Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹7.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.4 L+₹11,093 (1.52%)Admitted-Fee/PreQual/Technical/Finance | +0.50% | ₹7.4 L+₹11,093 (1.52%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.5 L+₹22,186 (3.03%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹7.5 L+₹22,186 (3.03%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.4 L
EMD Value
₹14,790
Closing Date
25 May 2026, 11:00 amClosed
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
MEERABAI WARD KE DADA MIYA UCHWA WALE BABA KE MAJAR KI PARISAR ME MITTI PATAI TIN SHED AND BOUNDRYWALL KA UCHCHIKARAN AND TILES KA NIRMAN KARYA.
2026_DOLBU_1141189_12
23/NPP/RUDAULI/2026-27
Open Tender
Civil Works
Percentage
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹880
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
₹14,790
5 Aug 2026
24 Apr 2026
26 May 2026
24 Apr 2026
25 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work cutting & filling including cartage upto 3.00 KM all complete. | - | cum | - | - |
| 2 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 | - | cum | - | - |
| 3 | P/L PCC 1:6:12 in cement, Fine Sand and 40mm brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 273 | - | cum | - | - |
| 4 | First class 150 brick work in 1:4 cement:C.sand mortar all compt. As per SI no. 305(b) | - | cum | - | - |
| 5 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 | - | sqm | - | - |
| 6 | P/L CC 1:2:4 in cement, C. Sand and 20mm stone grit and including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 279(b) | - | cum | - | - |
| 7 | Steel work in built up tubular (round, square or rectangular hallow tube etc) trusses etc including cutting, hosting, fixing in position all compt. As per DSR 10.16.1 | - | KG | - | - |
| 8 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with olymer coated jor L hooks, bolts and nuts 8 mm dia with bitumen and G.I. impet washer etc and shape … all complete as per DSR 12.1.1 | - | sqm | - | - |
| 9 | Finishing wall with primium acrylic smooth exterior paint with silicone addilives of required shade new work (two or more coats applied all compt. As per DSR 13.47.1ce method with rotavator at OMC.. All compt. As per Clause 401. | - | cum | - | - |
| 10 | Providing and applying whice cement based putty of avrage thickness 1 mm of approved brand and manufature over the plastered wall surface toperage the surface even and smooth complet. As per SI no. DSR 13.8 | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.50 MB
BOQ_2131540.xls
BOQ • 0.26 MB
NPP23.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .