| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | -0.05% | ₹6.1 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 LAdmitted-Finance | +1.00% | ₹6.2 L | L2 | Admitted-Finance |
| 3 | L3₹6.3 LAdmitted-Finance | +2.00% | ₹6.3 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,130
Closing Date
5 Mar 2026, 5:30 pmClosed
Sarpanch GP Motewadi
GP Motewadi
Etender/FFC/GPM/11/2025-26
2026_SOLAP_1282597_1
Etender/FFC/GPM/11/2025-26
Open Tender
Civil Works
90 days
Etender/FFC/GPM/11/2025-26
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,130
Yes
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
A) Providing Water Supply Scheme (Z.P.School) At Motewadi(M) Tal -Malshiras Providing structural steel work in rolled sections like joists, channels, angles, tees, etc. as per detailed design and drawings or as directed by engineer in charge including fixing in position without connecting plates,braces, etc..and one coat of anticorrosive paint and over it two coats of oil painting, of approved quality and shade,etc.complete.
Providing and placing poly ethelene storage tanks including all local and central taxes, octroi, transportation to stores, etc. complete as directed by Engineer- In - Incharge.
Providing,lowering, laying and jointing ISI mark G.I. pipe of following class and diameter including all local and central taxes, octroi, inspection charges, transportation to stores, etc. complete
Providing and fixing 20 mm dia screw down bib / stop tap of brass including necessory socket union nut-etc. complete
Add GST
B) Constructing Of Solid Waste Management (Kachara Kundi) At Motewadi(M) Tal -Malshiras Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable foreither collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspec- tion charges, transport to departmental stores, unloading and stacking etc. complete
Add GST
C) Providing & Constructing Functional House Tap Connection At Motewadi(M) Tal -Malshiras Providing and making UPVC/MDPE pipe consumer service connection on Distribution main by drilling hole with suitable means , including all labour , UPVC/MDPE Pipe of required length with or without Road crossing as described below, including cost of specials like Saddle/Clamp Saddle of suitable material, and diameter suitable for Distribution main, 15mm /20mm/25mm respective Dia Heavy duty Ferrule , Male and Female thread adapter Elbow, Bends,couplers ,Tees, Clamps of suitable material and sundry materials as per requirment, including providing and fixing medium duty 15.mm brass bib tap,GI casing pipe of suitable diameter of 32mm/ 40mm/ 50mm respectively of required length for Road crossing, including requird labour for excavation in all types of strata up to the depth of 0.75m all types of strata up to the depth of 0.75m or as per site requirement,all types of or as per site requirement,all types of plumbing fittings, refilling , Closing the water supply in that area, dewatering, hydraulic testing and restarting the water supply complete as directed by Engineer in,transportation of material etc. (Without Road Crossing) For 15 mm Service Connection
Add GST
D) Providing Pipeline At Motewadi (Wadiwasti) Tal. Malshiras Excavation for foundation/pipe trenches in earth, soils, of all types ,sand, gravel, and soft murum, including removing the excavated material up to a distance of 50 m and lift as below stacking and spreading. as directed ,normal dewatering, preparing the bed for foundation and Excluding back filling etc.complete
Excavation for foundation/pipe trenches in Hard Murum including removing the excavated material up to a distance of 50 m and lifts as below ,stacking and spreading as directed by Engineer-In-Charge, normal dewatering ,preparing the bed for foundation and excluding back filling, etc.complete.
Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below ,Stacking as directed by Engineer-In-Charge normal dewatering , preparing the bed for foundation and excluding back filling, etc. Complete
Filling in Plinth and floor murum bedding in Trenches with approved murum for excavated material from foundation 15 cm to 20 cm Layer including watering ,ramming and compaction etc complete
Providing and Supplying in Standard Length of ISI Mark rigid Unplasticsed PVC pipes for potable water with solvent cement joints including cost of couplers as per IS specification no.4985/1988 including all local and central taxes, transportation ,foreign charges ,inspection loading, unloading, conveyance to the departmental store/site and stacking the same enclosed shed duly protected from sun rays and rains including cost of jointing material. i.e. solvent cement , etc.complete 75 mm Dia.4 Kg/cm2.
Lowering, laying and jointing PVC pipes and special of following class and diameter including cost of conveyance from stores to site of work including cost of all labour ,material, except cement solvent ,rubber ring, giving satisfactory hydraulics testing as per IS code etc.complete (with cement solvent joint/ring fit joint) 75 mm Dia.4 Kg/cm2.
Providing and Supplying ISI mark CI D/F Sluice Valve with jointing to pipe work (including all hardware and packing ),water quality having non-rising spindle with hand wheel and without bypass arrangement ,Spindle of stainless steel as per requirement excluding CC foundation /Structure steel support (1) up to 300 mm Dia conforming to IS 780(2) Above 300 mm Dia confirming to IS 2906 A - Sluice Valve with PN-1/Butterfly Valve without bypass 100 mm Sluice Valve
65 mm Sluice Valve
Laying and jointing in Position following CI D/F sluice Valve ,Butterfly Valves and reflux Valves including cost of all labour, jointing material, including nut bolts and giving satisfactory hydraulic testing ,etc.complete 100 mm Sluice Valve
65 mm Sluice Valve
Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation ,surcharging ,etc.complete
Add GST
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_2205935.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid