3 | Rejected-Finance H3 | |
| 5 | Rejected-Technical | - | Rejected-Technical TECHNICALLY NOT FIT |
Tender Value
₹22.1 L
EMD Value
₹1.1 L
Closing Date
4 Apr 2022, 3:00 pmClosed
SUPERINTENDING ARCHAEOLOGIST MEERUT CIRCLE
OFFICE OF THE SA ASI MEERUT CIRCLE
EXECUTION UNDER THE WORK OF RAISING THE WESTERN SIDE BOUNDARY WALL WITH GRILL FENCING AT HASTINAPUR
2022_ASI_680423_1
06/73/2021-22/SR/CONS
Open Tender
Civil Works
Works
60 days
HASTINAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
SA ASI MEERUT CIRCLE
₹1.1 L
Yes
12 Apr 2022
24 Mar 2022
5 Apr 2022
24 Mar 2022
4 Apr 2022
24 Mar 2022
Job Work
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead
Dismantling old brick tile masonary for holes of fixing of Iron railing including disposal of rubbish to the dumping ground within 50 metres lead.
Provision for MS grill panel 1.80 m length and 1.80 m height having MS angle Iron frame size ( 50mmx50mmx6mm) with 16 mm square bar 10 cm c/c spacing including all etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :2:4 (1 Cement : 2 coarse sand (zoneIII) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in superstructure above plinth level up to floor V level in cement mortar 1:6 (1 cement : 6 coarse sand).
Provision for casual Beldar for shifting of material from store to site where work is executed and Also for watch and ward duties during night hours .
Provision for skilled supervisior for day to day proper supervision of work
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Pointing on tile brick work with Cement mortar 1:3 (1 Cement : 3 fine sand): Flush/ Ruled/ Struck or weathered pointing
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.
sovereign enterprise
SINGH BROTHERS
POOJA CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .