Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹21.6 L Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad | Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad | L1 | |
| 2 | L2₹23.6 L+₹2.0 L (9.38%) Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad | Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad | L2 | |
| 3 | L3₹24.7 L+₹3.1 L (14.4%) Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad | Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad | L3 | |
| 4 | - | - |
| Sl No | Description | Qty | Unit | M/S SKS PROJECTS L3 | STANDARD AIR CONDITIONING AND REFRIGERATION ENGINEERS L2 | NLR Constructions L1 |
|---|---|---|---|---|---|---|
| 1 | SITC of Water Cooler cum Purifier | - | - | 6.5 ₹24,67,114.04 | 1.8 ₹23,58,236.7 | -6.93 ₹21,56,002.85 Lowest |
Tender Value
₹23.2 L
EMD Value
₹46,331
Closing Date
9 Sept 2024, 3:00 pmClosed
EE(E)-II
Executive Engineer
39-27-41/1, Madhavadhara
Construction of Cluster of Buildings consisting of 1 School of Economics 2 School of Mathematics and Statistics 3 Extension to School of Social Sciences including Central Seminar Hall Building on EPC basis Civl works including IWS IS Sewerage systems Drainage and Development of Site, internal roads storm water drains External water supply lines UG Sump Septic Tank Rain Water Harvesting etc and IEI and fans fire fighting and fire alarm Central call bell system lightening Conductors VRF AC system Street lighting SITC of lifts pump sets and Horticulture works at Hyderabad Central University Hyderabad Sub head Supply Installation Testing and Commissioning of Water Cooler cum Purifier for Drinking purpose in Cluster Buildings at HCU Campus Gachibowli Hyderabad
86635
42/EE(E)-II-Hyd/2024-25
OPEN
Electrical Works
NCB
30 days
Hyderabad, Telangana
8 documents required · 8 mandatory
₹46,331
Not Applicable
9 Sept 2024
28 Aug 2024
9 Sept 2024
9 Sept 2024
31 Aug 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT42.pdf
document • 1.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .