Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) Saidpur DPS, (2) Rampur DPS, (3) Saidpur STP DPS and (4) R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 )
125145
01/Mech/PC/2026-27, Gr04
Open Tender
MECHANICAL
Patna
• Company Name
• Address
• Contact Number & E-mail
• Registration Detail
MECHANICAL
ITEM RATE
L1
1
13 documents required · 13 mandatory
₹17,700
Processing Fee: 3540
₹5.4 L
Chief General Manager, BUIDCO, Patna
25 May 2026
15 Feb 2026
17 Mar 2026
15 Feb 2026
16 Mar 2026
15 Feb 2026
23 Feb 2026
NIT No.-01/Mech/PC/2026-27 Gr04
Name of Work:-Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) Saidpur DPS, (2) Rampur DPS, (3) Saidpur STP DPS and (4) R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 )
Estimated Cost (Rs.) Rs. 2,68,02,142.00
Earnest Money (Rs.) Rs. 5,36,100.00
Time of initial inspection & testing of thorough repaired all machineries. 30th May 2026
Cost of BOQ (Rs.) Rs.17,700.00
To be filled by the Bidder
1 Name of the Contractor/Bidder
2 Address of the Contractor/Bidder
Gr-04 (1) Name of Work:- Annual Repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of SAIDPUR DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27.( From 01st April 2026 to 31st March 2027 )
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Repairing and servicing of Pump no-1- 125 HP C/F 3 phase, 440 volts, 50 hz .Annexture-1 1 Job 0.00 0.00
2 Repairing and servicing of Pump no-2- 240 HP CF 3 phase, 440 volts, 50 hz.Annexture-2 1 Job 0.00 0.00
3 Repairing and servicing of Pump no-3, 4 & 5 - 3 x 270 HP CF 3 phase, 440 volts, 50 hz .Annexture-3 1 Job 0.00 0.00
4 Repairing and servicing of Vaccum pump- 5 x 10 HP C?F 3 phase, 440 volts, 50 hz .Annexture-4 1 Job 0.00 0.00
5 Repairing and servicing of Pump- 2 x 315 HP non clog submersible pump set 3 phase, 440 volts, 50 hz .Annexture-5 1 Job 0.00 0.00
6 Repairing and servicing of 375 HP diesel engine .Annexture-6 1 Job 0.00 0.00
7 Repairing and servicing of Pump- 375 HP diesel C/F pump Annexture-7 1 Job 0.00 0.00
8 Repairing and servicing of 198 HP diesel engine .Annexture-8 1 Job 0.00 0.00
9 Repairing and servicing of Pump- 198 (D) HP CF pump Annexture-9 1 Job 0.00 0.00
10 Repairing and servicing of Tranformer- 5 x 500 KVA 3 phase, 440 volts, 50 hz. Annexture-10 1 Job 0.00 0.00
11 Repairing and servicing of Soft starter - 1x 125 HP, 1 x240 HP, 3 x 270 HP C/F pump set & 2 x 315 HP Submersible pump set 3 phase, 440 volts, 50 hz.Annexture-11 1 Job 0.00 0.00
12 Desilting of sump . Annexture 12 1 Job 0.00 0.00
13 Operation , maintenance & other miscllanious work of the electro-machineries . Annexture 13 1 Job 0.00 0.00
14 Deployment of 4 nos. x 3 shifts road sweepers per day during the monsoon period 1st june to 15th oct. and before monsoon (01st April 2026 to 31st May 2026) & after monsoon 2x2 shift up to 31 st march 2027 for removing floating materials from sump, cleaning the premises, taking out the garbages from pump impeller and miscellaneous work .:- 2556 shift 2556 shift 0.00
15 Deployment of 4 nos. x 3 shifts pump operator per day during the monsoon period from 1st june to 15th oct. before monsoon (01st April 2026 to 31st May 2026) & 2x3 shift up to 31 st march-2027 the operation of pumps.:- 3012 shift 3012 shift 0.00
Estimated cost for year 2026-27 Total Rs. 0.00
Name of Work : Annual ,repairing of 125 HP C/F pump set no. 1 of storm drainage pumping plant Saidpur .
Sl. Particulars Quantity Rate Amount
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 125 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place and reinstallation of motor on base, doing coupling of motor with pump and after repair of pump . 1 job 0.00
2 Cost for opening and dismantling 125 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, spacer sleeve, bearing cover, etc, and cleaning all inner components for ready for repair and reassembaling of pump after repair. 1 job 0.00
3 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
4 Cost for supply and fitting of bronze bush of pump of size 102 mm OD x 90 mm ID x 152 mm long 2 nos. 0.00
5 Cost for supplying and fitting of spherical roller ball bearing SKF 22320 E of driving end including 5% fitting charge, CP 10% & 1% labour cess. 1 nos. 0.00
6 Cost for supplying and fitting of angular contact ball bearing SKF 7317 BECBJ of DE including 5% fitting charge, CP10% , & 1% labour cess. 1 no. 0.00
7 Cost for rubber insertion 1/8” thick. 10 kg 0.00
8 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
9 Cost for making, supplying and fitting impeller lock screw made of SS 316 with full thread with washer. 1 Set 0.00
10 Cost for supplying and fitting lock nut for bearing with washer. 1 no 0.00
11 Cost for fitting consumable materials such as grease 10 kg, gland packing 5/8”- 10 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
12 Cost for reassembling of pump shaft, its accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
13 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
14 Cost for supplying and fitting bolts and nuts of different sizes with washer. 6 Kg 0.00
15 Deduct : Cost of Scrap materials Stainless steel 4 Kg 0.00
Name of work - Annual, repairing and servicing of 240 HP CF pump no. -2 of storm drainage pumping plant of Saidpur .
Sl. Particulars Quantity Rate Amount
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 240 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place and reinstallation of motor on base, doing coupling of motor with pump and after repair of pump 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 240 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, spacer sleeve, bearing cover, etc, and cleaning all inner components for ready for repair. 1 job 0.00
4 Cost for streightening of S.S.412 pump shaft on hydraulic press machine. 1 job 0.00
5 Cost for supply and fitting of bronze bush of shaft of size 108 mm ID x 128 mm OD x 250 mm long 1 job 0.00
6 Cost for supplying and fitting of ball bearing SKF 7220 BECBM for DE including 5% fitting charge, 10% CP, & 1% labour cess. 2 no. 0.00
7 Cost for supplying and fitting of ball bearing SKF 23122 CC/W33 for NDE including 5% fitting charge, 10% CP, & 1% labour cess. 1 no. 0.00
8 Cost for repairing of worn out portion of impeller of the pump by welding with S. S. electrodes and turning, finishing to the accurate size of the impeller. 1 job 0.00
9 Cost for rubber insertion 1/8” thick. 15 kg 0.00
10 Cost for supplying and fitting lock nut for bearing. 1 no. 0.00
11 Cost for supplying and fitting SS lock washer. 1 no. 0.00
12 Cost for making, supplying and fitting SS 410 stainless steel impeller locking bolt of size 1” dia x 10” long of impeller. 1 no. 0.00
13 Cost for making, supplying and fitting SS 410 stainless steel impeller lock washer of impeller. 1 no. 0.00
14 Cost for fitting consumable materials such as grease 2 kg, gland packing 5/8”- 2 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
15 Cost for reassembling of pump accessories such as shaft, impeller, locking bolt, locking nuts, grease shiels of DE & NDE, bearing cover, shaft sleeve, spacer sleeve and bearing into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
16 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
17 Cost for transportation of pump and its accessories from Saidpur pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 800 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
18 Cost for supplying and fitting bolts and nuts of different sizes with spring & plane washer. 6 Kg 0.00
19 Deduct : Cost of Scrap materials bronze. 5 kg 0.00
Name of work - Annual repairing and servicing of 270 HP CF pump no.-3,4 & 5 of storm drainage pumping plant of Saidpur .
Sl. Particulars Quantity Rate Amount
1 Cost for providing labour, tools & tackles at site for opening all coupling bolts of 270 HP CF motor & pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base & stacking the motor at proper place and reinstallation of motor on base, doing coupling of motor with pump and after repair of pump 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly) and same work for reassembaling after repair. 1 job 0.00
3 Cost for opening and dismantling 270 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, spacer sleeve, bearing cover, etc, and cleaning all inner components for ready for repair. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine and checking the streightness on lathe machine. 1 job 0.00
5 Cost for supply and fitting of bronze shaft bush of size 100 mm ID x 114 mm OD x 300 mm long 1 job 0.00
6 Cost for supplying and fitting of ball bearing SKF NU 222 ECM of NDE including 5% fitting charge, 10% CP, & 1% labour cess. 1 no. 0.00
7 Cost for supplying and fitting of angular contact ball bearing FAG 3320 M of DE including 5% fitting charge, 10% CP, & 1% labour cess. 1 no. 0.00
8 Cost for repairing of worn out portion of impeller of the pump by welding with S.S. electrodes and turning, finishing to the accurate size of the impeller. 1 job 0.00
9 Cost for rubber insertion 1/8” thick. 15 kg 0.00
10 Cost for making steel key for impeller & coupling pulley. 2 nos 0.00
11 Cost for supplying and fitting lock nut &ss lock washer for bearing. 1 no. 0.00
12 Cost for making, supplying and fitting SS 410 stainless steel impeller locking bolt of size 1” dia x 10” long of impeller and impeller lock washer. 1 no. 0.00
13 Cost for fitting consumable materials such as grease 10 kg, gland packing 5/8”- 10 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
14 Cost for transportation of pump and its accessories from Saidpur pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 800 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
15 Cost for supplying and fitting heavy duty bolts and nuts of different sizes with spring & plane washer. 10 Kg 0.00
16 Deduct : Cost of Scrap materials bronze. 5.5 kg 0.00
17 Deduct : Cost of Scrap materials Stainless steel 5 Kg 0.00
Threfore total cost of 3 x 270 HP C/F pump = 0.00
Name of work - Annual, repairing and servicing of 5 x 10 HP vacuum pump of storm drainage pumping plant Saidpur .
sl Particulars Quantity Rate Amount
1 Cost for providing all labour, tools and tackles at site for opening electrical connection of 10 HP vacuum pump motor, foundation bolts and nuts of pump, GI flange and taking out and removing it from base. 5 jobs 0.00
2 Cost for dismantling of 10 HP vacuum pump for taking out impeller, pump shaft, etc and cleaning all the components for ready for repair. 5 jobs 0.00
3 Cost for repairing of steel shaft by remetalling on cut point, turning and polishing of the shaft and making key way groove. 5 jobs. 0.00
4 Cost for repairing GM impeller by brazing the blades of impeller with brass, turning, polishing and facing the blade to bring it to running condition 5 jobs 0.00
5 Cost for making supplying and fitting GM bush as per sample. 10 nos. 0.00
6 Cost for supplying and fitting ball bearing no. 6307- 2RS1of SKF with 5% fitting charge, 10% CP, & 1% labour cess. 10 nos. 0.00
7 Cost for supplying and fitting oil seal as per sample. 10 nos. 0.00
8 Cost for fitting materials such as packing paper, grease, gland packing, nuts and bolts, cotton waste etc required at the time of fitting of pump. 5 jobs 0.00
9 Cost for repairing of body (brass discs) by facing both the sides. 5 nos. 0.00
10 Cost for supplying and fitting split type GM gland flange. 5 nos. 0.00
11 Cost for reassembling of pump with shaft, impeller, bearing set, oil seal, etc accessories in work shop. 5 jobs 0.00
12 Cost for transportation of pump from Saidpur Pump house to work shop and back to pump house. 5 jobs 0.00
14 Cost for providing all labour, tools and tackles for reinstallation of motor and pump on base and doing electrical connections and testing all complete. 5 jobs 0.00
15 Cost for supplying and fitting motor pump 3" dia. coupling pulley and making hole in coupling pulley as per dia. of pump & motor shaft and making key way groove with key and star type rubber bush all complete job for 2 nos. vacuum pump. 3 set 0.00
16 Cost for cutting and removing burnt cable sockets and doing copper cable socketing of 4 mm² x 3 core copper cable of both motor and starter. 15 nos. 0.00
17 Cost for making hole as per dia. of pump & motor shaft and making key way groove in the coupling on lathe machine and fitting & fixing in the pump & motor. 6 Jobs 0.00
18 Deduct : Cost of Scrap materials Gun metal 4 Kg 0.00
Name Of Work :- Annual repair, operation & maintenance of 2 x 315 HP non clog submersible pump set Storm Drainage Pumping Station, Saidpur .
SI.No. Description Of Work Qty Rate (RS.) Amount (RS.)
1 Complete repairing and overhauling of 315 HP non clog submersible pump by taking out submersible motor pump set, opening and dismentling of 315 HP sub. Motor pump assembly and taking out impeller from motor pump assembly supplying and fitting bearing heating and varnishing of stator, 'O' rings, copper cable socket, cable entry kit, rubber gasket, lip seal, spring washer, mechanical lock, seal, mobile, greese, nut & bolt, bearing,repairing of pump, transportation etc. with deducting the taken out scrap materials, and reassembling, installation & testing on full load at site. Work & quantity may vary. 2 job 0.00
Name of Work : - Repairing and servicing of 375 HP diesel engine of strom drainage water at DPS Saidpur.
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools, tackles and an experienced mechanic at site for servicing of 375 HP diesel engine of Kirloskar make by checking of fuel pump, oil pump, decarbonisation of engine cylinder head and testing of engine on unload and load, etc. all complete. 1 job. 0.00
2 Cost for supplying and fitting/filling following :-
(i) Air filter 1 no. 0.00
(ii) Diesel filter 1 set 0.00
(iii) Lubricating oil filter 2 no. 0.00
(iv) Mobile 40 lit 0.00
(v) Set of hoises 1 set 0.00
(vi) Set of flexibles 1 set 0.00
(vii) Fuel off solenoid switch 12V DC for fuel pump 1 no. 0.00
(viii) Relay in electrical panel 2 no. 0.00
(ix) Set of sealings 1 set 0.00
(x) Rocker cover joints 3 no. 0.00
(xi) Coolant 50 ltr 0.00
3 Cost for Adjust/Replace(if necessary) V belt condition and tension, Thermostat element,valve clearance, fasteners, exhaust silencer including all labour, tools and tackles. 1 job. 0.00
4 Cost for Radiator cleaning and repairing of radiator fines externally, radiator tube internally, including all labour, tools and tackles. 1 job. 0.00
5 Supply, installation and testing of new battery 150 AH if required capacity to operate the engine and deducting the cost of old battery as per direction of E/I. 2 job. 0.00
6 S/F battery cable and terminal etc as required. 2 no. 0.00
7 S/F battery terminal wire of length 2 mtr. etc as required. 4 no. 0.00
8 Complete overhauling and refitting of self starter by changing the bearing,carbon brush,bushes, nut bolt,washer etc as required during overhauling. with all required materials . 1 Job. 0.00
9 Repairing, overhauling and refitting of alternator with changing its burnt armature,carbon brush,bearings, bushes etc as required. 1 Job. 0.00
Total Cost 0.00
Name of Work : - Repairing and servicing of 375 HP(D) CF pump of strom drainage water at DPS Saidpur.
Sl. Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 375 HP CF pump and all the electrical connections of motor and opening all bolts and nuts of pump casing, bearing houshing and taking out of bearing houshing together with impeller coupling and pump shaft. 1 job 0.00
2 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from fondation on including all labour, tools & tackles etc. 1 job 0.00
3 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 job 0.00
4 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 100 mm ID x 122 mm OD x 220 mm length 1 no. 0.00
5 Cost for supply and fitting of S-cylindrical Roller bearing no. SKF 3220 A or equivalent for 375 HP pump with GST,CP & labour cess etc 2 nos 0.00
6 Cost for supply and fitting of Spherical Roller bearing no. SKF 3322 A equivalent for 375 HP pump with GST,CP & labour cess etc 1 nos 0.00
7 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 Set 0.00
8 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 job 0.00
9 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 job 0.00
10 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 Set 0.00
11 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
12 Cost for supplying all labours, tools & tackles at site for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
13 providing all labours, tools, tackles for installation of 375 HP C/F pump on foundation,refitting nut-bolt & testing on unload. 1 job. 0.00
14 Cost for supplying and fitting bolts and nuts of different sizes with washer including labours, tools & tackles. 10 Kg 0.00
15 Cost for supplying and fitting SS coupling bolt as per size and sample including labours, tools & tackles. 10 nos 0.00
16 Deduct : Cost of Scrap materials Stainless steel 2 Kg 0.00
Total Cost 0.00
Name of Work : - Annual repairing and servicing of 198 HP diesel engine of strom drainage water at DPS Saidpur.
Sl. No Particulars Quantity Rate Amount(Rs)
1 cost for providing all labours, tools ,tackels and an experienced mechanic at site for servicing of 198 HP diesel engine of kirloskar make by checking of fuel pump, oil pump, decarbonisation of engine cylinder head and testing of engine on unload and load etc all complete. 1 job. 0.00
2 Cost for supplying and fitting/filling following :-
(i) Air filter 1 no. 0.00
(ii) Diesel filter 1 set 0.00
(iii) Lubricating oil filter 2 no. 0.00
(iv) Mobile 60 lit 0.00
(v) Set of hoises 1 set 0.00
(vi) Set of flexibles 1 set 0.00
(vii) Fuel off solenoid switch 12V DC for fuel pump 1 no. 0.00
(viii) Relay in electrical panel 2 no. 0.00
(ix) Set of sealings 1 set 0.00
(x) Rocker cover joints 3 no. 0.00
(xi) Coolant 45 ltr 0.00
3 Cost for Adjust/Replace(if necessary) V belt condition and tension, Thermostat element,valve clearance, fasteners, exhaust silencer including all labour, tools and tackles. 1 job. 0.00
4 Cost for Radiator cleaning and repairing of radiator fines externally, radiator tube internally, including all labour, tools and tackles. 1 job. 0.00
5 Supply, installation and testing of new battery 150 AH if required capacity to operate the engine and deducting the cost of old battery as per direction of E/I. 2 job. 0.00
6 S/F battery cable and terminal etc as required. 2 no. 0.00
7 S/F battery terminal wire of length 2 mtr. etc as required. 4 no. 0.00
8 Complete overhauling and refitting of self starter by changing the bearing,carbon brush,bushes, nut bolt,washer etc as required during overhauling. with all required materials . 1 Job. 0.00
9 Repairing, overhauling and refitting of alternator with changing its burnt armature,carbon brush,bearings, bushes etc as required. 1 Job. 0.00
Total Cost 0.00
Name of work - Repairing and servicing of 198 (D) HP CF pump at Saidpur DPS .
Sl. Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 198 HP CF pump and all the electrical connections of motor and opening all bolts and nuts of pump casing, bearing houshing and taking out of bearing houshing together with impeller coupling and pump shaft. 1 job 0.00
2 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from fondation on including all labour, tools & tackles etc. 1 job 0.00
3 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 job 0.00
4 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 88 mm ID x 112 mm OD x 200 mm length 1 no. 0.00
5 Cost for supply and fitting of S-cylindrical Roller bearing no. SKF 3219 A or equivalent for 198 HP pump with GST,CP & labour cess etc 2 nos 0.00
6 Cost for supply and fitting of Spherical Roller bearing no. SKF 3314 A equivalent for 198 HP pump with GST,CP & labour cess etc 1 nos 0.00
7 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 Set 0.00
8 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 job 0.00
9 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 job 0.00
10 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 Set 0.00
11 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
12 Cost for supplying all labours, tools & tackles at site for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
13 providing all labours, tools, tackles for installation of 198 HP C/F pump on foundation,refitting nut-bolt & testing on unload. 1 job. 0.00
14 Cost for supplying and fitting bolts and nuts of different sizes with washer including labours, tools & tackles. 10 Kg 0.00
15 Cost for supplying and fitting SS coupling bolt as per size and sample including labours, tools & tackles. 10 nos 0.00
16 Deduct : Cost of Scrap materials Stainless steel 2 Kg 0.00
Total Cost 0.00
Name of work - Annual repairing and servicing of transformer of 5 x 500 KVA transformer and servicing, cleaning, greasing, repairing of AB switch & DP structure of 11 KV electric sub - station Saidpur DPS .
Sl. Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of 500 KVA transformer, loading and unloading the transformer on transportation vehicle by using hydraulic crane including the hire cost and reinstallation, commissioning after repairing at DPS 1 jobs. 0.00
2 Cost for opening the top cover and dismentling the same for taking out HT and LT coils from transformer body after draining out transformer oil and stacking in a container, taking out sludge of transformer oil and cleaning inside of transformer body and radiator fins by blowing pressurised oil. 1 jobs. 0.00
3 Cost for providing all labours and tools and taking out HT and LT coil from transformer body by using chain pulley block 1 jobs. 0.00
4 Cost for supplying and fitting following :-
(i) LT stud of copper 3 nos. 0.00
(ii) LT bush 3 nos. 0.00
(iii) HT stud of copper 3 nos. 0.00
(iv) HT bush 3 nos. 0.00
(v) Rubberized gasket 1 nos. 0.00
5 Cost for supplying and filling of tranformer oil. 60 ltrs. 0.00
6 cost for transformer oil filtration 370 ltrs. 0.00
7 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 3 nos. 0.00
8 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 jobs. 0.00
9 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 1 jobs. 0.00
10 Cost for supplying & fitting following spares. :-
i. Post insulator. 2 Pcs 0.00
ii. Horn gap fuse. ( 1 pcs = 3 nos.) 2 Pcs 0.00
iii. Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Pcs 0.00
iv. Copper wire 6 SWG. 2 kg 0.00
v. GI bolts & nuts with washer of different sizes 1.5 kg 0.00
vi. Knife type male & female contact for 400 Amp. AB switch. ( 1 Pcs = 3 nos) 1 Pcs 0.00
vii Lightening arrestor for 11 KV sub station 1 Pcs 0.00
viii Rabit conductor for connection of main ncoming feeder. 5 M 0.00
ix Fuse wire 19 no. 0.5 Kg 0.00
11 Cost for PVC sleeving suitable to withstand 11 KV power supply for sleeving of 6 SWG jumpher wire 5 Mtr. 0.00
12 Deduct : Cost of Scrap materials Copper 2 kg 0.00
Total Cost 0.00
Therefore cost for 5 (five) nos 0f 500 KVA Transformer 5 nos. 0.00 0.00
Name of Work : Repairing and servicing for starter of 1x 125 HP, 1 x240 HP, 3 x 270 HP C/F pump set & 2 x 315 HP Submersible pump set and cable of storm drainage pumping plant Saidpur .
Sl. Particulars Quantity Rate Amount
1 Repairing and servicing of Soft starter suitable for operation non clog of 315 HP submersible pumps with (a) incomer consisting of 1000 Amp. TP 50 kA breaking capacity ACB- 1 no. LED indicator (RYB)-1 set, 3 phase digital volt meter-1 no., LED frequency meter-1 no., 3 phase digital ampere meter-1 no., CT coil 1000/5- 1 set, ON/OFF Trip indicator (GRY)- 1 set, MCB SP- 2 Amp.-7 nos, APFC panel (7% reactor)-225 KVAR (b) TP 50 kA 800 Amp. MCCB-1 no., terminal speader -1 set, rotory handle-1no., VAF+PF meter-1 no., CT coil-800/5- 1set, 3 pole power Controller-650 Amp-2 nos., LED indicator (RYB)-3 set, Soft Starter 700 Amp.- 1 set., ON/OFF Trip indicator (GRY)- 1 set, ON/OFF Push Button-1 set copper panel wiring etc. as required in a 5'x9'x3' size panel board. Materials and quantity may vary. 2 job 0.00
2 Soft starter suitable for operation of 240 HP C/F pump with (a) incomer consisting of 1000 Amp. TP 50 kA breaking capacity ACB- 1 no. LED indicator (RYB)-1 set, 3 phase digital volt meter-1 no., LED frequency meter-1 no., 3 phase digital ampere meter-1 no., CT coil 1000/5- 1 set, ON/OFF Trip indicator (GRY)- 1 set, MCB SP- 2 Amp.-7 nos, APFC panel (7% reactor)-200 KVAR (b) TP 50 kA 630 Amp. MCCB-1 no., terminal speader -1 set, rotory handle-1no., VAF+PF meter-1 no., CT coil-800/5- 1set, 3 pole power Controller-650 Amp-2 nos., LED indicator (RYB)-3 set, Semi conductor fuse base- 6 nos, fuse-6 nos Soft Starter 700 Amp.- 1 set., ON/OFF Trip indicator (GRY)- 1 set, ON/OFF Push Button-1 set copper panel wiring etc. as required in a 5'x9'x3' size panel board. Spares & quantity may vary. 1 job 0.00
3 Providing & Bus Duct cabling of 240 mm²x3½ core PVC insulated and PVC sheathed Aluminium conductor cable in double from transformer to Panel boards in pump house ISI marked. (If required) 50 mts 0.00
4 Providing & Bus Duct cabling of 120 mm²x3 core PVC insulated and PVC sheathed copper conductor flexible cable in double from starter to motor & laying in trench/ cable tray in pump house. ISI marked.(If required) 50 job 0.00
5 Repairing and servicing of Soft starter suitable for operation of 270 HP C/F pumps with (a) incomer consisting of 1000 Amp. TP 50 kA breaking capacity ACB- 1 no. LED indicator (RYB)-1 set, 3 phase digital volt meter-1 no., LED frequency meter-1 no., 3 phase digital ampere meter-1 no., CT coil 1000/5- 1 set, ON/OFF Trip indicator (GRY)- 1 set, MCB SP- 2 Amp.-7 nos, APFC panel (7% reactor)-225 KVAR (b) TP 50 kA 800 Amp. MCCB-1 no., terminal speader -1 set, rotory handle-1no., VAF+PF meter-1 no., CT coil-800/5- 1set, 3 pole power Controller-650 Amp-2 nos., LED indicator (RYB)-3 set, Soft Starter 700 Amp.- 1 set., ON/OFF Trip indicator (GRY)- 1 set, ON/OFF Push Button-1 set copper panel wiring etc. as required in a 5'x9'x3' size panel board. Materials and quantity may vary. 3 job 0.00
6 Repairing and sevicing of Soft starter suitable for operation of 125 HP C/F pump with (a) incomer consisting of 600 Amp. TP 50 kA breaking capacity MCCB- 1 no. LED indicator (RYB)-1 set, 3 phase digital volt meter-1 no., LED frequency meter-1 no., 3 phase digital ampere meter-1 no., CT coil 1000/5- 1 set, ON/OFF Trip indicator (GRY)- 1 set, MCB SP- 2 Amp.-7 nos, APFC panel (7% reactor)-100 KVAR (b) TP 50 kA 400 Amp. MCCB-1 no., terminal speader -1 set, rotory handle-1no., VAF+PF meter-1 no., CT coil-800/5- 1set, 3 pole power Controller-650 Amp-2 nos., LED indicator (RYB)-3 set, Semi conductor fuse base- 6 nos, fuse-6 nos Soft Starter 400 Amp.- 1 set., ON/OFF Trip indicator (GRY)- 1 set, ON/OFF Push Button-1 set copper panel wiring etc. as required in a 4'x8'x3' size panel board. Quantity may vary. 1 job 0.00
7 Miscellaneous work for proper lighting in pump house, sump, inlet & outlet side, etc. at Saidpur DPS. 1 job 0.00
Name of work - Cleaning and desilting of sump, bye pass gate, approach channel, outlet channel etc of Saidpur Drainage pumping stations under Mechanical works division, Buidco .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Labour Analysis for desilting
Labour required = 1.2 labour per cum
2 Cost for supplying all labours, tools and suitable tackles for cleaning and desiliting of filled and choked sewage tank, approach channel and inlet chamber etc of saidpur drainege pumping station and to lift and disposal of all soils up to a lead of 50 mtr all complete as per specification and direction of E/I at site. (i) Sump - 22 m x 3.7 m x 2 m (avg) 162.8 m³ 0.00
3 Cost for providing all labours, tools and tackles at site for repairing, removing rust,dust, scale, smokes etc. from old surface and spray painting two or more coats with anticorrosive bituminous paint of approved brand of two MS gate and channel . 1 job 0.00
4 Cost for providing all labours, tools, tackles & a 10 H.P. electric pump set for dewatering the area within band including cost of hire of electric pump set . SOR RCD PM6 1001. Basic rate-195/Hr. 30 Hr 0.00
Name of work - Annual operatin & maintenance of electro mechanical equipment of Saidpur Drainage pumping stations under Mechanical works division, Buidco .
Sl. No Particulars Quantity Rate Amount (Rs)
4 Annual, Operation & maintenance of the electro-machineries for monsoon period and after the bidder shall be totally responsible for the operation of minor and major work of DPS i.e burning of motor, transformer, panel, starter, bearing, Shaft replacing, lighting , CCTV camera with internet and any other fault etc. no further claim will be paid by Buidco.. 1 job 0.00
5 Spray painting of all electro mechanical equipment and pipe line over one coat of red primer complrte job. 1 job 0.00
6 supply & installation of 600 mm dia butterfly valve for 375 HP diesel engine. 1 job 0.00
Gr-04 (2) Name of Work- Annual repairing,overhauling,servicing ,operation & maintenance of all electromechanical equipments of Storm Drainage Pumping Station RAMPUR under Bankipur Anchal, Works Division, BUIDCo, Patna for the monsoon year 2026-27 ( From 01st April 2026 to 31st March 2027 )
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Repairing and servicing of pump no-1-125 HP C/F 3 phase, 440 volts, 50 HZ , Annexure-1 1 Job 0.00 0.00
2 Repairing and servicing of Pump no-2- 100 HP CF 3 phase, 440 volts, 50 HZ Annexure-2 1 Job 0.00 0.00
3 Repairing and servicing of 2x10 HP vacuum pump. Annexure-3 1 Job 0.00 0.00
4 Repairing and servicing of Pump no. 3-30 HP sub pump set. Annexure 4 1 Job 0.00 0.00
5 Repairing and servicing of Pump no 4-150 HP sub pump set. Annexure 5 1 Job 0.00 0.00
6 Repairing and servicing of 38 HP diesel engine set . Annexure-6 1 Job 0.00 0.00
7 Repairing and servicing of Transformer. Annexure-7 1 Job 0.00 0.00
8 Repairing and servicing of Panel and starter. Annexure-8 1 Job 0.00 0.00
9 Desilting of sump. Annexure-9 1 Job 0.00 0.00
10 Deployment of 3 nos. x 3 shifts road sweepers per day during the monsoon period 1st june to 15 st oct. and before monsoon (01st April 2026 to 31st May 2026) & 1x2 shift up to 31 st march 2027for removing floating materials from sump, cleaning the premises, taking out the garbages from pump impeller and miscellaneous work . 1689 Job 0.00
11 Deployment of 2 nos. x 3 shifts pump operator per day during the monsoon period from 1st june to 15 st oct. and before monsoon (01st April 2026 to 31st May 2026) & 1x3 shift up to 31 st march 2027 for the operation of pumps. 1506 Job 0.00
12 Operation , maintenance & other works of the electro-machineries for period (01.04.26 to 31.03.27) and the bidder shall be totally responsible for the operation of minor and major work of DPS i.e burning of motor, transformer, panel, starter, bearing, Shaft replacing, cable , CCTV camera with internet and any other fault etc. no further claim will be paid by Buidco. 1 Job 0.00
13 Cost for miscellaneous work such as changing pipe line of vaccum pumplight, wiring, switch , switch board , medical kit, and other works in PMC strom water pumping plant Rampur.. 1 Job 0.00
Estimated cost for year 2026-27 Total Rs. 0.00
Name of work - Annual repairing and servicing of 125 HP CF pump no. - 3 of PMC storm drainage pumping plant of Rampur .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 125 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place with GST, CP & Labour Cess. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly) with GST, CP & Labour Cess. 1 job 0.00
3 Cost for opening and dismantling 125 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, spacer sleeve, bearing cover, etc, and cleaning all inner components for ready for repair with GST, CP & Labour Cess. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine with GST, CP & Labour Cess. 1 job 0.00
5 Cost for supply and fitting of SS 410 pump shaft sleeve of size 102 mm OD x 90 mm ID x 152 mm long 1 no. 0.00
6 Cost for supplying and fitting of spherical roller ball bearing SKF 22320 E of driving end including fitting charge, CP & Labour Cess 2 nos. 0.00
7 Cost for supplying and fitting of roller ball bearing SKF NU222 ECJ or ECM of free end including fitting charge, CP & Labour Cess 1 no. 0.00
8 Cost for rubber insertion 1/8” thick. 8 kg 0.00
9 Cost for making, supplying and fitting impeller lock screw made of SS 316 with full thread with GST, CP & Labour Cess. 1 Set 0.00
10 Cost for making, supplying and fitting impeller lock washer made of SS 316 with full thread with GST, CP & Labour Cess. 1 Set 0.00
11 Cost for supplying and fitting lock nut for bearing with GST, CP & Labour Cess. 1 no 0.00
12 Cost for fitting consumable materials such as grease 3 kg, gland packing 5/8”- 3kg, cotton waste,- 5 kg packing paper, rubber water thrower etc as required at the time of fitting of pump with GST, CP & Labour Cess. 1 job. 0.00
13 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop with GST, CP & Labour Cess. 1 job. 0.00
14 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, and palcing of motor on base, doing coupling of motor with pump, checking and correcting alignment of motor pump and doing all electrical connection of motor & testing on no-load and full load.etc all complete with GST, CP & Labour Cess.(1 job x 2 days). 2 job. 0.00
15 Cost for transportation of pump and its accessories from Rampur pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 800 kg & work shall be undertaken by loading on Pick-up Van) with GST, CP & Labour Cess. 1 job. 0.00
16 Cost for supplying and fitting bolts and nuts of different sizes with washer. 7 Kg 0.00
17 Deduct : Cost of Scrap materials Stainless steel 6 Kg 0.00
Name of work - Annual repairing and servicing of 100 HP CF pump no. -1 of PMC storm drainage pumping plant, Rampur .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 100 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 100 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, bearing cover, etc, and cleaning all inner components for ready for repairing. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for supply and fitting of bronze bush of size ID 80 mm OD 95 mm Length 210 mm 1 job 0.00
6 Cost for supplying and fitting of rubber patta with bolts & nuts for 10" dia. Motor pump couplings. 1 set 0.00
7 Cost for supplying and fitting of ball bearing SKF 7317 BEC/BEP of DE including fitting charge , CP and labour cess. 2 nos 0.00
8 Cost for supplying and fitting of roller ball bearing FAG of NDE NU2219 ECJ/ECP including fitting charge , CP and labour cess . 1 no. 0.00
9 Cost for rubber insertion 1/8” thick. 10 kg 0.00
10 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
11 Cost for supplying and fitting SS316 lock nut for bearing as per sample. 1 no. 0.00
12 Cost for supplying and fitting SS316 lock washer. 1 no. 0.00
13 Cost for supplying and fitting nose type CI dom nut of nose type for impeller as per sample. 1 no. 0.00
14 Cost for fitting consumable materials such as grease 2 kg, gland packing 5/8”- 2 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
15 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
16 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, and palcing of motor on base, doing coupling of motor with pump, checking and correcting alignment of motor pump and doing all electrical connection of motor & testing on no-load and full load.etc all complete.(1 job x 2 days) 2 job. 0.00
17 Cost for transportation of pump and its accessories from R K Avenue pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 600 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer. 6 Kg 0.00
20 Deduct : Cost of Scrap materials bronze. 3 kg 0.00
21 Deduct : Cost of Scrap materials Stainless steel. 5 Kg 0.00
Name of work - Opening, dismantling , repairing and servicing of 2x10 HP vacuum pump of PMC storm drainage pumping plant Rampur of 1x125 HP, 1x100 HP C/F pump.
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing all labour, tools and tackles at site for opening electrical connection of 10 HP vacuum pump motor, foundation bolts and nuts of pump, GI flange and taking out and removing it from base. 2 jobs. 0.00
2 Cost for dismantling of 10 HP vacuum pump for taking out impeller, pump shaft, etc and cleaning all the components for ready for repair. 2 jobs. 0.00
3 Cost for repairing of steel shaft by remetalling on cut point, turning and polishing of the shaft and making key way groove. 2 jobs. 0.00
4 Cost for repairing GM impeller by brazing the blades of impeller with brass, turning, polishing and facing the blade to bring it to running condition. 2 jobs. 0.00
5 Cost for making supplying and fitting GM bush as per sample. 4 nos. 0.00
6 Cost for supplying and fitting ball bearing no. 6307 ZRS1 of SKF with fitting charge , CP & Labour cess . 4 nos. 0.00
7 Cost for supplying and fitting oil seal as per sample. 4 nos. 0.00
8 Cost for fitting materials such as packing paper, grease, gland packing, nuts and bolts, cotton waste etc required at the time of fitting of pump. 2 jobs. 0.00
9 Cost for repairing of body (brass discs) by facing both the sides. 2 nos. 0.00
10 Cost for supplying and fitting split type GM gland flange. 2 nos. 0.00
11 Cost for reassembling of pump with shaft, impeller, bearing set, oil seal, etc accessories in work shop. 2 jobs. 0.00
12 Cost for transportation of pump from Rampur Pump house to work shop and back to pump house. 2 jobs. 0.00
13 Cost for providing all labour, tools and tackles for reinstallation of motor and pump on base and doing electrical connections and testing all complete. 2 jobs. 0.00
14 Cost for cutting and removing burnt cable sockets and doing cable socketing of 4 mm² 3 core copper cable of both motor and starter. 12 nos. 0.00
15 Cost for providing & fitting of DOL starter suitable for operation of 10 HP electric motor. 1 no. 0.00
16 Deduct : Cost of Scrap materials Gun metal. 1 Kg 0.00
17 Deduct : Cost of Scrap materials Stainless steel. 3 Kg 0.00
Name of work - Repairing and servicing of non clog 30 HP submersible motor and pump set at PMC strom drainage pumping station Rampur before monsooon..
sl no Particulars Qty. Rate Amount (RS)
1 Cost for Providing all labours,tools and tackles at site for disconnecting the 30 HP submersible pump set and taking out form sump well. 1 Job 0.00
2 Cost for dismantaling of non clog Sub-mersible pump set,taking out rotor form stator of motor and taking out damaged bearing form rotor and cleaning with petrol and ready for repair work. 1 Job 0.00
3 Cost for supplying and fitting Angular contact ball bearing no. 3213A/C3. SKF make. 1 no. 0.00
4 Cost for supplying and fitting deep grooved ball bearing no. 6213 -2RS. Skf make. 1 no. 0.00
5 Cost for supplying and fitting copper cable socket. 5 nos. 0.00
6 Cost for supplying and fitting cable entry kit. 1 set 0.00
7 Cost for supplying and fitting joint rubber gasket. 1 no. 0.00
8 Cost for making, supplying and fitting mechanical lock . 1 set 0.00
9 Cost for supplying and fitting mechanical seal as per size and sample. 1 no. 0.00
10 Cost for supplying following with GST, CP and Labour cess.
(i) Mobil (super servo-10) hydraulic 7 ltrs 0.00
(ii) Servo bearing grease 2 Kgs 0.00
(iii) Nuts,bolts and key of different sizes. 1 set 0.00
11 Cost for fitting and bearing in rotor of motor assembling rotor in stator of motor complete set. 1 Job 0.00
12 Cost for supplying and fitting rubber insertion sheet of size 1/8'' thick(black). 3 Kgs 0.00
13 Cost for transportation of pump motor assembly form site to workshop for repair and back to pump house after repair including all cost of labour for loading and unloding. 1 Job 0.00
14 Cost for providing all labours,tools and tackles at site for lowering of motor pump assembly . Fitting and fixing of pump motor assembly to discharge pipe and testing on load. 1 Job 0.00
15 Cost for complete opening of 30 HP sub motor part by part & taken out of top & bottom bearing from bearing houshing and repairing of bearing houshing with weilding with C.I electrode, turning, and finishing as required shape and size. 1 job 0.00
16 Cost for supplying angular contact bearing 6219C3 of SKF Make, if required. SKF make. 1 job 0.00
17 Cost for greasing the bearing of motor and varnishing, heating & taping of enamelled copper winding wire including required materials like grease and varnish-6 lit.etc. 1 job 0.00
18 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place etc. 1 job 0.00
Name Of Work :- Annual repair, operation & maintenance of 150 HP non clog submersible pump set Storm Drainage Pumping Station, Rampur .
SI.No. Description Of Work Qty Rate (RS.) Amount (RS.)
1 Complete repairing and overhauling of 150 HP non clog submersible pump by taking out submersible motor pump set, opening and dismentling of Motor pump assembly and taking out impeller from motor pump assembly supplying and fitting bearing heating and varnishing of stator, 'O' rings, copper cable socket, cable entry kit, rubber gasket, lip seal, spring washer, mechanical lock, seal, mobile, greese, nut & bolt, bearing,repairing of pump, transportation etc. with deducting the taken out scrap materials, and reassembling, installation & testing on full load at site. Work & quantity may vary. 1 job 0.00
Name of work - Repairng and servicing of 38 HP diesel engine set of storm drainage pumping plant Rampur .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing all labours, tools, tackles and an experienced mechanic at site for servicing of 38 HP. Eicher make diesel engine by checking of fuel pump, oil pump, decarbonisation of engine cylinder head and testing of engine on unload and load etc. all complete with GST, CP & Labour Cess. 1 Job. 0.00
2 Cost for supplying and filling mobil with GST, CP & Labour Cess. 10 ltrs. 0.00
3 Cost for supplying and fitting following with GST, CP & Labour Cess. :-
(i) Mobil filter. 1 no. 0.00
(ii)Diesel filter. 2 no. 0.00
(iii) Air filter. 1 no. 0.00
(iv) V belt 1 set 0.00
(v) 6" dia cona flexiable delivery pipe. 15 mts 0.00
4 Cost for supply of 150 Ah capacity battery incuding deduction of the cost of old battery. 1 Job. 0.00
5 Cost for supply & fitting battery inverter 12 v, 400 VA with short circuit protection.. 1 no. 0.00
6 Cost for supplying and fitting battery terminal wires of length 2 mtr. Each. 2 no. 0.00
7 Cost for banzo bolts and washer with GST, CP & Labour Cess. 12 nos. 0.00
8 Cost for supplying and fitting battery cable and terminals with GST, CP & Labour Cess. 2 nos. 0.00
9 Cost for supplying all labour and tools for servicing and repairing of self starter of Diesel engine including changing of it's spares such as bearings, carbon brush, penion, bushes etc and testing on load at site with GST, CP & Labour Cess. 1 Job. 0.00
10 Cost for repair of alternator by changing it's burnt armature, carbon brush, bearings, bushes,etc as required and testing on load at site with GST, CP & Labour Cess. 1 Job. 0.00
Name of work - Annual servicing, repairing and overhauling of 11 KV AB Switch, 1 x 250 KVA & 1 x 400 KVA transformers , panel boards & starters of 1 x 100 & 1 x 125 HP CF pump sets of PMC storm drainage pumping plant, Rampur.
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing all labours, tools and tackles at site for opening all electrical connection of HT & LT of transformer mounted on D.P. structure and taking down the transformers from D.P. structure with GST, CP & Labour Cess. 2 jobs. 0.00
2 Cost for opening the top cover and other equalizing pipes of transformer for fitting and tightening of HT & LT studs and draining of transformer oil and stacking of transformer oil in container with GST, CP & Labour Cess. 2 jobs. 0.00
3 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 amp old and damaged AB switches . 2 jobs. 0.00
Cost for supplying & fitting following spares with GST, CP & Labour Cess. :-
i. Knife type male & female contact for 400 Amp. AB switch. ( 1 Set = 3 nos) 2 Set 0.00
ii. Horn gap fuse. ( 1 set = 3 nos.) 2 set 0.00
iii. Net fuse for 400 Amp. AB switch. (1 Set =3 nos.) 2 Set 0.00
iv. Copper wire 6 SWG. 5 kg 0.00
v. GI bolts & nuts with washer of different sizes 5 kg 0.00
4 Cost for supplying and fitting following with GST, CP & Labour Cess. :-
(i) LT stud of copper 6 nos. 0.00
(ii) LT bush 6 nos. 0.00
(iii) HT stud of copper 3 nos. 0.00
(iv) HT bush 3 nos. 0.00
(v) Rubberized gasket 2 nos. 0.00
(vi) Transformer oil 150 ltrs. 0.00
5 Cost for taking out the transformer oil by draining out and storing in drums for fitting of above spares by deploying all labour & tools. 2 jobs. 0.00
6 Cost for fitting & tightening of HT & LT studs, refilling of transformer oil and fitting of top cover with ruberised gasket and re-instaling equalizing pipes etc all complete work with GST, CP & Labour Cess. 2 jobs. 0.00
8 Cost for filtration of transformer oil.(250 KVA transformer contains 290 ltr & 400 KVA transformer contains 410 ltr of T. oil) with GST, CP & Labour Cess. 600 ltrs. 0.00
9 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc.with GST, CP & Labour Cess. 32 nos. 0.00
10 Cost for providing all labour & tools for doing all LT & HT connections of transformers and testing on load. 2 jobs. 0.00
11 Deduct : Cost of Scrap materials Copper 2 kg 0.00
Name of work - Annual repairing and servicing of starters of 1x125 HP , 1x100 HP CF pump sets , 30 HP and 150 HP submersible pump set of storm drainage pumping plant Rampur before monsoon.
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing all labours, tools and tackles at site for servicing LT distribution panel board decarbonisation of its all contact joints, bushes by washing with petrol doing proper insulation at cable terminals with requisite kinds of tapes and repair all internal wiring of 1 X 125 HP & 1 X 100 HP pump sets with GST, CP & Labour Cess. 2 jobs. 0.00
2 Cost for providing all labours, tools and tackles at site for opening and dismantalling all the contactors of fully automatic star-delta starter contactors of 100 HP & 125 HP pump sets washing all internal parts with petrol and cleaning and setting all accessories of starters, fitting of below mentioned spares, all complete job with GST, CP & Labour Cess. 2 jobs. 0.00
3 Cost for supplying and fitting the following spares for 125 HP & 100 HP starters with CP and labour cess .
(i) Cost for MNX110 contactor . 1 set 0.00
(ii)Cost for MNX95 contactor . 1 set 0.00
(iii) Cost for LCID95 contactor. 1 set 0.00
(iv) Cost for LCID80 contactor. 1 set 0.00
(v) Cost for timer(0-30) sec. 2 set 0.00
(vi) Cost for thermal over load relay (84-135) amp. 2 set 0.00
(vii) Cost for cutting out the burnt/damaged cable sockets, providing and fitting of new sockets of different sizes. 18 nos. 0.00
4 Cost for providing all labours, tools and tackles at site for opening and dismantalling all the contactors of fully automatic star-delta starter contactors of 30 HP Submersible pump sets washing all internal parts with petrol and cleaning and setting all accessories of starters, fitting of below mentioned spares, all complete job with GST, CP & Labour Cess. 1 jobs. 0.00
5 Cost for providing all labours, tools and tackles at site for opening and dismantalling all the contactors of soft starter for 150 HP Submersible pump sets washing all internal parts with petrol and cleaning and setting all accessories of starters, fitting of below mentioned spares, all complete job with GST, CP & Labour Cess. 1 jobs. 0.00
6 Cost for supplying and laying 3.5 x 120 mm² XLPE Aluminium armoured cable from transformer to panel ( If required). 50 mts 0.00
7 Deduct : Cost of Scrap materials Copper 2 kg 0.00
Name of work - Cleaning and desilting of sump, bye pass gate, approach channel, outlet channel etc of PMC Drainage pumping stations Rampur under Mechanical works division, Buidco , Patna before monsoon .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Labour Analysis for desilting
Labour required = 1.2 labour per cum
2 Cost for supplying all labours, tools and suitable tackles for cleaning and desiliting of filled and choked sewage tank, approach channel and inlet chamber etc of drainege pumping station and to lift and disposal of all soils up to a lead of 50 mtr all complete as per specification and direction of E/I at site. (i) Sump- 10 m x 2.9 m x 1.9 m = 55.10 m³ 55.10 m³ 0.00
3 Cost for providing all labours, tools, tackles & a 10 H.P. electric pump set for dewatering the area within band including cost of hire of electric pump set . SOR RCD PM6 1001. Basic rate-195/Hr. 24.00 Hr 0.00
4 Cost for providing all labours, tools and tackles at site for repairing, removing rust,dust, scale, smokes etc. from old surface and spray painting two or more coats with anticorrosive bituminous paint of approved brand of two MS gate and channel . 1 job 0.00
Gr-04 (3) Name of Work- Annual repairing,overhauling,servicing ,operation & maintenance of all electromechanical equipments of Storm Drainage Pumping Station SAIDPUE STP under Bankipur Anchal, Works Division, BUIDCo, Patna for the monsoon year 2026-27 ( From 01st April 2026 to 31st March 2027 )
SI.No. Description Of Work Qty Unit Rate (RS.) Amount (RS.)
1 Repairing and servicing of 60 HP Sub pump set no. (Annexure-I) 1 Job 0.00 0.00
2 Repairing and servicing of 60 HP Sub motor set no. (Annexure-2) 1 Job 0.00 0.00
3 Repairing and sevicing of 60 HP,75 HP, 100 Hp Starter & control panel (Annexure-3) 3 Job 0.00 0.00
4 Repairing and servicing of 75 HP CF pump set no. (Annexure-4) 1 Job 0.00 0.00
5 Repairing and servicing of 100 HP CF pump set no. (Annexure-5) 1 Job 0.00 0.00
6 Repairing & sevicing of 400 & 600 amp OCB (Annexue-6) 1 job 0.00 0.00
7 repairing and servicing of 1 x 500 & 400 KVA transformer . (Annexure-7) 2 Job 0.00 0.00
8 Desilting work of sump .Annexure-8 1 job 0.00 0.00
9 Supplying & laying of 3.5 core 11 KV grade XLPE insulated PVC insulated and PVC sheathead 240 mm² Aluminium conductor service cable from transformer to panel. 50 m 0.00
10 Cost for repairing and servicing with all labour,tools, & materials for complete opening & repairing of 300 mm dia. Sluice valve with making, supplying, & fitting of s.s spindle making square thread & check nut all complete. 1 Job 0.00
11 Cost for repairing and servicing with all labour,tools, & materials for complete opening & repairing of 300 mm dia. N.R valve ,C.I gate remetalling, turning, finishing as per required size & fitting with rubber sheet, spindle etc all complete. 3 Job 0.00
12 Supply & installation of Rubber mat of 11 KV grade ISI marked at panel room of standard size. 1 job 0.00
13 Complete the below mention mix work as per instruction of Engineer-In-Charge.
a Writing the nane details of officers & pump operator on the wall paint. 1 Job 0.00
b Providing log book & other required Register. 1 Job 0.00
c Providing & availability during monsoon period in sufficient qty required safety materials like first aid box kit, machinery work hand tool kit, electrical glooves, normal hand gloves, torch (02 no.), umbrella(02), safety jacket, gun boot, rain coat & other required as per instruction of Engineer-In-Charge. 1 Job 0.00
d Spray painting of all electro- mechanical equiepment, pipe line in M.S structure etc as required. 1 job 0.00
e Cost for making and fitting of water level gauge etc as per required. 1 Job 0.00
14 Operation , maintenance and other miscllanious works of the electro-machineries for the period of the bidder shall be totally responsible for the operation of minor and major work of DPS i.e burning of motor, transformer, panel, startor, bearing replacing etc. no further claim will be paid by Buidco. 1 Job 0.00
15 Deployment of 2x3 nos. shift per day road sweepers for removing floating materials from sump, cleaning the premises, taking out the garbages from pump impeller and miscellaneous work during the monsoon period 01.06.2026 to 15.10.2026 and before monsoon (01st April 2026 to 31st May 2026) & after mansoon (1x1) sweepar up to 31 st march 2027 required for as per Direction of Engineer- in-charge. The no. of road sweepers may increase as per situation arisen due to heavy rain fall. 1050 staff 0.00
16 Deployment of per day shift wise (2X3) manpower for pump operation & Electricity work during the monsoon period 01.06.2026 to 15.10.2026 and before monsoon (01st April 2026 to 31st May 2026) & after mansoon (1x3) manpower required up to 31 st march 2027 for pump operation as per direction of Engineer-in-charge at DPS. ( The no. of pump operators may increase as per situation arisen due to heavy rain fall). 1506 staff 0.00
Estimated cost for year 2026-27 0.00
Name of work - Annual repairing, servicing and maintenance of 60 HP submersible motor of pump .
SI. NO Particulars Quantity Rate Amount(RS)
1 Cost for Providing all labours,tools and tackles at site for disconnecting the 60 HP submersible pump set and taking out form sump well. 1 Job 0.00
2 Cost for dismantaling of monoblock Sub-mersible pump set,taking out rotor form stator of motor and taking out damaged bearing form rotor and cleaning with petrol and ready for repair work. 1 Job 0.00
3 Cost for supplying and fitting Angular contact ball bearing no. 3313A/C3. SKF make. 1 no. 0.00
4 Cost for supplying and fitting deep grooved ball bearing no. 6313 ZZ. Skf make. 1 no. 0.00
5 Cost for supplying and fitting copper cable socket. 5 nos. 0.00
6 Cost for supplying and fitting cable entry kit. 1 set 0.00
7 Cost for supplying and fitting joint rubber gasket. 1 no. 0.00
8 Cost for making, supplying and fitting mechanical lock . 1 set 0.00
9 Cost for supplying and fitting mechanical seal as per size and sample. 1 no. 0.00
10 Cost for supplying following with GST, CP and Labour cess.
(i) Mobil (super servo-10) hydraulic 7 ltrs 0.00
(ii) Servo bearing grease 2 Kgs 0.00
(iii) Nuts,bolts and key of different sizes. 1 set 0.00
11 Cost for fitting and bearing in rotor of motor assembling rotor in stator of motor complete set. 1 Job 0.00
12 Cost for supplying and fitting rubber insertion sheet of size 1/8'' thick(black). 3 Kgs 0.00
12 Cost for transportation of pump motor assembly form site to workshop for repair and back to pump house after repair including all cost of labour for loading and unloding. 1 Job 0.00
13 Cost for providing all labours,tools and tackles at site for lowering of motor pump assembly . Fitting and fixing of pump motor assembly to discharge pipe and testing on load. 1 Job 0.00
Name of work - Annual, repairing , servicing and maintenance of 60 HP sub motor .
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for complete opening of 60 HP sub motor part by part & taken out of top & bottom bearing from bearing houshing and repairing of bearing houshing with weilding with C.I electrode, turning, and finishing as required shape and size. 1 job 0.00
2 Cost for supplying angular contact bearing 6319C3 of SKF Make, if required. SKF make. 1 job 0.00
3 Cost for greasing the bearing of motor and varnishing, heating & taping of enamelled copper winding wire including required materials like grease and varnish-6 lit.etc. 1 job 0.00
4 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place etc. 1 job 0.00
Name of work - Annual Repairing and servicing of 60 HP FASD air break Starter & control panel for operation of 60 HP sub pump set.
SI.No Particular Quantity Rate Amount(RS)
1 Cost for providing all labours, tools and tackles at site for servicing LT distribution panel board by decarbonising its all contact joints, bushes washing with petrol ,proper insulating of cable termonal with requsite kind of tapes and repair its all internal wiring of 6 x 60 HP submerssible pump set. 3 job 0.00
1 Cost for supplying & fitting required following items as below
I. Contactor kit for ML-4 contactor 95 amp . 3 no. 0.00
II. On Delay Timer KRTPN 10 3 no. 0.00
III. Over load relay CT2MC305ANA3C 3 no. 0.00
IV. Push Button -2 no 6 no. 0.00
v. LED pilot lamp 9 no. 0.00
vi. Auxillary contact block 1NO + 1NC 3 no. 0.00
vii. Magnet coil 9-1258 3 no. 0.00
2 Reparing of Panel with changing and fitting (0-150A) Ampere meter- 1no,(0-500V) voltmeter-1no, 1 no selector switch,3 no copper strip bus bar ,2no C.T Coil, 3 no pilot lamp ,100 Amp.and 1 no 160 amp. 35 KA MCCB and changing all interval wiring etc. all complete.
I. Ammeter (0-150) amp 1 no. 0.00
II. Voltmeter(0-500)Volt 1 no. 0.00
III. selector switch 16 Amp 1 no. 0.00
IV. Bus-bar 400mm x32m tkick- 2 no. 0.00
V. C.T Coil 100/5 2 no. 0.00
VI Phase indicating lamp 3 no. 0.00
3 cost for supply of 2.5 sq. mm flexible copper wire for repair of internal wiring of all the panel board and starters as required. 10 mtr 0.00
4 Cost for supplying skilled technician and helper for complete blowing out the dusts and vermin, dismantling of above five nos. of starter of 60 HP capacity and fitting of above contactors and spares consisting with all requsite materials during fitting and testing on load on site. 1 job 0.00
5 Cost for cutting and removing old and damaged copper & aluminium cable socket of panel board & starters and doing cable socketing of 240 mm² Al & 50 mm² cu for 60 HP panel & starter including cost of cable socket and required insulating materials. 9 no. 0.00
Name of work - Annual repairing and servicing of 75 HP CF pump set no. -1 of storm drainage pumping plant Saidpur STP.
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 75 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 75 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, bearing cover, etc, and cleaning all inner components for ready for repairing. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for making , supplying and fitting of bronze bush of size OD 60 mm ID 58 mm length 1 nos 0.00
6 Cost for supplying of fenaflex tyre coupling of through bore type F120 size for 75 HP capacity. 1 nos 0.00
7 Cost for making, supplying and fitting of CI bearing bush as per sample and size 1 set 0.00
8 Cost for supplying and fitting of angular contact ball bearing SKF 3213 A for DE end. 2 no. 0.00
9 Cost for supplying and fitting of angular contact ball bearing SKF 3313 A NDE end. 1 no. 0.00
10 Cost for rubber insertion 1/8” thick. 8 kg 0.00
11 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
12 Cost for making, supplying and fitting impeller lock screw with washer made of MS with full thread. 1 Set 0.00
13 Cost for supplying and fitting lock nut. 1 nos 0.00
14 Cost for supplying and fitting lock washer. 1 nos 0.00
15 Cost for fitting materials such as grease 2 kg, gland packing 5/8”- 5 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
16 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
17 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller, placing of motor on its base by top lifting, coupling of motor with pump, checking of alignment of pump with motor and doing all electrical connection of motor & testing on no-load and full load. etc all complete (1 job x 2 days= 2 job) 2 job. 0.00
18 Cost for transportation of pump and its accessories from pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 500 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer. 5 Kg 0.00
20 Deduct : Cost of Scrap materials Stainless steel 1 Kg 0.00
21 Deduct : Cost of Scrap materials bronze metal 1 Kg 0.00
Name of work - Annual repairing and servicing of 100 HP CF pump no. -1 of storm drainage pumping plant Saidput STP .
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 100 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 100 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, bearing cover, etc, and cleaning all inner components for ready for repairing. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for supply and fitting of bronze bush of size ID 80 mm OD 95 mm Length 210 mm 1 job 0.00
6 Cost for supplying and fitting of rubber patta with bolts & nuts for 10" dia. Motor pump couplings.. 1 set 0.00
7 Cost for supplying and fitting of ball bearing SKF 7317 BEP of DE including CP & labour cess. 2 nos 0.00
8 Cost for supplying and fitting of roller ball bearing SKF of NDE NU2219ECJ or ECP including CP & labour cess. 1 no. 0.00
9 Cost for rubber insertion 1/8” thick. 10 kg 0.00
10 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
11 Cost for supplying and fitting SS316 lock nut for bearing as per sample. 1 no. 0.00
12 Cost for supplying and fitting SS316 lock washer. 1 no. 0.00
13 Cost for supplying and fitting nose type CI dom nut of nose type for impeller as per sample. 1 no. 0.00
14 Cost for fitting consumable materials such as grease 2 kg, gland packing 5/8”- 5 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
15 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
16 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing,palcing of motor on base, doing coupling of motor with pump, checking and correcting alignment of motor pump and doing all electrical connection of motor & testing on no-load and full load. etc all complete.(1job x 2 days) 2 job. 0.00
17 Cost for transportation of pump and its accessories from pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 600 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
18 Cost for supplying and fitting bolts and nuts of different sizes with washer. 6 Kg 0.00
19 Deduct : Cost of Scrap materials bronze. 3 kg 0.00
20 Deduct : Cost of Scrap materials Stainless steel 6 Kg 0.00
Name of work - Repairing & sevicing of 400 amp & 600 amp OCB .
SI.No Particular qty Rate Amount(RS)
1 Providing all Labours,tool & tackles at site for opening and dismantling 400 amp & 600 amp OCB cleaning all the components and refitting after repair etc. 2 Job 0.00
2 Cost for supplying and fitting following for 400 amp & 600 amp. OCB with all taxes.
i Fixed copper contact'A' 12 nos 0.00
ii Fixed copper contact'A' 12 nos 0.00
iii Moving copper contact 12 nos 0.00
iv No volt coil 2 nos 0.00
v T- oil supply 60 lit 0.00
3 Cost for supply of 2.5 sq. mm flexible copper wire for repair of internal wiring of all panels boards & starters 2 coil 0.00
4 Cost for providing all labours, tools & tackles at site for opening & dismantling all internal wiring ,copper bus bar of 7 nos of sub pump sets combined panel board, removing dust and vermins by blowing machine, cleaning and washing all the internal joints & components with petrol and greasing them properly and resetting all complete job. 1 job 0.00
5 Cost for cutting burnt cable socket and doing cable socketting of armoured copper cable with socket and requisite insulating materials for sub pump set panel board and starter etc including all taxes. 36 nos 0.00
Name of work - Repairing, servicing, cleaning, and greasing of AB switch & DP structure of 11 KV electric sub - station and filtration of transformer oil of 1 x 500 KVA & 1 x 400 KVA transformer.
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 2 jobs. 0.00
2 Cost for supplying & fitting following spares. :-
i. Post insulator. 2 Pcs 0.00
ii. Horn gap fuse. ( 1 pcs = 3 nos.) 5 Pcs 0.00
iii. Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 6 Pcs 0.00
iv. Copper wire 6 SWG. 5 kg 0.00
v. GI bolts & nuts with washer of different sizes 3 kg 0.00
vi. Knife type male & female contact for 400 Amp. AB switch. ( 1 Pcs = 3 nos) 2 Pcs 0.00
vii Lightening arrestor for 11 KV sub station 2 Pcs 0.00
ix Fuse wire 19 no. 1 Kg 0.00
3 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of 1x315 KVA transformer. 2 jobs. 0.00
4 Cost for opening the top cover and other qualizing pipes of transformer for fitting and lightening of HT & LT studs and draining of transformer oil and stacking of transformer oil in container. 2 jobs. 0.00
5 Cost for supplying and fitting following :-
(i) LT stud of copper 6 nos. 0.00
(ii) LT bush 6 nos. 0.00
(iii) HT stud of copper 6 nos. 0.00
(iv) HT bush 6 nos. 0.00
(v) Rubberized gasket 2 nos. 0.00
(vi) Transformer oil 80 ltrs. 0.00
6 Cost for tightening of HT & LT studs, refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 2 jobs. 0.00
7 Cost for filtration of transformer oil.(each transformer contains 350 ltr of T. oil) 600 ltrs. 0.00
8 Cost for PVC sleeving suitable to withstand 11 KV power supply for sleeving of 6 SWG jumpher wire 10 Mtr. 0.00
9 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 12 nos. 0.00
10 Deduct : Cost of Scrap materials Copper 6 kg 0.00
Name of work - Cleaning and desilting of sump, bye pass gate, approach channel, outlet channel etc of Saidpur STP (old) Drainage pumping stations under Mechanical works division, Buidco .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Labour Analysis for desilting
Labour required = 1.2 labour per cum
2 Cost for supplying all labours, tools and suitable tackles for cleaning and desiliting of filled and choked sewage tank, approach channel and inlet chamber etc of saidpur drainege pumping station and to lift and disposal of all soils up to a lead of 50 mtr all complete as per specification and direction of E/I at site. (i) Sump (Inner side) 14.5 m x 4.3 m x 2 m (avg) = 124.70 m³ (ii) Sump (outer side) 14.33 m x 2.13 m x 2 m (avg) = 61.05 m³ 185.75 m³ 0.00
3 Cost for providing all labours, tools and tackles at site for repairing, removing rust,dust, scale, smokes etc. from old surface and spray painting two or more coats with anticorrosive bituminous paint of approved brand of two MS gate and channel . 1 job 0.00
4 Cost for providing all labours, tools, tackles & a 10 H.P. electric pump set for dewatering the area within band including cost of hire of electric pump set . SOR RCD PM6 1001. Basic rate-195/Hr. 30 Hr 0.00
Gr-04 (4) Name of Work :- Annual Repairing, overhauling, servicing, operation & maintenance for electromechanical equipment of R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for monsoon 2026. (From 01st April 2026 to 31st March 2027)
Sl. No. Particulars of work Qty. Unit Rate in Rs. Amount (in Rs.)
1 Pump no-1 - 75 HP C/F 3 phase, 440 volts, 50 hz (Annexure-1) 1 Job 0.00 0.00
2 Pump n0-2- 100 HP C/F 3 phase, 440 volts, 50 hz ( Annexure -2) 1 Job 0.00 0.00
3 Pump n-3- 125 HP C/F 3 phase, 440 volts, 50 hz ( Annexure -3). 1 Job 0.00 0.00
4 Pump no-4- 125 HP C/F pump of 156 HP diesel engine (Annexure-4). 1 Job 0.00 0.00
5 Repairing & servicing of 156 HP diesel engine (Annexure-5) 1 Job 0.00 0.00
6 Repairing and servicing of Transformer - 2 x 315 KVA ( Annexure -6). 1 Job 0.00 0.00
7 Repairing and servicing of Vaccum pump- 3 x 10 HP 3 phase, 440 volts, 50 hz (Annexure-7). 1 Job 0.00 0.00
8 Repairing and servicing starter cum panel- 1 x 75 HP , 1 x 100 HP and 1 x125 HP and 214 HP of Pump set (Annexure- 8). 1 Job 0.00 0.00
9 Desilting of sump (Annexure-9) 1 Job 0.00 0.00
10 Repairing and servicing of Pump no-5 - 214 HP Sub 3 phase, 440 volts, 50 hz (Annexure-10) 1 Job 0.00 0.00
11 operation , maintenance , spray painting & other miscellanious works of the electro-machineries equipment.(Annexure- 11) 1 Job 0.00 0.00
12 Deployment of 3 nos. x 3 shifts road sweepers per day during the monsoon period 1st june to 15th oct. and before monsoon (01st April 2026 to 31st May 2026) & after monsoon 1x2 shift up to 31st march 2027 for removing floating materials from sump, cleaning the premises, taking out the garbages from pump impeller and miscellaneous work . 1689 Job 0.00
13 Deployment of 2 nos. x 3 shifts pump operator per day during the monsoon period from 1st june to 15th oct. and before monsoon (01st April 2026 to 31st May 2026) & 1x3 shift in rest period upto 31st March 2027 for the operation of pumps. 1506 Job 0.00
Estimated cost for year 2026-27 Total Rs 0.00
Name of work - Annual repairing and servicing of 75 HP CF pump set no. -1 of storm drainage pumping plant of R K Avenue.
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 75 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 75 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, bearing cover, etc, and cleaning all inner components for ready for repairing. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for making , supplying and fitting of bronze bush of size OD 65 mm ID 58 mm Length 180 mm 1 nos 0.00
6 Cost for supplying of fenaflex tyre coupling of through bore type F120 size for 75 HP capacity. 1 nos 0.00
7 Cost for making, supplying and fitting of CI bearing bush as per sample and size 1 set 0.00
8 Cost for supplying and fitting of angular contact ball bearing SKF 3213 A for DE end. 2 no. 0.00
9 Cost for supplying and fitting of angular contact ball bearing SKF 3313 A NDE end. 1 no. 0.00
10 Cost for rubber insertion 1/8” thick. 8 kg 0.00
11 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
12 Cost for making, supplying and fitting impeller lock screw with washer made of MS with full thread. 1 Set 0.00
13 Cost for supplying and fitting lock nut. 1 nos 0.00
14 Cost for supplying and fitting lock washer. 1 nos 0.00
15 Cost for fitting materials such as grease 2 kg, gland packing 5/8”- 5 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
16 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
17 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller, placing of motor on its base by top lifting, coupling of motor with pump, checking of alignment of pump with motor and doing all electrical connection of motor & testing on no-load and full load. etc all complete (1 job x 2 days= 2 job) 2 job. 0.00
18 Cost for transportation of pump and its accessories from R K Avenue pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 500 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer. 5 Kg 0.00
20 Deduct : Cost of Scrap materials bronze metal 1 Kg 0.00
Name of work - Annual repairing and servicing of 100 HP CF pump no. -2 of storm drainage pumping plant of R K Avenue .
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 100 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 100 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, bearing cover, etc, and cleaning all inner components for ready for repairing. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for supply and fitting of bronze bush of size ID 80 mm OD 95 mm Length 210 mm 1 job 0.00
6 Cost for supplying and fitting of rubber patta with bolts & nuts for 10" dia. Motor pump couplings.. 1 set 0.00
7 Cost for supplying and fitting of ball bearing SKF 7317 BEP of DE including CP & labour cess. 2 nos 0.00
8 Cost for supplying and fitting of roller ball bearing SKF of NDE NU2219ECJ or ECP including CP & labour cess. 1 no. 0.00
9 Cost for rubber insertion 1/8” thick. 10 kg 0.00
10 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
11 Cost for supplying and fitting SS316 lock nut for bearing as per sample. 1 no. 0.00
12 Cost for supplying and fitting SS316 lock washer. 1 no. 0.00
13 Cost for supplying and fitting nose type CI dom nut of nose type for impeller as per sample. 1 no. 0.00
14 Cost for fitting consumable materials such as grease 2 kg, gland packing 5/8”- 5 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
15 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
16 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing,palcing of motor on base, doing coupling of motor with pump, checking and correcting alignment of motor pump and doing all electrical connection of motor & testing on no-load and full load. etc all complete.(1job x 2 days) 2 job. 0.00
17 Cost for transportation of pump and its accessories from R K Avenue pump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 600 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
18 Cost for supplying and fitting bolts and nuts of different sizes with washer. 6 Kg 0.00
19 Deduct : Cost of Scrap materials bronze. 3 kg 0.00
Name of work - Annual repairing and servicing of 125 HP CF pump no. -3 of storm drainage pumping plant of R K Avenue.
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 125 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 125 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, spacer sleeve, bearing cover, etc, and cleaning all inner components for ready for repair. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for supply and fitting of Bronze bush of size 102 mm OD x 90 mm ID x 152 mm long 1 nos. 0.00
6 Cost for supplying and fitting of roller ball bearing SKF 22320 E of driving end including CP & labour cess. 2 nos 0.00
7 Cost for supplying and fitting of roller ball bearing SKF NU 222 ECM of non driving end including CP & labour cess. 1 nos 0.00
8 Cost for rubber insertion 1/8” thick. 8 kg 0.00
9 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
10 Cost for making, supplying and fitting impeller lock screw made of SS 316 with full thread. 1 Set 0.00
11 Cost for making, supplying and fitting impeller lock washer made of SS 316 with full thread. 1 Set 0.00
12 Cost for supplying and fitting lock nut for bearing. 1 no 0.00
13 Cost for supplying and fitting lock washer. 1 nos 0.00
14 Cost for fitting consumable materials such as grease 2 kg, gland packing 5/8”- 5 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
15 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
16 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, and palcing of motor on base, doing coupling of motor with pump, checking and correcting alignment of motor pump and doing all electrical connection of motor & testing on no-load and full load.etc all complete.(1 job X 2 days) 2 job. 0.00
17 Cost for transportation of pump and its accessories from R K Avenuepump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 800 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer. 6 Kg 0.00
20 Deduct : Cost of Scrap materials bronze 4 Kg 0.00
Name of work -Annual repairing and servicing of 125 HP CF pump no. -4 of 156 HP diesel engine pump set of storm drainage pumping plant of R K Avenue .
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 125 HP CF motor and pump and all the electrical connections of motor, taking down motor from its base by top lifting of motor from motor base and stacking the motor at proper place. 1 job 0.00
2 Cost for providing all labours, tools and tackles at site for opening of all bolts and nuts of pump casing and bearing housing & taking out of bearing housing together with impeller and coupling and pump shaft (complete rotating assembly). 1 job 0.00
3 Cost for opening and dismantling 125 HP pump rotating assembly in workshop and tacking out impeller, pump shaft and bearings from bearing housing, thrust collar, grease shield of DE & NDE, shaft sleeve, spacer sleeve, bearing cover, etc, and cleaning all inner components for ready for repair. 1 job 0.00
4 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine. 1 job 0.00
5 Cost for supply and fitting of bronze bush of size 102 mm OD x 90 mm ID x 152 mm long 2 nos. 0.00
6 Cost for supplying and fitting of spherical roller ball bearing SKF 22320 E of driving end including CP & labour cess. 2 nos 0.00
7 Cost for rubber insertion 1/8” thick. 8 kg 0.00
8 Cost for making steel key for impeller and coupling pulley. 2 nos 0.00
9 Cost for making, supplying and fitting impeller lock screw made of SS 316 with full thread. 1 Set 0.00
10 Cost for making, supplying and fitting impeller lock washer made of SS 316 with full thread. 1 Set 0.00
11 Cost for supplying and fitting lock nut for bearing. 1 no 0.00
12 Cost for supplying and fitting lock washer. 1 nos 0.00
13 Cost for fitting consumable materials such as grease 2 kg, gland packing 5/8”- 2 kg, cotton waste, packing paper, rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
14 Cost for reassembling of pump shaft, its bearing and accessories into the bearing housing and fitting of impeller in workshop. 1 job. 0.00
15 Cost for supplying all labours, tools & tackles at site for fitting of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
16 Cost for transportation of pump and its accessories from R K Avenuepump house to firm workshop and back to pump house (The total weight of pump and accessories is approximately 800 kg & work shall be undertaken by loading on Pick-up Van). 1 job. 0.00
17 Cost for palcing of motor on base, doing coupling of motor with pump, checking and correcting alignment of motor pump and doing all electrical connection of motor & testing on no-load and full load. 1 job. 0.00
18 Cost for supplying and fitting bolts and nuts of different sizes with washer. 6 Kg 0.00
19 Cost for supplying and fitting SS coupling bolt as per size and sample. 12 nos 0.00
20 Cost for supplying and fitting Damroo shape rubber coupling bush 12 nos 0.00
21 Deduct : Cost of Scrap materials bronze. 3 Kg 0.00
Name of Work : - Annual repairing & servicing of 156 HP diesel engine and its accessories vacuum pump set of storm drainage pumping plant R K Avenue .
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools, tackles and an experienced mechanic at site for servicing of 156 HP diesel engine of Greaves make by checking of fuel pump, oil pump, decarbonisation of engine cylinder head and testing of engine on unload and load, etc, all complete. 1 job. 0.00
2 Cost for supplying and fitting following :-
(i) Air filter outer 1 set 0.00
(ii) Diesel filter 1.1 L 2 nos. 0.00
(iii)set of joints 1 set 0.00
(iv)Lubricating oil filter 1 set 0.00
(v)Set of Hoses 1 set 0.00
(vi)Hose pipe clip 1 no. 0.00
(vii) Flexible pipes 1 set 0.00
(viii) Pre Diesel Filter 'O' ring 1 no. 0.00
(ix) Fuel on Solenoid switch 24 V DC for fuel pump 1 no. 0.00
(x) Coolant 5 ltr cane 1 cane 0.00
(xi) Lube Oil 20 ltr 15 W 40 (25 LTR X 1 CANE) 1 cane 0.00
(xii) Open relay 1 no. 0.00
(xiii) Start Relay 1 no. 0.00
(xiv) V Belt 1 set 0.00
(xv) H P Pipe 1 set 0.00
(xvi) Exhaust pipe flexible 125 mm ID 1 no. 0.00
(xvii)Sealing washer 1 set 0.00
(xviii)Set of gasket 1 set 0.00
(xix)Cable Harmess 1 no. 0.00
3 Cost for checking of leakages in radiator in workshop and repairing of leakages in radiator by replacing damaged portion of copper tube and repairing leakages by soldering of reparable copper pipes. 1 Job. 0.00
4 Cost for supplying and fitting Tata Green Battery / Exide make of capacity 150 AH excluding the cost of old battery. 2 nos. 0.00
5 Cost repairing of electrical panel of diesel engine by repalcing all burnt and damaged electrical wires and fuses and ckecking the electrical panel including the cost of labour and electricians. 1 Job. 0.00
6 Cost for servicing of alternator 1 Job. 0.00
7 Cost for self servicing 1 job. 0.00
8 Cost for providing all labours, tools and tackles at site for opening and taking of self of 10 HP vacuum pump and diesel engine for repairing and refitting the same after repairing. 1 job. 0.00
Name of work - Annual servicing, cleaning, greasing and repairing of AB switch & DP structure of 11 KV electric sub - station and filtration of transformer oil of 2 x 300 KVA transformer of storm drainage pumping plant R K Avenue.
Sl. No Particulars Quantity Rate Amount(Rs)
1 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 2 jobs. 0.00
2 Cost for supplying & fitting following spares. :-
i. Post insulator. 6 Pcs 0.00
ii. Horn gap fuse. ( 1 pcs = 3 nos.) 2 Pcs 0.00
iii. Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Pcs 0.00
iv. Copper wire 6 SWG. 4 kg 0.00
v. GI bolts & nuts with washer of different sizes 4 kg 0.00
vi. Knife type male & female contact for 400 Amp. AB switch. ( 1 Pcs = 3 nos) 2 Pcs 0.00
vii Fuse wire 19 no. 0.5 Kg 0.00
3 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of 500 KVA transformer. 2 jobs. 0.00
4 Cost for opening the top cover and other equalizing pipes of transformer for fitting and tightening of HT & LT studs and draining of transformer oil and stacking of transformer oil in container. 2 jobs. 0.00
5 Cost for supplying and fitting following :-
(i) LT stud of copper 6 nos. 0.00
(ii) LT bush 6 nos. 0.00
(iii) HT stud of copper 6 nos. 0.00
(iv) HT bush 6 nos. 0.00
(v) Rubberized gasket 6 nos. 0.00
(vi) Transformer oil 80 ltrs. 0.00
6 Cost for tightening of HT & LT studs, refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 2 jobs. 0.00
7 Cost for filtration of transformer oil.(each transformer contains 350 ltr of T. oil) 700 ltrs. 0.00
8 Cost for PVC sleeving suitable to withstand 11 KV power supply for sleeving of 6 SWG jumpher wire 20 Mtr. 0.00
9 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 16 nos. 0.00
10 Deduct : Cost of Scrap materials Copper 4 kg 0.00
Name of work - Opening, dismantling and repairing of 3 x 10 HP vacuum pump of storm drainage pumping plant R. K. Avenue .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Cost for providing all labour, tools and tackles at site for opening electrical connection of 10 HP vacuum pump motor, foundation bolts and nuts of pump, GI flange and taking out and removing it from base. 3 jobs. 0.00
2 Cost for dismantling of 10 HP vacuum pump for taking out impeller, pump shaft, etc and cleaning all the components for ready for repair. 3 jobs. 0.00
3 Cost for repairing of steel shaft by remetalling on cut point, turning and polishing of the shaft and making key way groove. 3 jobs. 0.00
4 Cost for repairing GM impeller by brazing the blades of impeller with brass, turning, polishing and facing the blade to bring it to running condition. 3 jobs. 0.00
5 Cost for making supplying and fitting GM bush as per sample. 6 nos. 0.00
6 Cost for supplying and fitting ball bearing no. 6307 ZRS1 of SKF with fitting charge (MRP- 1346.00). 6 nos. 0.00
7 Cost for supplying and fitting oil seal as per sample. 6 nos. 0.00
8 Cost for fitting materials such as packing paper, grease, gland packing, nuts and bolts, cotton waste etc required at the time of fitting of pump. 3 jobs. 0.00
9 Cost for repairing of body (brass discs) by facing both the sides. 3 nos. 0.00
10 Cost for supplying and fitting split type GM gland flange. 2 nos. 0.00
11 Cost for reassembling of pump with shaft, impeller, bearing set, oil seal, etc accessories in work shop. 3 jobs. 0.00
12 Cost for transportation of pump from R. K. Avenue Pump house to work shop and back to pump house. 3 jobs. 0.00
13 Cost for providing all labour, tools and tackles for reinstallation of motor and pump on base and doing electrical connections and testing all complete. 3 jobs. 0.00
14 Cost for cutting and removing burnt cable sockets and doing cable socketing of 4 mm² 3 core copper cable of both motor and starter. 12 nos. 0.00
15 Cost for providing & fitting of DOL starter suitable for operation of 10 HP electric motor. (MRP-3405.00) 1 no. 0.00
16 Deduct : Cost of Scrap materials Gun metal. 2 Kg 0.00
Name of work -Annual Repairing and servicing of 1 x 75 HP , 1 x 100 HP and 1 x125 HP and 214 HP soft starter /FASD air break Starter cum control panel for operation of motor at DPS RK Avenue .
SI.No Particular Quantity Rate Amount(Rs)
1 Providing all Labours,tool & tackles for repairing of 1 x 75 HP, 1 x 100 HP and 1 x 125 HP fully automatic star-delta air break starter cum panel with supply,changing and fitting contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required. 1 job 0.00
(i) Contactor 70 amp BCH make for 75 HP pump. 2 no. 0.00
(ii) Contactor 110 amp BCH make for 100 HP pump. 2 no. 0.00
(iii) Contactor 140 amp BCH make for 125 HP pump. 2 no. 0.00
(iv) Timer (0-30)sec. 3 no. 0.00
(v) Thermal Over load relay unit having (84-135) Amp. 2 no. 0.00
(vi) Push Button. 6 no. 0.00
(vii) C.T Coil 1000/5 . 9 no. 0.00
(viii) MCB . 6 no. 0.00
(ix) Single phase preventer. 3 no. 0.00
(x) Ammeter (0-200) amp. 3 no. 0.00
(xi) Voltmeter(0-500)Volt . 3 no. 0.00
(xii) selector switch . 3 no. 0.00
(xiii) Bus-bar . 9 no. 0.00
(xiv) Phase indicating lamp . 9 no. 0.00
(xv) Incomer MCCB 50 KA 400 A . 2 no. 0.00
2 Cost for supplying and fitting single core 70 mm² copper wire for lead wire. 10 mtr 0.00
3 Providing all Labours,tool & tackles for repairing of 1 x 214 HP soft starter cum panel with supply,changing and fitting contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required. 1 job 0.00
Name of work - Cleaning and desilting of sump, bye pass gate, approach channel, outlet channel etc of R K Avenue Drainage pumping stations .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Labour Analysis for desilting
Labour required = 1.2 labour per cum
2 Cost for supplying all labours, tools and suitable tackles for cleaning and desiliting of filled and choked sewage tank, approach channel and inlet chamber etc of R K Avenue drainege pumping station and to lift and disposal of all soils up to a lead of 50 mtr all complete as per specification and direction of E/I at site. (i) Sump - 13.72 m x 2.9 m x 1.85 m = 73.61 m³ 73.61 m³ 0.00
3 Cost for providing all labours, tools and tackles at site for repairing, removing rust,dust, scale, smokes etc. from old surface and spray painting two or more coats with anticorrosive bituminous paint of approved brand of two MS gate and channel . 1 job 0.00
Name Of Work :- Annual repair, operation & maintenance of 214 HP non clog submersible pump set Storm Drainage Pumping Station, Saidpur for the years as session 2026-27 .
SI.No. Description Of Work Qty Rate (RS.) Amount (RS.)
1 Complete repairing and overhauling of 214 HP non clog submersible pump by taking out submersible motor pump set, opening and dismentling of 214 HP sub. Motor pump assembly and taking out impeller from motor pump assembly supplying and fitting bearing heating and varnishing of stator, copper cable socket, cable entry kit, rubber gasket, lip seal, spring washer, mechanical lock, seal, mobile, greese, nut & bolt, bearing,repairing of pump, transportation etc. with deducting the taken out scrap materials, and reassembling, installation & testing on full load at site. Work & quantity may vary. 1 job 0.00
Name of work -Annual Operation , maintenance, spray painting and other missellenious work of the electro-machineries .
Sl. No Particulars Quantity Rate Amount (Rs)
1 Annual, Operation , maintenance and misscellenious work of the electro-machineries for monsoon period and after the bidder shall be totally responsible for the operation of minor and major work of DPS i.e burning of motor, transformer, panel, starter, bearing, Shaft replacing, lighting, CCTV camera with internet and any other fault etc. no further claim will be paid by Buidco. 1 job 0.00
2 Spray painting of all electro mechanical equipment and pipe line over one coat of red primer complrte job. 1 job 0.00
3 Complete changing i.e. S/F of 300 mm dia butter valve of delivery pipe line . 1 job 0.00
Sl. No. Abstract Amount
Gr04 (1) Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) Saidpur DPS, (2) Rampur DPS, (3) Saidpur STP DPS and (4) R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 ) 0.00
Gr04 (2) Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) Saidpur DPS, (2) Rampur DPS, (3) Saidpur STP DPS and (4) R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 ) 0.00
Gr04 (3) Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) Saidpur DPS, (2) Rampur DPS, (3) Saidpur STP DPS and (4) R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 ) 0.00
Gr04(4) Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) Saidpur DPS, (2) Rampur DPS, (3) Saidpur STP DPS and (4) R.K. Avenue DPS under Bankipur Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 ) 0.00
Project Director (Mech)
Patna Central (Mech) Works Division
Malahi Pakari, BUIDCo, Patna.
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBD Gr04.pdf
NIT • 1.82 MB
NIT01.pdf
NIT • 1.96 MB
Financial04.xlsx
NIT • 0.08 MB
C4 Prebid Meeting Proceeding.pdf
Corrigendum • 2.90 MB
C3 Corrigendum2.pdf
Corrigendum • 0.34 MB
C2 cORRIGENDUM1.pdf
Corrigendum • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .