Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAdmitted-Finance 19192 STREET NO 08 BIBI WALA ROAD OPPOSITE DAV COLLEGE BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | L1 | Admitted-Finance | |
| 2 | L2₹8.0 Cr+₹72.2 L (9.90%)Admitted-Finance C 33 3971 GALI NO 6 JALANDHAR CANTT 144005 | JALANDHAR | JALANDHAR | PUNJAB | 144005 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Mukesh Kumar Gupta L2 | M/S MANI GARG CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Demolition of Cement Concrete (Unreinforced Concrete) of any description and in any position not otherwise specifically provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 160.26 | Cubic Metre | 400 ₹64,104 Lowest | 500 ₹80,130 |
| 2.00 | Demolition of brick work or stone/boulder masonry built in cement mortar including all quions arches, pillar or any other description and in any situation etc complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 247.57 | Cubic Metre | 380 ₹94,076.6 Lowest | 1,500 ₹3,71,355 |
| 3.00 | Demolition of cement concrete (reinforced) and (reinforcement cut as required to facilitate demolition) in any position not otherwise specificaly provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 223.79 | Cubic Metre | 480 ₹1,07,419.2 Lowest | 2,500 ₹5,59,475 |
| 4.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 1,200 | Square Metre | 30 ₹36,000 | 10 ₹12,000 Lowest |
| 5.00 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre deep and not exceeding 1.5 metre wide for laying of cables, pipes, foundation etc or for shafts, wells, cesspits,manholes, pier holes, etc.not exc 10 sq metre on plan and getting out including dressing/trimming sides and levelling/ grading and ramming of bottom of excavation complete, all as specified and directed by Engineer-in-Charge. | 84.61 | Cubic Metre | 230 ₹19,460.3 | 200 ₹16,922 Lowest |
| 6.00 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 metre,including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge. | 16,897.16 | Cubic Metre | 220 ₹37,17,375.2 | 200 ₹33,79,432 Lowest |
| 7.00 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 1.5 metre but not exc 3.0 metre including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge. | 5,348.21 | Cubic Metre | 255 ₹13,63,793.55 | 250 ₹13,37,052.5 Lowest |
| 8.00 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 3.0 metre but not exc 4.5 metre including getting out the excavated soil all as specified and directed by Engineer-in charge.
Note for item 5 to 8 : Returning/filling shall be measured and paid separately. Before taking up the excavation work, the mapping of the site is to be carried out by hiring a ground penetrating radar or any other machine to find out the underground existing cable, pipe line etc. so that the damage to existing power cable, communication cable, water/sewer pipes shall be avoided during excavation work. The cost of hiring of machine for mapping of the area to be excavated shall be deemed to be included in the rate quoted. | 509 | Cubic Metre | 300 ₹1,52,700 Lowest | 400 ₹2,03,600 |
| 9.00 | Returning, filling in, including spreading, levelling, watering and well ramming excavated soil in layers not exceeding 25 cm thick each layer, complete, all as specified and directed by Engineer-in-Charge. | 16,447.66 | Cubic Metre | 70 ₹11,51,336.2 | 40 ₹6,57,906.4 Lowest |
| 10.00 | Removing excavated surplus soil obtained from excavation to a distance not exceeding 250 metre and deposting where directed at a level not exceeding 1.5 metre above the starting point complete, all as specified and directed by Engineer-in-Charge. | 4,304.33 | Cubic Metre | 90 ₹3,87,389.7 | 25 ₹1,07,608.25 Lowest |
Tender Value
₹4.8 Cr
EMD Value
₹5.5 L
Closing Date
13 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer Chd Zone
HQ CE Chandigarh Zone N Area, Airport Road Chandigarh-160003
CE CHZ CHM T18 2025 26 PROVN OF BALANCE ITEM OF WORK FOR ADDITION ALTERATION OF EXISTING SEWER LINES, CHAMBERS AND MANHOLES AT CHANDIMANDIRMIL STATION
2025_MES_740718_4
CE CHZ/CHM/T-18/2025-26
Open Tender
Civil Works
Item Rate
365 days
Chandimandir
As per tender documents
9 documents required · 9 mandatory
₹2,000
GE Chandimandir
₹5.5 L
Yes
22 Oct 2026
15 Sept 2026
15 Oct 2026
15 Sept 2026
13 Oct 2026
29 Sept 2026
15 Sept 2026 - 25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Cement Concrete (Unreinforced Concrete) of any description and in any position not otherwise specifically provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 160.26 | Cubic Metre | - | - |
| 2 | Demolition of brick work or stone/boulder masonry built in cement mortar including all quions arches, pillar or any other description and in any situation etc complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 247.57 | Cubic Metre | - | - |
| 3 | Demolition of cement concrete (reinforced) and (reinforcement cut as required to facilitate demolition) in any position not otherwise specificaly provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 223.79 | Cubic Metre | - | - |
| 4 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 1,200 | Square Metre | - | - |
| 5 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre deep and not exceeding 1.5 metre wide for laying of cables, pipes, foundation etc or for shafts, wells, cesspits,manholes, pier holes, etc.not exc 10 sq metre on plan and getting out including dressing/trimming sides and levelling/ grading and ramming of bottom of excavation complete, all as specified and directed by Engineer-in-Charge. | 84.61 | Cubic Metre | - | - |
| 6 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 metre,including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge. | 16,897.16 | Cubic Metre | - | - |
| 7 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 1.5 metre but not exc 3.0 metre including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge. | 5,348.21 | Cubic Metre | - | - |
| 8 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 3.0 metre but not exc 4.5 metre including getting out the excavated soil all as specified and directed by Engineer-in charge.
Note for item 5 to 8 : Returning/filling shall be measured and paid separately. Before taking up the excavation work, the mapping of the site is to be carried out by hiring a ground penetrating radar or any other machine to find out the underground existing cable, pipe line etc. so that the damage to existing power cable, communication cable, water/sewer pipes shall be avoided during excavation work. The cost of hiring of machine for mapping of the area to be excavated shall be deemed to be included in the rate quoted. | 509 | Cubic Metre | - | - |
| 9 | Returning, filling in, including spreading, levelling, watering and well ramming excavated soil in layers not exceeding 25 cm thick each layer, complete, all as specified and directed by Engineer-in-Charge. | 16,447.66 | Cubic Metre | - | - |
| 10 | Removing excavated surplus soil obtained from excavation to a distance not exceeding 250 metre and deposting where directed at a level not exceeding 1.5 metre above the starting point complete, all as specified and directed by Engineer-in-Charge. | 4,304.33 | Cubic Metre | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
tender.pdf
Tender Documents • 2.73 MB
Drg.pdf
Additional Documents • 1.89 MB
BOQ_884985.xls
BOQ • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .