| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-Finance NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹23.2 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹23.8 LAccepted-Finance TUTICORIN TAMIL NADU | TUTICORIN | TAMIL NADU | 626202 | ₹23.8 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | TEAM ENGINEERING AND CONSTRUCTION | A.MURUGAN/GURU ENGINEERING |
|---|---|---|---|---|---|
| 1.00 | Providing Quarry Rubbish including cost of all materials, labour, lead, lift, hand packing consolidation by watering with plastic state etc., complete. | 281.2 | M3 | 1,29,352 ₹1.5 L | 1,40,600 ₹1.7 L |
| 2.00 | Providing PCC 1:2:4 cement concrete using OP/PP cement with 20mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 212.1 | M3 | 17,39,220 ₹20.5 L | 17,71,035 ₹20.9 L |
| 3.00 | Dismantling the existing Brick work for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete. | 6.8 | M3 | 2,312 ₹2,728.16 | 2,448 ₹2,888.64 |
| 4.00 | Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete. | 0.8 | M3 | 4,160 ₹4,908.80 | 4,320 ₹5,097.60 |
| 5.00 | Brick work in CM 1:5 using class II bricks including cost of all materials, labours, lead, lift, curing, etc. complete. | 36 | M2 | 2,66,400 ₹3.1 L | 2,70,000 ₹3.2 L |
| 6.00 | Plastering with C.M 1:5, 12 mm thick for inner surfaces including cost of all materials, labours, lead, lift, scaffolding, curing, etc. complete. | 152 | M2 | 48,640 ₹57,395.20 | 51,680 ₹60,982.40 |
| 7.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 17.2 | M2 | 10,148 ₹11,974.64 | 10,320 ₹12,177.60 |
| 8.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 3.6 | M3 | 38,700 ₹45,666 | 39,600 ₹46,728 |
| 9.00 | Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete. | 288 | Kg | 28,800 ₹33,984 | 34,560 ₹40,780.80 |
| 10.00 | Expansion Joint filling with Polysulphide sealant 10mm width - Horizontal Providing and laying with two-part elastomeric fuel resistance, UV resistant, Non-toxic once cured, resistant to flame, pouring grade liquid polysulphide sealant to fill the expansion joint, Control joints in parking area, construction joint in airport runway, Tanks, bridges & concrete roads. The sealant shall have Elongation min. 450% confirms to ASTM D 412, movement accommodation for butt joint 25% & for lap joints 50%. The sealant should meet the requirement of BS 5212, BS 4254 & ISO:11600. Ensure that apply a coat of polysulphide sealant primer @0.5L/m2 to get better adhesion on prepared surface before placing the sealant. The finished cost including surface preparation, filling foam backer rod, applying masking tape on both sides of the joint & polysulphide sealant filling on gap completely as per specification | 300 | Rm | 52,500 ₹61,950 | 57,000 ₹67,260 |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
9 Mar 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Raising the Height of the Four Wheeler Parking area Western end adjacent to Two Wheeler Parking Shed opposite to Administrative Building at TTPS
2026_EB_663603_1
CE SE C TTPS Spec.No. 393 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
Yes
11 Mar 2026
21 Feb 2026
10 Mar 2026
21 Feb 2026
9 Mar 2026
21 Feb 2026
Providing Quarry Rubbish including cost of all materials, labour, lead, lift, hand packing consolidation by watering with plastic state etc., complete.
Providing PCC 1:2:4 cement concrete using OP/PP cement with 20mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling the existing Brick work for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using class II bricks including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with C.M 1:5, 12 mm thick for inner surfaces including cost of all materials, labours, lead, lift, scaffolding, curing, etc. complete.
Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Expansion Joint filling with Polysulphide sealant 10mm width - Horizontal Providing and laying with two-part elastomeric fuel resistance, UV resistant, Non-toxic once cured, resistant to flame, pouring grade liquid polysulphide sealant to fill the expansion joint, Control joints in parking area, construction joint in airport runway, Tanks, bridges & concrete roads. The sealant shall have Elongation min. 450% confirms to ASTM D 412, movement accommodation for butt joint 25% & for lap joints 50%. The sealant should meet the requirement of BS 5212, BS 4254 & ISO:11600. Ensure that apply a coat of polysulphide sealant primer @0.5L/m2 to get better adhesion on prepared surface before placing the sealant. The finished cost including surface preparation, filling foam backer rod, applying masking tape on both sides of the joint & polysulphide sealant filling on gap completely as per specification
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_796699.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid