Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | ₹9.8 L | L1 | Admitted-Finance |
| 2 | L2₹10.0 LAdmitted-Finance | ₹10.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AL FALAH ELECTRICAL WORKS L2 | M/S NEW HORIZON ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.00Creation of 100 kVA Substation along with HT-LT Network at Shah Jeelan Colony Palpora falling under the jurisdiction of ESD Nawakadal ED 3rd under Capex Budget 2025-26, PDDSS2526100100 (Turnkey Basis) | |||||
| 1.01 | Supply, Installation, Testing and commissiong of 100 kVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminum wound, and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer)) including integration with system by way of providing Clamps/Jumpers/necessary items required for commissioning. | 1 | No. | 2,00,000 ₹2 L | 1,51,000 ₹1.5 L |
| 1.02 | Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9 kV, 10 kA, Lighting Arrestor Set Heavy duty with Plymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) | 1 | Set | 2,000 ₹2,000 | 5,300 ₹5,300 |
| 1.03 | Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) | 2 | Set | 13,000 ₹26,000 | 9,500 ₹19,000 |
| 1.04 | Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. | 1 | Set | 3,000 ₹3,000 | 4,500 ₹4,500 |
| 1.05 | Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 8 | No. | 22,000 ₹1.8 L | 17,311 ₹1.4 L |
| 1.06 | Supply, Installation, Testing and commissiong of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 8 | No. | 16,000 ₹1.3 L | 13,111 ₹1.0 L |
| 1.07 | Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm with F-Top | 508.4 | kg | 70 ₹35,588 | 120 ₹61,008 |
| 1.08 | Supply, Laying, stringing, testing and commissioning of 50 mm² ACSR Conductor | 1,050 | Mtr | 40 ₹42,000 | 59 ₹61,950 |
| 1.09 | Supply, Laying, stringing, testing and commissioning of 100 mm² ACSR Conductor | 1,000 | Mtr | 40 ₹40,000 | 112 ₹1.1 L |
Updated dates
Tender Value
₹11.8 L
EMD Value
₹23,620
Closing Date
7 Mar 2026, 4:00 pmClosed
Executive Engineer, ED-3rd Srinagar
Office of Executive Engineer, ED-3rd Srinagar
Creation of 100 kVA Substation along with HT-LT Network at Shah Jeelan Colony Palpora falling under the jurisdiction of ESD Nawakadal ED 3rd under Capex Budget 2025-26, PDDSS2526100100 (Turnkey Basis)
2026_PDD_303634_1
ED-III /34 of 2025-26, Dated - 17-02-2026
Open Tender
Electrical Works
15 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical Specification, Drawings
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED-3rd Srinagar
₹23,620
Yes
10 Mar 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
7 Mar 2026
18 Feb 2026
18 Feb 2026 - 7 Mar 2026
Creation of 100 kVA Substation along with HT-LT Network at Shah Jeelan Colony Palpora falling under the jurisdiction of ESD Nawakadal ED 3rd under Capex Budget 2025-26, PDDSS2526100100 (Turnkey Basis)
Supply, Installation, Testing and commissiong of 100 kVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Copper wound, and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer)) including integration with system by way of providing Clamps/Jumpers/necessary items required for commissioning.
Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9 kV, 10 kA, Lighting Arrestor Set Heavy duty with Plymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V)
Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V)
Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS.
Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, Installation, Testing and commissiong of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm with F-Top
Supply, Laying, stringing, testing and commissioning of 50 mm² ACSR Conductor
Supply, Laying, stringing, testing and commissioning of 100 mm² ACSR Conductor
Supply, installation, testing and commissioning of 240 mm² Cable, 1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps/thimbles.
Supply, Installation, Testing and commissiong of 11kV Polymeric composite Pin Insulator with pins 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, Installation, Testing and commissiong of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impulse 75 KV positive and 80 KV negative , creepage distance 320 mm)
Supply and Fixing of Galvanized Nuts and Bolts of sizes
Design, Fabrication, Supply, installation, testing and commissioning of LT Fuse Set for Distribution Transformers (Customised) as per KPDCL Drawing no. CE/P&P/DRG/2023/LTFS/001
Providing of material and laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set, along with baby insulators & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply and Fixing of Danger Plates with Clamps
Supply and Fixing of Anti-Climbing Device with Clamps
Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm
Supply and Painting of poles with red Oxide
Supply and Painting of poles with Aluminium Paint
Supply & fixing of PG Clamps/ Wedge connectors
Supply & fixing of 16 kN Polymer Shackle Insulators along with GI U-Clamps.
Supply and fixing of GI Wire 6 SWG & 8 SWG
Supply, laying, testing and commissioning of 120 mm² AB (HT) Cable (3x120 + 1x95 insulated) mm² XLPE(11 kV, 3C + Earth)
Supply and fixing of Suspension/Tension Clamp with eye hook for HT Cable including Pole clamps /Collars
Supply and fixing of Heat Shrinkable Outdoor Cable Termination Kit for 11 kV ABC 120 mm²
Supply and fixing of 16 kN Polymer Shackle Insulators along with GI U-Clamps
Providing of material and laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum /pole
Providing of material and laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum /pole
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
DTspecifications.pdf
Other Document • 0.70 MB
SBD34.pdf
Tender Documents • 0.86 MB
BOQ_986056.xls
BOQ • 0.31 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
Download all tender documents and submit your bid