Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹40,498.53 (38.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.6 L+₹55,203.88 (51.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.6 L+₹56,837.80 (53.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.0 L+₹97,931.08 (91.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹4,905
Closing Date
23 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
COMMUNITY SOAK PIT AT KADAPORA BLOCK ACHABAL
2026_RDPR_325101_38
ENIT109of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,905
28 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
23 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches (not exceeding 1.5 m in width as well as 10 Sqm. in plan) including dressing of slides and ramming of bottoms, lift up to 1.50 m and disposal lead upto 1.5m. All kinds of Soil. | 20.39 | Cum | 576.45 | ₹11,751.51 |
| 2 | Extea for add. Lift of 1.5 m | 9.16 | Cum | 89.75 | ₹821.75 |
| 3 | P/Fixing of cement concrete rings (0.84 m dia & 0.15 m ht.) incl. all leads,lifts & carriages,complete | 40 | NO | 400 | ₹16,000 |
| 4 | P/L of stone soling laid in dry by hand packedincluding all leads lifts carriage complete | 11.1 | Cum | 1,000 | ₹11,097 |
| 5 | P/L of sp.grade of c.conc in 1:1.5:3 mix excluding cost of reinforancement using 20 mm of crushed st. agg. | 1.15 | Cum | 9,821.85 | ₹11,324.59 |
| 6 | Reinforcement for RCC work i/c straiteining ,cutting ,bending ,placing in position of MS bars | 112.47 | kgs | 92.85 | ₹10,442.47 |
| 7 | P/L of sp.grade of c.conc in 1:3:6 mix excluding cost of reinforancement using 20 mm of crushed st. agg. | 0.18 | Cum | 5,733.6 | ₹1,032.05 |
| 8 | Half Brick work with common burnt clay F.P.S. (non-modualar) bricks of class designation 75 in foundation and plinth including superstructure above plinth level upto floor V level in Cement mortar 1: 4 (1 cement: 4 sand).I/c all carriages /head load up to the site of work complete | 9.46 | Sqm | 947.25 | ₹8,957.2 |
| 9 | Applying 15mm Cement plaster of 1: 4 (1 cement: 4 fine sand) mix. | 8.4 | Sqm | 327.85 | ₹2,753.94 |
| 10 | P/fixing of PVC Door Tee, Bend ,Collar etc of 110 mm dia of app.quality (B-type) | 20 | NO | 400 | ₹8,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1097563.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .