Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.0 LAccepted-AOC VILL KHOTTADIH PO BILPAHARI P S BARDHAMAN 713378 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹69.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹70.5 L+₹1.5 L (2.18%)Rejected-Finance NEW MAJRI COLLIERY DAFAI NO1 POST SHIVJI NAGAR TAH BHADRAWATI DIST CHANDRAPUR 442503 | BHADRAWATI | CHANDRAPUR | MAHARASHTRA | 442503 | ₹70.5 L+₹1.5 L (2.18%) | L2 | Rejected-Finance L2 |
| 3 | L3₹72.3 L+₹3.3 L (4.77%)Rejected-Finance | ₹72.3 L+₹3.3 L (4.77%) | L3 | Rejected-Finance L3 |
| 4 | L4₹75.2 L+₹6.1 L (8.86%)Rejected-Finance | ₹75.2 L+₹6.1 L (8.86%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | MD. KALIM L3 | ANKIT KUMAR MISHRA L4 | ALKAMAR KHAN L1 | MD. HALIM L2 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Twelve (12) nos. Sectionalisation Stoppings for LHCM in R-IV bottom seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||||
| 1.01 | Recess cutting in soft stone by hand | 60.48 | Cubic meter | 4,689.19 ₹2,83,602.21 | 4,872.18 ₹2,94,669.45 | 4,751.4 ₹2,87,364.67 | 4,572 ₹2,76,514.56 Lowest |
| 1.02 | Side cutting in coal by hand | 67.2 | Cubic meter | 1,661.99 ₹1,11,685.73 | 1,726.84 ₹1,16,043.65 | 4,751 ₹3,19,267.2 | 1,626 ₹1,09,267.2 Lowest |
| 1.03 | P.B. Work(1:8) by c.b bricks | 342.72 | Cubic meter | 7,023.9 ₹24,07,231.01 | 7,298.01 ₹25,01,173.99 | 6,852 ₹23,48,317.44 | 6,851 ₹23,47,974.72 Lowest |
| 1.04 | Plastering (1:6) in both sides | 714.08 | Square Meter | 387.69 ₹2,76,841.68 | 402.81 ₹2,87,638.56 | 378 ₹2,69,922.24 Lowest | 378 ₹2,69,922.24 Lowest |
| 1.05 | Loading and unloading materials from Surface to U.G | 1,396 | Tubs | 741.78 ₹10,35,524.88 | 770.73 ₹10,75,939.08 | 723 ₹10,09,308 | 722 ₹10,07,912 Lowest |
| 1.06 | Mechanically transport in Tub (1500m above) | 698 | Tubs | 936.84 ₹6,53,914.32 | 973.4 ₹6,79,433.2 | 913 ₹6,37,274 | 910 ₹6,35,180 Lowest |
| 1.07 | Manually pushing in Tub(250m-300m) | 698 | Tubs | 618.41 ₹4,31,650.18 | 642.55 ₹4,48,499.9 | 603 ₹4,20,894 Lowest | 610 ₹4,25,780 |
| 1.08 | Lead for carrying Materials at a distance of (315 m) | 698 | Tubs | 1,331.4 ₹9,29,317.2 | 1,383.36 ₹9,65,585.28 | 800 ₹5,58,400 Lowest | 1,298 ₹9,06,004 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹70.6 L
EMD Value
₹88,300
Closing Date
28 Feb 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of Twelve (12) nos. Sectionalisation Stoppings for LHCM in R-IV bottom seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_353026_1
GM/PND/Sur/Ten/25-26/196/393 Dated 12.02.2026
Open Tender
Civil Works - Others
Item Rate
90 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹88,300
31 Mar 2026
13 Feb 2026
2 Mar 2026
13 Feb 2026
28 Feb 2026
13 Feb 2026
13 Feb 2026 - 21 Feb 2026
Construction of Twelve (12) nos. Sectionalisation Stoppings for LHCM in R-IV bottom seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Recess cutting in soft stone by hand
Side cutting in coal by hand
P.B. Work(1:8) by c.b bricks
Plastering (1:6) in both sides
Loading and unloading materials from Surface to U.G
Mechanically transport in Tub (1500m above)
Manually pushing in Tub(250m-300m)
Lead for carrying Materials at a distance of (315 m)
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_365819.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .