| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-AOC | ₹42.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹44.2 L+₹2.0 L (4.69%)Rejected-Finance | ₹44.2 L+₹2.0 L (4.69%) | L2 | Rejected-Finance L2 Tenderer |
| Sl No | Description | Qty | Unit | MUGUNDHAN L2 | VTN GROUPS L1 |
|---|---|---|---|---|---|
| 1.00Periodical Maintenance of MRL09-Kilperamanallur to Vedal Road Km 0/0 - 2/335 at Kancheepuram Block Pavement Cost Rs.34.44 lakhs Maintenance Cost Rs.9.20 lakhs | |||||
| 2.00 | Clearing the scrub jungle including all labour charges for burrying and burning etc., complete | 2,484 | Sqm | 5.67 ₹14,086.76 | 5.35 ₹13,289.4 Lowest |
| 3.00 | Earth work exavation in all classes of soils such as Sandy Soil, etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A | 621 | Cum | 125.25 ₹77,780 | 118.16 ₹73,377.36 Lowest |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 5.00 | Km 0/000 - 1/000 | 4.35 | Cum | 3,641.85 ₹15,842.06 | 3,435.71 ₹14,945.34 Lowest |
| 6.00 | Km 1/000 - 1/200 | 2.23 | Cum | 3,654.07 ₹8,148.59 | 3,447.24 ₹7,687.35 Lowest |
| 7.00Advance patch work for making up the undulation in the existing BT surface to an avrage thickness of 25mm using 13.20mm IRC size HBG metal with 44kg of bitumen for 1 cum of metal mixed in hot mix plant laying at site | |||||
| 8.00 | Km 0/000 - 1/000 | 0.77 | Cum | 3,982.91 ₹3,066.84 | 3,757.46 ₹2,893.24 Lowest |
| 9.00 | Km 1/000 - 1/200 | 0.66 | Cum | 3,995.13 ₹2,636.79 | 3,768.99 ₹2,487.53 Lowest |
| 10.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503. | 8,683.5 | Sqm | 14.16 ₹1,22,972.25 | 13.36 ₹1,16,011.56 Lowest |
Tender Value
₹43.6 L
EMD Value
₹88,000
Closing Date
3 Jul 2024, 3:00 pmClosed
The Project Director, DRDA, Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Periodical Maintenance of MRL09-Kilperamanallur to Vedal Road Km 0/0 - 2/335 at Kancheepuram Block of Kancheepuram District under PMGSY Incentive Fund 2023-24 PKG.TNKPM-01-26R-2024-25
2024_RDTN_134692_1
DIPR/1942/Tender/2024, dated.18.06.2024
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA, Kancheepuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹88,000
O/o The Project Director, DRDA, Kancheepuram
3 Oct 2025
18 Jun 2024
3 Jul 2024
18 Jun 2024
3 Jul 2024
18 Jun 2024
25 Jun 2024
Amount
Periodical Maintenance of MRL09-Kilperamanallur to Vedal Road Km 0/0 - 2/335 at Kancheepuram Block Pavement Cost Rs.34.44 lakhs Maintenance Cost Rs.9.20 lakhs
Clearing the scrub jungle including all labour charges for burrying and burning etc., complete
Earth work exavation in all classes of soils such as Sandy Soil, etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing BT surface to an avrage thickness of 25mm using 13.20mm IRC size HBG metal with 44kg of bitumen for 1 cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Providing and laying of Hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms, per sq.m. area thickness of 2.50mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level, uniform and free from streaks and holes etc, complete(as per MoRTH specification No. 803)
Providing and fixing of Sign Boards retro reflectorised Cautionary Mandatory and Informatory sign as per IRC :67-2010) made of high intensity grade sheeting vide clause 801.3 fixed over aluminum sheeting 1.5mm thick fixed on back supporting frame and supported on a mild steel single angle iron post 75x75x6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45x45x60cm, 60 cm below ground level asper approved drawing
a.60 cm Equilateral triangle cautionary signboard
b. 60 cm Circle(MANDATORY SIGN)
c.Road Marker/ Road stud with lens Reflector
d.Chevron signs 90 cm Octogon(Stop)
Provision for KM Stone
Provision for HM Stone
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MUGUNDHAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .