Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC L1 is quoted less than tender value | |
| 2 | L2₹8.5 L+₹10,630.91 (1.26%)Rejected-AOC | L2 | Rejected-AOC L2 is quoted greater than tender value |
| Sl No | Description | Qty | Unit | JV TRADERS L2 | C.Gopinath L1 |
|---|---|---|---|---|---|
| 1.00Vellore District Construction of Compound wall at AD Colony Burial Ground in Karkoor Panchayat in Pernambut Block Iyothee Thass Pandithar Scheme 2025-26 Package No 06 | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B. | 58.45 | Cum | 258.3 ₹15,097.64 | 246 ₹14,378.7 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick etc Complete. | 6.92 | Cum | 5,188.6 ₹35,905.11 | 5,169 ₹35,769.48 Lowest |
| 4.00 | Supplying & Erecting (Below GL) | 56.33 | Cum | 529.3 ₹29,815.47 | 516 ₹29,066.28 Lowest |
| 5.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross etc | 42.78 | Sqm | 1,046.3 ₹44,760.71 | 1,032 ₹44,148.96 Lowest |
| 6.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works. | 1.21 | MT | 89,976 ₹1,08,870.96 Lowest | 89,976 ₹1,08,870.96 Lowest |
| 7.00 | Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges etc | 17 | Cum | 8,977.15 ₹1,52,611.55 Lowest | 8,977.15 ₹1,52,611.55 Lowest |
| 8.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications | 29.09 | Cum | 5,941.61 ₹1,72,841.43 Lowest | 5,941.61 ₹1,72,841.43 Lowest |
| 9.00 | Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete | 295.38 | Sqm | 278.85 ₹82,366.71 | 268.85 ₹79,412.91 Lowest |
| 10.00 | Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification. | 295.38 | Sqm | 261.5 ₹77,241.87 | 248.5 ₹73,401.93 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,100
Closing Date
1 Jul 2025, 3:00 pmClosed
The Block Developement Office Anaicut
The Block Developement Office Anaicut
Vellore District Construction of Compound wall at AD Colony Burial Ground in Karkoor Panchayat in Pernambut Block Iyothee Thass Pandithar Scheme 2025-26 Package No 06
2025_RDTN_570738_1
B3/1191/2025 PBT JUN 12-25
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office Anaicut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,100
25 Aug 2025
18 Jun 2025
1 Jul 2025
18 Jun 2025
1 Jul 2025
18 Jun 2025
Amount
Vellore District Construction of Compound wall at AD Colony Burial Ground in Karkoor Panchayat in Pernambut Block Iyothee Thass Pandithar Scheme 2025-26 Package No 06
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick etc Complete.
Supplying & Erecting (Below GL)
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross etc
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works.
Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges etc
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Name board charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
JV TRADERS (BID ID -1384603)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_681837.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .