Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC Qualified | |
| 2 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC Qualified | |
| 3 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC Qualified | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
26 Aug 2020, 12:00 pmClosed
CHIEF OFFICER KBMC, BADLAPUR EAST
KULGAON BADLAPUR MUNICIPAL COUNCIL
Providing Detailed Servey Plan and Demarcation of Road/ Land on site one Yearly Tender Basis for Year 2020-21
2020_DMA_603135_1
KBMC/PWD/6532/5-Recall-19/8 /20-21
Open Tender
Civil Works
Item Rate
BADLAPUR
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Online Payment
₹20,000
23 Dec 2020
20 Aug 2020
27 Aug 2020
20 Aug 2020
26 Aug 2020
20 Aug 2020
Amount
Part (A)- Providing detailed servey of land with help of land servey department including all nessesary equipment, precporarment of drawng,plan sections of sketch/ drawing, plant with appropriate authority including all necessary Charges of land servey department and taxes ( mojani) in municipal limit
(A) Land (Upto - 1000 sqm)
1- Normal (sidhi)
2- Urgent (Tatadi)
3- Most Urgent (aati- Tatadi)
(B)- Property (Upto - 2000 sqm)
1- Normal (sidhi)
2- Urgent (Tatadi)
3- Most Urgent (aati- Tatadi)
Providing detailed layout plan of area in scale 1:500 including carrying out contour survey and detailed Engineering plane table Survey with the help of 24 Alidade. The dolomite area measurement of the plot and structures, trees, over head line and under ground service amenities within the area, with triangular method and giving detailes of the structures, such as total area, type of building and distance from all corners taking trial pit 0.5x0.5x2.00 m.-2Nos. per acre and collection of record from city survey / D.I.L.R. authorities and authentication. The plan shall be traced on 75 micron polyster film and shall be submitted along with three Amonia prints. The contour levels shall be marked at 0.5 Meter intervals. Note:- The items includes- 1)Traversing work with theodolite and steel tape. 2) Levelling Grid Work of the terrain. 3)Detailed Engineering Survey and contouring work of the terrain. 4)Plotting work. 5)Collection of Record. a) up to 1 Acre
Providing detailed layout plan of area in scale 1:500 including carrying out contour survey and detailed Engineering plane table Survey with the help of 24' Alidade. The dolomite area measurement of the plot and structures, trees, over head line and under ground service amenities within the area, with triagular method and giving detailes of the structures, such as total area, type of building and distance from+B27 all corners taking trial pit 0.5x0.5x2.00 m.-2Nos. per acre and collection of record from city survey / D.I.L.R. authorities and authentication. The plan shall be traced on 75 micron polyster film and shall be submitted along with three Amonia prints. The contour levels shall be marked at 0.5 Meter intervals. Note:- The items includes- 1)Traversing work with theodolite and steel tape. 2)Levelling Grid Work of the terrain. 3)Detailed Engineering Survey and contouring work of the terrain. 4)Plotting work. 5)Collection of Record. b) Above 1 Acre
Contour Survey of stream U/S and D/S of proposed bridge site including levelling at every 30 X 30 m preparing contour map with Autocad prints etc.complete in 5 sets.
Demarcation of right of way (ROW) as per design using total station including calculation of co-ordinates of 30 Meter interval on both sides of road.
Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps , area calculation, preparation of proposal, printing,binding, etc. complete and submission of 5 sets more ever liasoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. For new alignment.
Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW ,taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line , encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD.Plain Terrain New Alignment
Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW ,taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line , encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. Plain Terrain Existing Alignment.
Demarcation of Road boundry (ROW) including fixing the boundry stones of standard size and shape including fixing in block of standard size of C.C. of 1:4:8 white washing at 30 M interval on both sides
Part (B)- Preparation of detail Traffic survey using total station as per appropriate authority including all nessesary equipments, Classification of data as per vehicle category as required with the help of soft ware and submitting the the reports to the concerned department in hardcopies as well as in soft copy, including using necessary technical manpower etc. complete.
Traffic Survey
Preparation of Project report
Technical Sanctions
Devlopment of chouck as per directives of Town Planning department.
Survey & Preparation of Project report Detailed drawings
Approved by town planning department & Technical Sanctions
Supervision
SHRI KOKESHWARI ASSOCIATES
NISARG SURVEYORS AND DEVELOPERS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .