Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance NO 74 SADRAS MAIN ROAD NARASANKUPPAM VILLAGE 603109 MULLIKULATHUR POST THIRUKKAZUKUNDRAM TALUK CHENGALPATTU DISTRICT | CHENGALPATTU | TAMIL NADU | 603109 | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹9.8 L+₹2.5 L (34.5%)Admitted-Finance | ₹9.8 L+₹2.5 L (34.5%) | L2 | Admitted-Finance |
| 3 | L3₹11.6 L+₹4.3 L (58.4%)Admitted-Finance | ₹11.6 L+₹4.3 L (58.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DV TRADE & CONTRACTOR L3 | G.KAMLAKAR L2 | VNV ENGINEERS AND CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Trimming road side tree branches gives hindrance to road side and along the compound wall, including cutting, collecting and disposing the trimmed branches at places shown by departmental Engineer (In IGCAR Plant site fallen trees shall be disposed to the disposal yard through the CTS gate) with all lead complete all as per specifications and as directed by the Engineer-in-charge for the following sizes of tree branches. | ||||||
| 1.01 | Below 30cm girth | 4,500 | Nos. | 105 ₹4,72,500 | 90 ₹4,05,000 | 38 ₹1,71,000 Lowest |
| 1.02 | Above 30cm upto 60cm girth | 5,000 | Nos. | 120 ₹6,00,000 | 100 ₹5,00,000 Lowest | 100 ₹5,00,000 Lowest |
| 2.00Cutting and Felling all types of trees including cutting of trunks, branches and removing the roots and stacking of serviceable wood materials at places specified with a lead of 200m, disposal of unserviceable materials including filling the pits and depressions with excavated earth complete for trees of girth mentioned below complete all as directed by the Engineer-in-Charge. | ||||||
| 2.01 | Girth beyond 30cm, upto and including 60cm, measured at 0.5m above ground level | 10 | Nos. | 1,200 ₹12,000 | 1,000 ₹10,000 | 450 ₹4,500 Lowest |
| 2.02 | Girth beyond 60cm, upto and including 120cm, measured at 0.5m above ground level | 5 | Nos. | 4,500 ₹22,500 | 4,000 ₹20,000 | 1,200 ₹6,000 Lowest |
| 2.03 | Girth beyond 120cm, upto and including 240cm, measured at 0.5m above ground level | 3 | Nos. | 6,000 ₹18,000 | 5,500 ₹16,500 | 2,800 ₹8,400 Lowest |
| 2.04 | Girth above 240cm, measured at 0.5m above ground level | 2 | Nos. | 6,500 ₹13,000 | 6,000 ₹12,000 | 3,900 ₹7,800 Lowest |
| 3.00 | Hire charges towards 12.5 tonne crane for lifting the un-used concrete blocks, light-poles, electrical-drums & structural materials lying in and around the area of the building and loading them into the trucks including providing D-cycle, slings and other accessories for lifting & overhead charges for operators, fitters & helpers complete all as directed by the Engineer-in-Charge. | 17 | Hours | 1,250 ₹21,250 | 1,200 ₹20,400 Lowest | 2,000 ₹34,000 |
Tender Value
₹11.4 L
EMD Value
₹22,780
Closing Date
24 Jun 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Trimming of tree branches along the Main road in DAE complex in IGCAR during the year 2026-2027.
2026_IGCAR_912628_1
CEG/IGC/2198/2026
Open Tender
Civil Works
Item Rate
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹22,780
15 Jul 2026
11 Jun 2026
25 Jun 2026
11 Jun 2026
24 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Trimming road side tree branches gives hindrance to road side and along the compound wall, including cutting, collecting and disposing the trimmed branches at places shown by departmental Engineer (In IGCAR Plant site fallen trees shall be disposed to the disposal yard through the CTS gate) with all lead complete all as per specifications and as directed by the Engineer-in-charge for the following sizes of tree branches. | |||||
| 1.01 | Below 30cm girth | 4,500 | Nos. | - | - |
| 1.02 | Above 30cm upto 60cm girth | 5,000 | Nos. | - | - |
| 2Cutting and Felling all types of trees including cutting of trunks, branches and removing the roots and stacking of serviceable wood materials at places specified with a lead of 200m, disposal of unserviceable materials including filling the pits and depressions with excavated earth complete for trees of girth mentioned below complete all as directed by the Engineer-in-Charge. | |||||
| 2.01 | Girth beyond 30cm, upto and including 60cm, measured at 0.5m above ground level | 10 | Nos. | - | - |
| 2.02 | Girth beyond 60cm, upto and including 120cm, measured at 0.5m above ground level | 5 | Nos. | - | - |
| 2.03 | Girth beyond 120cm, upto and including 240cm, measured at 0.5m above ground level | 3 | Nos. | - | - |
| 2.04 | Girth above 240cm, measured at 0.5m above ground level | 2 | Nos. | - | - |
| 3 | Hire charges towards 12.5 tonne crane for lifting the un-used concrete blocks, light-poles, electrical-drums & structural materials lying in and around the area of the building and loading them into the trucks including providing D-cycle, slings and other accessories for lifting & overhead charges for operators, fitters & helpers complete all as directed by the Engineer-in-Charge. | 17 | Hours | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2198FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
2198technicalbid.pdf
Tender Documents • 2.08 MB
2198Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
BOQ_959103.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .