Loading…
Loading…
Tender Value
₹43.6 L
EMD Value
₹87,200
Closing Date
17 Sept 2026, 6:00 pm2d left
Jitender Singh IDSE
GE (N) Bathinda
PROVISION OF AIR DUCT COOLING SYSTEM UNDER AGE EM-V OF GE(NORTH) BATHINDA AT BATHINDA MIL STN
2026_MES_786612_1
8941/NIT-38/26-27/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Bathinda
Class D Category c (i)
8 documents required · 8 mandatory
₹500
GE (North) Bathinda
₹87,200
Yes
17 Sept 2026
27 Aug 2026
19 Sept 2026
27 Aug 2026
17 Sept 2026
3 Sept 2026
27 Aug 2026 - 29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing and commissioning (SITC) of Arctic Air Cooler with Electrical Panel, comprising a 100% fresh air evaporative air cooling unit with three-side air intake through 10-micron air filters. The unit shall be fitted with Eco-Cool pads/antibacterial proprietary cellulose cooling pads (RoHS certified), centrifugal DIDW fan blower (AMCA Certified, Singapore), IE-2 efficiency squirrel cage induction motor (single phase/three phase as applicable) complete with pulley and belt drive arrangement, water circulation pump for spray through perforated distribution channel, metallic water tank with float valve, CPVC piping, and all other necessary accessories. The work shall include supply, installation, electrical panel, interconnecting wiring, testing, commissioning, and all necessary accessories required for satisfactory operation.
The complete unit shall conform to the latest ASHRAE standards and shall have the following minimum specifications:
(i) Air Flow Capacity: 10,000 CFM
(ii) External Static Pressure (ESP): 30 mmWG
(iii) Model: ADC-38K
(iv)Pre-filter: 10-micron washable pre-filter
Make: DRI-ARCTIC or equivalent approved
Location: P-3 & P-6 Rooms and Line-1 & Line-2, First & Second Floor Areas (6 Rooms and 12 Lines), complete in all respects, as specified and directed by the Engineer-in-Charge. | 4 | Each | - | - |
| 2 | Supply, Installation, Testing and Commissioning (SITC) of Arctic Air Cooler with Electrical Panel, comprising 100% fresh air evaporative air cooling unit, with three-side air intake through 10-micron air filters and air passing through Eco-Cool pads/antibacterial proprietary cellulose cooling pads (RoHS Certified). The unit shall be complete with centrifugal DIDW fan blower (AMCA Certified, Singapore), IE-2 standard squirrel cage induction motor (single phase/three phase as applicable) with pulley and belt drive arrangement, water circulation pump for spray through perforated distribution channel, metallic water tank with float valve, CPVC piping, electrical panel, and all other necessary accessories. The work shall include supply, installation, testing, commissioning, electrical connections, and all accessories required for satisfactory operation.
The complete unit shall conform to the latest ASHRAE standards and shall have the following minimum specifications:
Air Flow Capacity: 10,000 CFM
External Static Pressure (ESP): 30 mmWG
Model: ADC-45K
Pre-filter: 10-micron washable pre-filter
Make: DRI-ARCTIC or equivalent approved
Location: P-4 & P-7 Rooms and Line-1 & Line-2, First & Second Floor Areas (6 Rooms and 12 Lines), complete in all respects, as specified and directed by the Engineer-in-Charge. | 2 | Each | - | - |
| 3 | Supply, installation, and testing of site/factory-fabricated GSS rectangular ducting, complete with turning vanes, splitter vanes, gaskets, screws, nuts, bolts, jointing couplings, flanges, supports, hangers, sealant, and all other necessary accessories required for proper installation. The ducting shall be fabricated, erected, and tested in accordance with the approved drawings, relevant IS/SMACNA standards, and project specifications. The work shall be complete in all respects, as specified and directed by the Engineer-in-Charge. | - | - | - | - |
| 4 | (a) Item Ser No 03 - 24G GSS | - | Square Metre | - | - |
| 5 | (b) Item Ser No 03 - 22G GSS | 350 | Square Metre | - | - |
| 6 | Supply, installation, testing, and commissioning of 9 mm thick closed-cell nitrile rubber insulation (Class 'O'), complete with suitable adhesive for fixing. All joints shall be properly sealed with 50 mm wide self-adhesive nitrile rubber insulation tape to ensure a continuous vapour barrier. The insulation shall be applied strictly in accordance with the manufacturer's recommendations and project specifications. The work shall be complete in all respects, as specified and directed by the Engineer-in-Charge. | 400 | Square Metre | - | - |
| 7 | Supply, installation, testing, and commissioning of extruded aluminium powder-coated double-louvre continuous adjustable grilles, complete with MS volume control damper (VCD), fixing arrangements, fasteners, and all necessary accessories. The grilles shall be installed as per the approved drawings and project specifications to ensure proper air distribution and control. The work shall be complete in all respects, as specified and directed by the Engineer-in-Charge. | 8 | Square Metre | - | - |
| 8 | Supply, installation, testing, and commissioning of GI duct volume control damper (VCD), fabricated from galvanized iron (GI) sheet of suitable gauge, complete with damper blades, operating spindle, locking quadrant, bearings, linkages, fixing hardware, and all necessary accessories. The damper shall be installed in the GI ducting system as per the approved drawings and project specifications to regulate airflow. The work shall be complete in all respects, as specified and directed by the | 3 | Square Metre | - | - |
| 9 | Supply, fabrication, erection, and fixing of ducting supports, including MS braces, frames, support members, extension hangers, channels, angles, threaded rods, clamps, fasteners, anchor bolts, nuts, washers, anti-vibration pads (where required), and all other necessary accessories for proper support of the ducting system. The supports shall be fabricated, erected, and fixed in accordance with the approved drawings, relevant standards, and project specifications. The work shall be complete in all respects, as specified and directed by the Engineer-in-Charge. | 600 | Kilogram | - | - |
| 10 | Supply, installation, testing, and commissioning of flexible canvas duct connections, made of heavy-duty fire-retardant canvas, complete with GI clamping strips, nuts, bolts, fasteners, sealant, and all necessary fixing accessories. The canvas connections shall be provided between the air handling/cooling unit and ducting to isolate vibration and prevent transmission of noise. The work shall be complete in all respects, as specified and directed by the Engineer-in-Charge. | 6 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
tenderdocuments0238.pdf
Tender Documents • 0.85 MB
BOQ_881507.xls
BOQ • 0.46 MB
tenderdocuments0138.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .